HomeMy WebLinkAbout8806_ROSCANS_1991e � srAreel
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Solid Waste Management
P.O. Box 27687 - Raleigh, North Carolina 27611-7687
James G. Martin, Governor
William W. Cobey, Jr., Secretary
March 21, 1991
Mr. Edward V. Hallowell
Dupont E. I. NeMours
Imaging Systems
Brevard, NC 28712
Dear Mr. Hallowell:
William L. Meyer
Director
In response to your March 13, 1991, letter, I make the following
comments:
1. Moving the zinc contaminated soil from one pit to another would
entail obtaining approval from personnel of the Division of
Environmental Management responsible for regulating wastewater
processes and/or Groundwater personnel. This Section would not
regulate- the interim storage of this material which you
propose in your letter.
2. If you decide to transfer any of the zinc contaminated soil to
your industrial landfill, make sure that your solid waste
permit allows you to dispose of this type of material (the
permit will specify the types of materials the landfill is
approved to receive). If the permit allows for disposal of
this type of material, appropriate waste determination
approvals must be secured from Bill Hocutt, Chemist, in our
Raleigh office.
If you have questions, please let me know.
Sincerely,
James E. Patterson
Waste Management Specialist
Solid Waste Section
JEP:a
cc: r. Julian Foscue
Mr. Bill Hocutt
An Equal Opportunity Afiirmative Action Employer
-JULi1'A k i ,
(� ) re- t� a, co pq o � Ya )c-ifzv -l- ✓I,
� 1� rr•
IMAGING SYSTEMS
' Brevard, North Carolina 28712
March 13, 1991
James E. Patterson
Route 1, Box 179
Hayesville, North Carolina 28904
Dear Mr. Patterson:
�> hl '-Pp
e;-sou
From our 3/11/91 phone conversation, it's my understanding that we may move zinc contaminated
soil (not a RCRA hazardous waste) within the zinc chloride pits until a permanent remediation plan is
developed. We are constructing a new building, where part of it will overlap the old zinc pits. These pits
were in use in 1957-63 and were filled in during the 1960s.
The top 10 feet of soil has very little zinc chloride and is fill dirt. We would like to move a section
of this top soil layer to either the adjacent settling pond (no longer in used and now being filled with dirt) or
to our plant landfill as cover dirt (labeled "hole A" in attached drawing).
The next 10 to 20 feet level has several thousand ppm total zinc (9-71 ppm extractable). We would
like to move this soil which is under the proposed building site into "hole A" created as described above (see
diagram). The zinc would remain in the pit area and under our control until a permanent remediation plan is
developed for the entire zinc chloride contaminated area. The location under the new building would no
longer contain zinc due to this excavation.
We would like to start soil removal for the building foundation in one month; and unless I hear from
you otherwise, I will assume this plan is satisfactory.
If there are any further questions, please call me at (704) 885-5671.
tg
Attachment
Sincerely,
��� �/ �p r �Xxl �- -�
Edward K. Hallowell
Chemist
Safety, Health, and Environment
Better Things for Better Living
IM 69 KLV W'U.
;. DEPARTMENT OF HUMAN RESOURCE
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
r
PERMIT NUMBER
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
(a) Construction plans shall be approved and followed.
(b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
(a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
(b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
(c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
(a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
(b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
(b) Surface water shall not be impounded over or in waste.
(c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
(a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
(b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
(a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
(b) Solid waste shall not be disposed of in water.
(c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
(a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
(b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE: —
NAME:
(9) SIGN REQUIREMENTS
(a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
—(b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
(c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
(d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1,1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. O. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
Purpose: G.S.130A-294 requires that an inspection program be established for the operation of solid
waste management facilities on a statewide basis. The N.C. Solid Waste Management Rules
codified 10 NCAC 10G, Section .0505 list specific operational requirements which must be
followed by sanitary landfills.
Preparation: Solid and Hazardous Waste Branch personnel shall complete the inspection form each time
they conduct an official inspection. The form shall be signed by the person(s) receiving the
report.
Distribution: 1. White copy to Raleigh office
2. Yellow copy to facility
3. Green copy to preparer
Disposition: This form may be destroyed in accordance with Standard 7, Inspection Records, of the
Records Disposition Schedule published by the N.C. Division of Archives and History.
Order additional forms from:
Solid and Hazardous Waste Management Branch
Division of Health Services
P. O. Box 2091
Raleigh, NC 27602-2091
DEPARTMENT OF HUMAN RESOURCE
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
PERMIT NUMBER
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
(a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
(a) Solid waste shall be restricted into the smallest area feasible.
(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
(b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
(c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
(b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10)
(5) DRAINAGE CONTROL REQUIREMENTS
(a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
(c) Completed areas shall be adequately sloped to allow surface (11)
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
(a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
(b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
(a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
(b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
(a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
(b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
(c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
(a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
(d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1,1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. O. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
(a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
(b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
DATE: NAME:
Solid and Hazardous Waste Management Branch
DHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
Purpose: G.S.130A-294 requires that an inspection program be established for the operation of solid
waste management facilities on a statewide basis. The N.C. Solid Waste Management Rules
codified 10 NCAC 10G, Section .0505 list specific operational requirements which must be
followed by sanitary landfills.
Preparation: Solid and Hazardous Waste Branch personnel shall complete the inspection form each time
they conduct an official inspection. The form shall be signed by the person(s) receiving the
report.
Distribution: 1. White copy to Raleigh office
2. Yellow copy to facility
3. Green copy to preparer
Disposition: This form may be destroyed in accordance with Standard 7, Inspection Records, of the
Records Disposition Schedule published by the N.C. Division of Archives and History.
Order additional forms from:
Solid and Hazardous Waste Management Branch
Division of Health Services
P. O. Box 2091
Raleigh, NC 27602-Z091
aU PONr
IMAGING SYSTEMS
Brevard, North Carolina 28712
October 28,1991
Mr. James E. Patterson
Route 1, Box 179
Hayesville, North Carolina 28904
Dear Jim:
Subject: Additional Responsibilities within the North Carolina Solid Waste Management Act
I am responding to a September 16, 1991, directive by Dexter Matthews to
submit a plan to weigh solid waste at our facility. Beginning October 15 we started weighing
all solid waste materials according to the attached "Daily Solid Waste Report." This
information will be compiled and sent to you on or before August 1, 1992, and each year
thereafter. It is our intent to comply with House Bill 1109's waste reduction goal of 25% by
June 30,1993, and the 40% reduction goal by 2001.
Please call me at (704) 885-5733 if you have questions or concerns.
tg
Attachment
cc: J. P. Andrus
E. K. Hallowell
File No. LND2750
Sincerely,
Robert A. Spencer
Safety & Environmental Manager
Better Things for Better Living
IM-69 REV 5/90
1 of
Operator
DAILY SOLID WASTE REPORT
Date
No.
Area
Location
Color
Mon
Tues
Wed
Thr
Fri
Sat
Sun
AM or PM
1
Stores
Receiving
B
2
Fin
Slit Chop
B
3
Fin
Fin Ship Dock 1
B
4
Fin
Fin Ship Dock 1
G
5
BEAT
SW Parking Lot
B
61
BEAT
W Parking Lot
B
7
BEAT
SW Parking Lot (Al)
B
8
BEAT
W Parking Lot(Al)
B
9
Coat
Saveall
B
10
Coat
Saveall
G
11
Const.
TC2
G
12
Const.
Butler Building
G
13
Const.
TC3
B
14
Const
TCNew
B
15
C&S
Gel Dock
B
16
C&S
Gel Dock
Y
x
x
x
x
x
x
x
17
C&S
Gel Dock
G
18
Const.
Gel Dock
B
19
C&S
Line 5 Dock
B
20
C&S
Line 5 Dock
B
21
C&S
Line 5 Scrap Flake
B
22
C&S
Rewind
B
23
C&S
Rewind
2012
Operator
DAILY SOLID WASTE REPORT
No.
Area
Location
Color
Mon
Tues
Wed
Thr
Fri
Sat
Sun
_
24
CP
Liguid Dumpster L 5
Wet
25
CP
Liguid Dumpster L3
Wet
26
CP
Carbon Slurry L3
Wet
27
CP
Pad
B
28
CP
Pad
G
291
P&O
Power House
G
30
Fin
X461 Warehouse
B
31
Fin
X461 Warehouse
G
32
Maint.
P&O Shop
B
33
Maint.
P&O Shop
G
34
R&D
South Dock
Y
x
x
x
x
x
x
x
35
R&D
South Dock
G
36
R&D
West Dock
B
37
R&D
West Dock
G
38
R&D
West Dock
B
39
R&D
South Dock
B
40
ERD
Cafeteria
Y
x
x
x
x
x
x
x
41
ERD
Cafeteria
Y
x
x
x
x
x
x
x
42
ERD
Cafeteria
G
43
Fin
Fin Day Shop
GMetall
x
x
x
x
x
x
x
44
Maint.
Machine Shop
GMetall
x
x
x
x
x
x
x
45
C&S
Line 5 Dock
GMetall
x
x
x
x
x
x
x
46oat
Gel Base men
GMetal
x
x
47
R&D
South Dock
GMetal
x
x
x
x
x
x
x
48
Maint.
P&O Shop
GMetal
x
x
x
x
x
x
x
49
IES
AFBoiler
G
50
ERD
AVL Waste Man.
Y
x
x
x
x
x
x
x
51
ERD
AVL Waste Man.
Y
x
x
x
x
x
x
x
52
ERD
AVL Waste Man.
Y
x
x
x
x
x
x
x
53
Const.
AVL Waste Man.
Y
Total
0
0
0
0
0
0
0
B = Material
incinerated in Alternate Fuels Boiler
Y= Collected by Asheville Waste Management truck weighed
before
entering and
also leaving the plant.
G = Weight of material sent to DuPont Landfill
G Metal= Recycled to Metal Vendor
NC DEPARTMENT OF I IRONMENT, HEALTH AND NATU L RESOURCES
Division of Solid haste Management
Solid Waste Section
SOLID WASTE MANAGEMENT FACILITY EVALUATION REPORT
Type of Fac i l i ty, ) L .� �, i Trr - Perm t # County.
Name of Facility. , ;V%+ '`' Location
Date of Last Evaluation
I. Permit Conditions Followed Yes No N/A
A. Specific Condition(s) Violated
II. Operational Requirements Followed Yes No
15A N.C. Admin. Code 138 Section - 1) '5 () 5
A. Specific Violations) by number and letter.
III. Other Violations of Rule or Law
IV. Evaluator's Com>ients
V. Continuation Page Recpired7 Yes No Receiving Signature
Evaluation Date Solid Waste Section
DEHNR 3793 (Part I White: Facility Part II Canary: Central Office
Solid Waste Section (Review 7/94)
Part III Pink: Regional Office)
Purpose: G.S. 130A-294 requires that an evaluation program be established for the
operation of solid waste management facilities on a statewide basis. The
Solid Waste Management Act and Solid Waste Management Rules codified at
15A NCAC 13B list its which must be followed by solid waste
facilities.
Instructions: Solid Waste Section personnel shall complete the evaluation form each
time they conduct official evaluations. The form shall be signed by
the person(s) receiving the report.
Distribution: b ti on: Part I White: facility copy
Part II Canary: Raleigh central office file copy
Part III Pink: Regional office file copy
Disposition: This form may be retained in accordance with the Record Retention and
Disposition Schedule of the Solid Waste Section, Solid Waste Management
Division of the Department of Environment, Health and Natural Resources.
IMAGING SYSTEMS
Brevard, North Carolina 28712
January 16, 1991
Mr. James E. Patterson
Department of Environmental Management
Solid and Hazardous Waste Management Branch
Route 1, Box 179
Hayesville, North Carolina 28904
Dear Mr. Patterson:
We would like to close out the section in the North landfill that was used for
putrescible waste. This section has not been used in at least five years and when in use was
required to be covered with dirt daily. We now use the North landfill only as a demolition
landfill and a disposal area for asbestos (infrequent and small amounts only). The current
landfill use requires dirt cover only periodically and when in use.
Since we no longer use this landfill area or plan to use it in the future, we would like
to close it out and remove it off the list as an active landfill. Attached is a map of the landfill
with the area to be closed out marked off. If there are any questions, please call me at (704)
885-5671.
M
Attachment
Sincerely,
Edward K. Hallowell
Chemist
Safety, Health, and Environment
Better Things for Better Living
IM-69 REV 5/90
PON
IMAGING SYSTEMS
Brevard, North Carolina 28712
March 13, 1991
James E. Patterson
Route 1, Box 179
Hayesville, North Carolina 28904
Dear Mr. Patterson:
From our 3/11/91 phone conversation, it's my understanding that we may move zinc contaminated
soil (not a RCRA hazardous waste) within the zinc chloride pits until a permanent remediation plan is
developed. We are constructing a new building, where part of it will overlap the old zinc pits. These pits
were in use in 1957-63 and were filled in during the 1960s.
The top 10 feet of soil has very little zinc chloride and is fill dirt. We would like to move a section
of this top soil layer to either the adjacent settling pond (no longer in used and now being filled with dirt) or
to our plant landfill as cover dirt (labeled "hole A" in attached drawing).
The next 10 to 20 feet level has several thousand ppm total zinc (9-71 ppm extractable). We would
like to move this soil which is under the proposed building site into "hole A" created as described above (see
diagram). The zinc would remain in the pit area and under our control until a permanent remediation plan is
developed for the entire zinc chloride contaminated area. The location under the new building would no
longer contain zinc due to this excavation.
We would like to start soil removal for the building foundation in one month; and unless I hear from
you otherwise, I will assume this plan is satisfactory.
If there are any further questions, please call me at (704) 885-5671.
tg
Attachment
Sincerely,
Edward K. Hallowell
Chemist
Safety, Health, and Environment
Better Things for Better Living
IM-69 REV 5/90
S
ZINC CHLORIDE PITS
Test borings for zinc chloride
A. Dig up top 10 feet and
move to Sludge Pond.
B. Dig up top 10 feet and move
to Sludge Pond or Landfill.
Move the 10-20 foot layer to
hole created at "A".
45
46
Z
0
Imo- scale 100--N�
(approximate)
tN
EKH
3/12/91
WJ UUL
ZINCPIT.XLS
TABLE #1
ZINC CHLORIDE PIT INVESTIGATION
ANALYTICAL RESULTS
BREVARD, NC
as received
dry wG basis
as received
dry w L basis
BORING
SAMPLE #
CHLORIDE
CHLORIDE
MOISTURE
TOTAL ZINC
TOTAL ZINC
TCLP ZINC
(ppm)
(ppm)
(% by wt.)
(ppm)
(ppm)
(ppm)
TB-44C
0-5'
9
10
9.9
22
24
0.8
15-10
7
8
18.5
23
29
2.3
'10-15
13
18
29.9
32
46
4
'15-20
16
19
16.8
354
425
3.5
120-25
4
5
19.4
28
35
1.3
25-30.
4
5
19.3
20
25
1.1
W-35
3
4
20.8
14
18
0.5
'35-40
4
5
22.3
10
13
ND
TS-45C
'0-5
3
4
11
23
26
0.9
15-10
9
11
18.1
241
294
-2.1
110-15
38
108
64.9
11500
32900
71
'15 20
19
27
30.9
3730
5400
24.7
'20-25
9
11
22.1 1
707
907
4.9
T5-30
7
8
18.5
33
40
1.7
'30-35
6
7
22.9
146
189
ND
'35-40
5
6
22.9
21
27
0.9
TB-999A
duplicate
5
6
22.4
25
33
1
r
TB-46C
10-5
3
3
9.7
27
30
1.9
15-10
7
8
15.1
22
26
0.6
110-15
17
28
41.1
10700
18100
39.4
'15
20
14
23
37.6
5970
9560
29.4
'20
25
5
6
20.7
33
41
2.5
W 30
5
6
21
27
34
1.9
130-35
5
6
18.7
24
30
1.1
TB-47C
i
T13-48C
V-5
3
3
13.2
43 i
49
ND
15-10
2
3
13.9
26
30
ND
110-15
7
9
20.1
1690
2110
9.9
TB-49C '0-5
2
3
14.2
36
42
ND
15-10
10
14
28
48
67
0.2
Page 1
03/11/91 17:16 'U302 366 41L3 liNVu
W..J u u.5
-ro
ZINCPIT.XLS
TABLE #1
ZINC CHLORIDE PIT INVESTIGATION
ANALYTICAL RESULTS
BREVARD,NC
as received
dry wL basis
as received
dry WL basis
BORING
SAMPLE #
CHLORIDE
CHLORIDE
MOISTURE
TOTAL ZINC
TOTAL ZINC
TCLP ZINC
1,110-15
(ppm)
(ppm)
(% b wt.)
(ppm)
(ppm)
(ppm)
11
17
32.9
5420
8080
17.5
'15-20
4
5
14.1
113
132
1
TB-50C
'U 5
6
7
16:2
41
48
ND
TB-999B
duplicate
5
6
14.1
234
273
1
15-10
5
7
28.1
1930
2690
8.2
'10-15
4
5
15.2
2090
2460
20.5
TB-51C
'0-5
7
8
16.5
62
74
ND
15-10
5
6
15.4
17
20
ND
110-15
3
4
18.1
16
20
ND
'15-20
4
5
20
19
24
ND
'20-25
3
4
20.6
16
20
ND
425-30
_ 4
4
18.9
13
16
ND
130-35
8
11
22.7
7
9
ND
'35-40
7
9
20.4
14
17
ND
TB-52C , '0-5
14
16
14.9
143
168
0.6
'5-10
16
23
27.8
45
63
ND
'10-15
5
6
22.5
45
57
0.2
'15
20
9
11
17.2
12
14
0.2
'20-25
5
6
14
12
14
ND
'2550
1
4
5
23.9 1
16
22
ND
130-35
3
4
19.6
19
23
ND
'35-40
3
4
16.8
27
33
ND
TB-530 '0-5
7
8
11.4
61
69
ND
'5-10
95
180
47.4
5000
9500
29.6
'10-15
197
360
45.3
26500
48500
172
TB-999D duplicate
250
887
71.8
33600
119000
204
TB-54C '0-5
6
7
6.2
29 1
31
ND
15-10
6
6
9.8
30
33
ND
110-15
5
6
15.5
797
943
29.3
WjUU4
ZINCPIT.XLS
TABLE #1
ZINC CHLORIDE PIT INVESTIGATION
ANALYTICAL RESULTS
BREVARD, NC
as received
dry wL basis
as received
dry wt. basis
BORING
SAMPLE #
CHLORIDE
CHLORIDE
MOISTURE
TOTAL ZINC
TOTAL ZINC
TCLP ZINC
(ppm)
(Ppm)
by wt-)
(PPm)
(ppm)
(ppm)
TB-55C
'0-5
6
8
23
34
45
ND
'54 0
7
12
41.3
12100
20600
60.7
110-15
6
9
35.1
10500
16200
66.5
'15 20
5
6
17.6
289
351
4.4
TB-56C
'0-5
5
6
17.2
33
40
ND
15-10
6
8
28.8
6300
8840
15.7
'10-15
8
10
17.9
74
90
0.3
TS-999C
duplicate
7
8
14.5
51
59
0.4
'15 20
6
7
17.7
82
99
0.5
'20 25
5
6
17.5
62
75
0.4
'25-30
W-35
4
4
15
31
36
ND
TB-57C
'0-5
9
10
9.9
20
22
ND
15-10
7
8
15
12
14
ND
110-15
6
7
20.4
19
24
ND
'15-20
6
7
19.4
22
28
ND
'20 25
6
7
19
48
59
0.4
25-30
4
5
16.5
29
34
ND
'30-35
4
5
14.6
29
35
0.3
�35-40 1
3
3
12
31
36
ND
TB-58C 10-5
11
12
11.2
39
43
0.3
15-10
32
54
40.1
12800
21300
39.5
'10-15
18
24
26.8
2340
3200
28.1
115-20
7
8
19
255
315
2.2
'20-25
5
6
17.9
56 1
68
1.2
425-30
5
6
16.1
40
48
0.4
W-35
5
6
16.7
i 3
16
0.4
'35-40
4
5
12.6
18
20
ND
TB-59C 10-5
5
5
11.3
38
43
ND
16-10
6
25.4
25
34
0.3
'10-15
L4:J-
5
28.4
120
168
8.8
pana't
03/11/91 17:17 %2302 366 4113 ENGG
WI uuo
ZINCPIT.XLS
TABLE #1
ZINC CHLORIDE PIT INVESTIGATION
ANALYTICAL RESULTS
BREVARD, NC
as received
dry wL basis
as received
dry wt. basis
BORING
SAMPLE #
CHLORIDE
CHLORIDE
MOISTURE
TOTAL ZINC
TOTAL ZINC
TCLP ZINC
(ppm)
(ppm)
(% by M.)
(ppm)
(ppm)
(ppm)
15-20
3
3
20.6
37
46
ND
'20-25
5
6
19
16
20
0.4
'25-30
1 3
3
19.5
13
16
ND
130-35
3
4
19.1
13
16
1
'35-40
3
4
19.2
19
24
ND
TB-60C
'0-5
9
10
9.7
119
132
0.4
15-10
8
10
16.4
41
49
ND
110-15
9
14
37.6
6710
10800
44
'15-20
6
8
22.8
468
606
3.1
'20 25
6
7
17.8
77
94
. 1.2
TB-61 C
'0-5
4
4
11.2
24
27
ND
15-10
3
4
17
29
35
0.6
'10-15
5
7
24.9
10
13
0.2
TB-888A
equlp.blk
ND
3
T84888B
equip.blk
ND
1.3
TB-888C"
equip.blk
ND
ND
TB-888D 1equip.blk
ND
ND
Page 4