HomeMy WebLinkAbout1812_DukeMarshall_Phase 2_UnderdrainTemporaySampleLocation_1636956_20220107Industrial Landfill No. 1
Phase
2, Cell
5 Underdrain
Temporary Underdrain Discharge Line
Setup and
Proposed
Sample
Location
Temporary flex pipe for underdrain discharge
Industrial Landfill No. 1
Phase
2, Cell
5 Underdrain
Temporary Underdrain Discharge Line
Setup and
Proposed
Sample
Location
Temporary flex pipe for underdrain discharge
Industrial
Landfill No. 1
Phase 2, Cell 5
Underdrain
Temporary Underdrain
Discharge Line Setup and
Proposed Sample
Location
Discharge point within the ash basin, and within
one of the rim ditches maintained as part of
excavation in the future phases area
Industrial Landfill
No. 1 Phase 2,
Cell 5 Underdrain
Temporary Underdrain
Discharge Line Setup and
Proposed Sample Location
• Follow-up email/letter to
documenting the alternative
sample location
• Survey point and photos of
alternative sample location for
documentation in the February
2022 ECMP Report