HomeMy WebLinkAbout1203_ROSCANS_2007ENGINEERING, INC.
February 14, 2007
Mr. Jim Coffey
North Carolina Department of Environment and Natural Resources
Division of Waste Management
Asheville Regional Office
2090 US Highway 70
Swannanoa, North Carolina 28778
Re: Burke County C&D Landfill
Request for Modification to Solid Waste Permit #12-03
JEI Project No. 277.06, Task 12
Dear Jim:
Waste Industry Experts
Joyce Engineering, Inc
2211 W. Meadomiew Road
Suite 101
Greensboro, NC 27407
tel: 336/323-0092
fax: 336/323-0093
www.JoyceEngineering.com
rm-"o4Z
�� ISSv�D 02%Aof 0 i
On behalf of Burke County, we are writing to follow up on a request for a vertical expansion of the
John's River C&D landfill. The original request from October 9, 2006 was prepared using mapping
from approximately 1995. The plans have now been updated using aerial topographic information
obtained from the NC DOT GIS web site from a flight conducted on September 9, 2006. The attached
drawings have been updated to illustrate how the additional capacity may be achieved without
modifying the slopes, drainage patterns or operations of the existing facility. In addition to the original
submittal, an approximate grading line has been established to show the approximate waste contours
as of 7/1/08 when the new C&D landfill regulations become effective fort he facility.
The County desires to extend the useful life of this facility as long as practical to allow time to pursue
permitting a new C&D landfill on site. This permitting process will begin shortly and will include as a
part of the permitting process, the submittal of an amended landfill application that is in accordance
with the new regulations. Current projections show the vertical expansion providing enough landfill
space to meet the County's needs until October 2010.
Please feel free to call meat (336) 323-0092 for additional information. Thank you for your assistance
in this matter and we look forward to working with you on this project.
Sincerely,
JOYCE ENGINEE > ) G, INC.
l
Evan Andrews, P.E.
Project Manager
Attachments
C: Jeff Boss, Burke County
PABurke County\C&D Johns Rix•er IVaste -Management Facility\Engineering\27 7.00T12 - General Engineering
Consulting\Correspondence\CfeD vertical expansion follow up lettendoc
I rw�►�wM
� maw mom
IM W MINK A Upw
ENGINEERING, INC.
Job: Burke County
Job Number: 277.30
Calculated By: RFB Date: 2/7/2007
Checked By: �" : Date:
Subject: Capacity Study February 2007
Determine the densitV of compacted waste per cubic vard of airspace between June 19. 1995 and September 5. 2006
Airspace consumed by waste and cover soil = 404,868 cy volume from AutoCadd
between the two mapping dates :
Total waste placed in the landfill between the = 116,637 tons scalehouse records
two mapping dates:
= 233,274,000 Ibs unit conversion
Calculated In -Place Density of Waste and Soil.
Estimate the remaining life
Total remaining capacity:
Volume of Intermediate Cover:
Remaining volume for waste and daily cover:
Projected in -place density of waste and soil: (D)
Projected remaining tonnage:
Projected waste stream: (Wa)
Projected remaining life
as of Sept 2006.
576 Ibs/cy
83,756 cy volume from AutoCadd
36,939 cy
46,817 cy
= 576 Ibs/cy
13,487 tons
= 1,269 tons per month
Landfill Parameters:
Wa = average monthly waste acceptance rate
(avg. from 06/19/05 through 09/05/06)
D = calculated in -place density of waste
Remaining Capacity
0.9 years (no growth rate)
1,269 tons/month
576 Ibs/yd3
83,756 cy
burke Annual Facility Report Check
�► fir' sir
IINNAI1Al AW IM O OWN
W1qQW 0 NNARM
ENGINEERING, INC:.
Job: Burke County
Job Number: 277.30
Calculated By: RFg Date: 2/7/2007
Checked By: Date: �j,-y/r^
Subject: Capacity Study February 2007
Determine the density of compacted waste per cubic yard of airspace between June 19, 1995 and September 5,200
Airspace consumed by waste and cover soil = 404,868 cy volume from AutoCadd
between the two mapping dates:
Total waste placed in the landfill between the = 116,637 tons scalehouse records
two mapping dates:
233,274,000 Ibs unit conversion
Calculated In -Place Density of Waste and Soil. = 576 Ibs/cy
Estimate the remaining life
Total remaining capacity:
Volume of Intermediate Cover:
Remaining volume for waste and daily cover:
Projected in -place density of waste and soil: (D)
Projected remaining tonnage:
Projected waste stream: (Wa)
Projected remaining life
as of Sept 2006.
Landfill Parameters:
Wa = average monthly waste acceptance rate
(avg. from 06/19/05 through 09/05/06)
D = calculated in -place density of waste
Remaining Capacity
252,126 cy volume from AutoCadd
36,939 cy
215,187 cy
576 Ibs/cy
61,993 tons
1,269 tons per month
4.1 years (no growth rate)
= 1,269 tons/month
576 Ibs/yd3
252,126 cy
burke Annual Facility Report Check
'1f
North Carolina Department of Environment and Natural Resources
Dexter R. Matthews, Director Division of Waste Management Michael F. Easley, Governor
Solid Waste Section William G. Ross Jr.. Secretary
February 20, 2007
Mr. Jeff Boss
Burke County General Services
P.O. 1486
Morganton, North Carolina 28680
Re: Burke County John's River Waste Management Facility C&D over MSW Landfill
Permit # 12-03, Burke County, North Carolina
Dear Mr. Boss:
The Solid Waste Section hereby issues the Permit to Operate for the referenced facility to allow the
continued operation of the facility in accordance with the permit conditions and the approved operations
plan.
Please note that in accordance with Permit Condition # 2, the permit shall expire on July 1, 2008. If this
unit plans to operate beyond July 1, 2008, the owner/operator must submit a permit application in
accordance with 15A NCAC 1313, Rule .0547(4) of the recently adopted C&DLF rules.
If you have any questions about this permit, please contact me at (828) 296-4703 or Al Hetzell at (828)
296-4701 at the Asheville Regional Office.
Sincerely,
'lames C. Coffey, i {°
1 r Asheville Regional Engineer
Solid Waste Section
cc: Al Hetzell
2090 US H;-hway 70, Swannanoa, north Carolina. 28778
phone: 828-296-4500', FAX: 828-299-7043 , internet http:#wastenotnc.org
An Equal -Opponunity ! .^ilifr-Fou o .Ac loin Ei1 ploy . - Prii? 2d o'n Recyded Paper
ENGINEERING, INC.
Mr. Jeffrey Boss, P.E.
Engineer/ Director of Public Works
Burke County
P.O. Box 1486
Morganton, NC 28680
RE: Burke County -John's Diver Waste Management Facility
Fourth Quarterly Gas Monitoring Results
JEI Project No. 277.00, Task 28
Dear Mr. Boss:
Waste industry Experts
Joyce Engineering, Inc
-221-1-W. Meadomie-w Road —
Suite 101
tel: 336/323-0092
fax`3B6/323-0093
www.JoyceEnqineering.com
monitoring event -at the John's River Waste Management Facility. Landfill gas was detected
above the lower explosive limit (LEL) in gas probe GP-2. The concentrations detected are
similar to those detected during previous events. GP-2 is located in an area with a close
proximity to waste; therefore, the detection of methane gas is not unexpected. Methane was not
detected in any of the remaining site landfill gas monitoring points and probes during this field
event.
The two gas probes that were installed adjacent to the Kirksey Drive Landfill in June 2001 were
also monitored for the presence of landfill gas on November 28, 2007. There were no detections.
of methane in either probe during this event. The landfill gas monitoring logs for each site are
attached. If we can provide any additional information please do not hesitate to call me or Van
Burbach at (336) 323-0092.
Sincerely,
JOYCE ENGINEERING, INC.
t ,
Daniel S. Girdner
Field Consultant
Attachment — Landfill Gas Monitoring Logs
C: Van Burbach, P.G. — Joyce Engineering, Inc.
P�18w*e CnnnlytC&O.iahh's River Wasle Maaageuwnl l$eiIllyV N dia mlaglolld7R00.728 - Qlrly UT MmJm ing PY-06-07M4y 2007 LFG.dx
Ef14G1 iEERX (r, INC LANDFILL GAS MONITORING LOG
General Weather Conditions: AJO3 T t �)UNAI Y -r l`A)
Atmospheric Temperature:66"F (AYM4 Sampling Personnel: Lqic - 61021yeK } Loe99-T j r6L7
Sampling Equipment Used: 6 00-TRIAL 6C,,�EAI�tfk AT67—Q AIK MoArITaK
Pwvoz- 1479 w1) Mm)oA4E7, 2
Sampling Methodology: t VKG : AND 5011, PR656-5,, W I6kr A (A MMI71- /A/—j
Sample
Location
Barometric
Pressure
(in Hg)
Time
Percent
°
Methane (/°)
Percent
Dioxide Carbon
(%)
Percent
Oxygen (%}
Percent
a
Balance Gas
(%)
Static
Pressure
(inches of
water
W -15
13
0
Cp -10
:.-.
13 , q6
0
0,00
13: �L
--
---.
--�--
t0a
13;5
13:53
- S S
_
ICI J zo
0
Gip- 3 v
o
-- ----
-µ- --
a� o�
qMP -t
0
- --- - A
-^-
of riCC
�Mv- 3 lesHop
Irk :16
13: q�,
0
�-
. --�
----
W-7
f3 ; 39
0
13,3q
d
---�- �- -
__--- -
--
Notes: 5.ILVCR ; 5HALLOW PR U66
Blvd ; fNTGY,rfi 006 Pr0$E.5
Page 1 of
ENGINEERING. INC.
raC1111y: v e + I V V "• r 1 1 Uate: r r r1
General Weather Conditions:
Atmospheric Temperature: Sampling Personnel:
Sampling Equipment Used:
Sampling Methodology:
Sample
Location
Barometric
Pressure
(in- Fig)
Time
Percent
Methane (%)
Percent
Carbon
°
Dioxide (/°)
Percent
Oxygen (%}
Percent
Balance Gas
°)
( /°
Static
Pressure
(inches of
water
01MP-1Z
q7
o—
�Mi'
13: 0
Notes:
Page �z of 7