HomeMy WebLinkAbout2019.11.20_CCO.p8.D_Monthly Emissions Report The Chemours Company
Fayetteville Works
22828 NC Highway 87 W
Fayetteville, NC 28306
November 20, 2019
Michael Abraczinskas
Director, Division of Air Quality
1641 Mail Service Center
Raleigh, NC 27699-1641
michael.abraczinskas@ncdenr.gov
Re: Monthly Emissions Report Pursuant to Consent Order Paragraph 8
Dear Mr. Abraczinskas,
Pursuant to Paragraph 8.d of the Consent Order, please find enclosed the November
monthly emissions report for GenX Compounds from Fayetteville Works, prepared with support
from our consultant, ERM NC, Inc. (“ERM”). The report shows the estimated GenX
Compounds emissions through October, the projected emissions for the rest of the year, and the
assumptions that underlie the estimates. Based on the identified assumptions, ERM’s
calculations show that the facility has met the Consent Order’s 82% requirement for plant-wide
interim reductions of emissions of GenX Compounds (for the period from October 6, 2018
through October 5, 2019) and will meet the Consent Order’s 92% reduction requirement (for
Calendar Year 2019).
As with the prior monthly emissions reports, the spreadsheet file with the calculations
underlying the enclosed report contains confidential business information of Chemours, so we
will send that spreadsheet file under separate cover directly to you, and the spreadsheet file will
not be further distributed or posted on Chemours’ website.
If you have any questions, please contact me at Brian.D.Long@chemours.com.
Sincerely,
Brian D. Long
Plant Manager
Chemours – Fayetteville Works
2
Enclosure
November 2019 Monthly Emissions Report
Cc:
Sheila Holman, DEQ
William F. Lane, DEQ
Francisco Benzoni, NC DOJ
Michael Scott, DWM
Linda Culpepper, DWR
David C. Shelton, Chemours
John F. Savarese, WLRK
Kemp Burdette, CFRW
Geoff Gisler, SELC