Loading...
HomeMy WebLinkAbout2020.01.31_CCO.p12_LetterToCapeFearRiverWatchPFASLoadingReductionPlan The Chemours Company Fayetteville Works 22828 NC Highway 87 W Fayetteville, NC 28306 January 31, 2020 Kemp Burdette Cape Fear River Watch 617 Surry Street Wilmington, NC 28401 (910) 762-5606 kemp@cfrw.us Re: Cape Fear River PFAS Loading Reduction Plan - Supplemental Information Report - Responses to CFRW Comments Dear Mr. Burdette, On December 19, 2019, Cape Fear River Watch (CFRW) provided comments to Chemours on the November 4, 2019 Cape Fear River PFAS Loading Reduction Plan - Supplemental Information Report submitted by Chemours under paragraph 12 of the Consent Order. Chemours’s consultant Geosyntec Consultants of NC, P.C. (Geosyntec) has prepared the enclosed memorandum responding to those comments and providing the requested clarifications and additional information. Chemours is mindful of CFRW’s concerns regarding the anticipated timeframes for reductions, and the proposed reductions actions are being designed to deliver expeditious results without compromising on effectiveness. We hope that the responses address your concerns and would be glad to arrange a time for discussion for any remaining questions so as to facilitate the timely amendment of the Consent Order to incorporate the paragraph 12 requirements. Sincerely, Brian D. Long Plant Manager Chemours – Fayetteville Works Enclosure Responses to CFRW Comments on Cape Fear River PFAS Loading Reduction Plan - Supplemental Information Report 2 Cc: Sheila Holman, DEQ William F. Lane, DEQ Francisco Benzoni, NC DOJ Michael Abraczinskas, DAQ Michael Scott, DWM Linda Culpepper, DWR David C. Shelton, Chemours John F. Savarese, WLRK Geoff Gisler, SELC