Loading...
HomeMy WebLinkAbout2019.11.20_CCO.p8.D_Monthly Emissions Report The Chemours Company Fayetteville Works 22828 NC Highway 87 W Fayetteville, NC 28306 November 20, 2019 Michael Abraczinskas Director, Division of Air Quality 1641 Mail Service Center Raleigh, NC 27699-1641 michael.abraczinskas@ncdenr.gov Re: Monthly Emissions Report Pursuant to Consent Order Paragraph 8 Dear Mr. Abraczinskas, Pursuant to Paragraph 8.d of the Consent Order, please find enclosed the November monthly emissions report for GenX Compounds from Fayetteville Works, prepared with support from our consultant, ERM NC, Inc. (“ERM”). The report shows the estimated GenX Compounds emissions through October, the projected emissions for the rest of the year, and the assumptions that underlie the estimates. Based on the identified assumptions, ERM’s calculations show that the facility has met the Consent Order’s 82% requirement for plant-wide interim reductions of emissions of GenX Compounds (for the period from October 6, 2018 through October 5, 2019) and will meet the Consent Order’s 92% reduction requirement (for Calendar Year 2019). As with the prior monthly emissions reports, the spreadsheet file with the calculations underlying the enclosed report contains confidential business information of Chemours, so we will send that spreadsheet file under separate cover directly to you, and the spreadsheet file will not be further distributed or posted on Chemours’ website. If you have any questions, please contact me at Brian.D.Long@chemours.com. Sincerely, Brian D. Long Plant Manager Chemours – Fayetteville Works 2 Enclosure November 2019 Monthly Emissions Report Cc: Sheila Holman, DEQ William F. Lane, DEQ Francisco Benzoni, NC DOJ Michael Scott, DWM Linda Culpepper, DWR David C. Shelton, Chemours John F. Savarese, WLRK Kemp Burdette, CFRW Geoff Gisler, SELC