Loading...
HomeMy WebLinkAbout5602_ROSCANS_20051 MCDOWELL COUNTY y`b PUBLIC WORKS MIKE GLADDEN, DIRECTOR 60 EAST COURT STREET MARION, NC 28752 November 7, 2005 Mr. Al Hetzell Division of Waste Management Solid Waste Section 2090 US Highway 70 Swannanoa, NC 28778 Re: Construction at the Transfer Station Dear Al, As you are aware, the Transfer Station tipping floor is in need of repair, and it seems that about every 5 to 6 years we will routinely make repairs until we invent a better system. Budget planning is coming up soon and again I will try to install water lines for hydrants in the Transfer Station area for wash down and fire protection. Having a clean floor will reduce abrasion and extend the tipping floor life some. As we make plans for the tipping floor repair, I will request that we construct a secondary loading station, adjacent to the current floor, so that we can operate without any problems while the main floor in under construction. After construction is complete, the second loading area would then become our Load Screening area as needed, but also would accept daily waste from non -self unloading vehicles. This should help our traffic problems and prevent some contaminated or hot loads from entering the main tipping floor. I have a two part question. Will we need to request an operating permit amendment for the second loading area, and if my request to construct a second area is denied, will I be able to obtain a permit for a "Temporary Management Area During Repair of the Transfer Facility"? Loading from the ground will be my last choice, however, possible. I am just initiating some early planning, but get back to me as soon as possible. Thank you, Mike Gladden MG/gms cc: Charles Abernathy file SITE LOCATION: 3849 HWY. 226 SOUTH MARION, NC 28752 PHONE: (828) 659-2521 FAX: (828) 652-2688