HomeMy WebLinkAbout2020.07.21_CCO.p28_Long to Holman re Submission of Quarterly Progress Report Pursuant The Chemours Company
Fayetteville Works
22828 NC Highway 87 W
Fayetteville, NC 28306
July 21, 2020
Sheila Holman
Assistant Secretary for the Environment
1601 Mail Service Center
Raleigh, NC 27699-1601
sheila.holman@ncdenr.gov
Re: Submission of Quarterly Progress Report Pursuant to Consent Order Paragraph 28
Dear Ms. Holman,
Chemours is pleased to submit the enclosed quarterly progress report, as required under
paragraph 28 of the Consent Order entered by the Superior Court for Bladen County on February
25, 2019. This quarterly progress report details the work and activities undertaken and
completed pursuant to the Consent Order for the period from April 1, 2020 to June 30, 2020.
During the second quarter of 2020, Chemours continued its comprehensive work to
implement the projects set forth in the Consent Order. Significant actions undertaken during this
reporting period include:
· Chemours continued to operate its thermal oxidizer facility, which is destroying over
99.99% of all PFAS air emissions routed to it.
· All of Chemours’s process wastewater continues to be captured and safely disposed of
off-site.
· Significant work continues to reduce the remaining PFAS loadings from surface water
and groundwater to the Cape Fear River, including continued design of proposed
corrective actions and mass loading sampling.
· Chemours continues to provide replacement drinking water supplies to qualifying
residences and other private well users. Approximately 2300 residences are receiving
bottled water, and whole building and under sink filtration systems have been installed at
over 800 residences.
We are focused and intent on ensuring that the Consent Order implementation continues
to proceed in the same manner.
2
As always, if you have any questions or need any additional information concerning this
report, or the Consent Order implementation generally, please contact me at
Brian.D.Long@chemours.com.
Sincerely,
Brian D. Long
Plant Manager
Chemours – Fayetteville Works
Enclosure
Quarterly Progress Report
Cc:
William F. Lane, DEQ
Francisco Benzoni, NC DOJ
Michael Abraczinskas, DAQ
Michael Scott, DWM
Danny Smith, DWR
David C. Shelton, Chemours
John F. Savarese, WLRK
Kemp Burdette, CFRW
Geoff Gisler, SELC