Loading...
HomeMy WebLinkAbout14008_Hollar Hosiery Mill_SIR_2021.09 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 09/09/2021 11:04 AM I. Inspection Information Date & Time: 09/08/2021 1:55 PM Inspection Type: Drive-By Brownfields Staff: Kevin Slaughter Other Personnel: Location: Lat: 35.73522, Long: -81.32617, Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 2 of 7 II. Project Information Number: 14008-10-018 Name: Hollar Hosiery Mill Address: 883 Highland Avenue, Southeast City: Hickory County: Catawba III. Environmental Current Use of Property: Commercial/Retail Structures on Property: Existing Structures Violation: No Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Not Observed Exposed Soils Violation: No Summary: N/A Summary: N/A Summary: Former two-story brick textile mill renovated into retail and restaurant space. Summary: N/A Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 3 of 7 Use of Basements: Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Although there were no true basements, The ground floor of the western building is built partially below grade, with soil levels on outer walls rising to the northwest (Photo 3). In addition, there is a retail one-story building with a roof deck, and an adjacent two-story retail building, both with soil contact along rear walls (Photo 4). Summary: N/A Condition: Summary: N/A No exposure to to the public observed at the time of the Site Inspection. Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Photograph of property facing west along Highland Avenue SE. Building appears in good condition, including interior concrete floors that were accessible. Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 5 of 7 Photo 2: Western end of Hollar Hosiery Mill building. Photo 3: View looking generally west along northern side of building. Raise in grade can be seen along first floor side wall. Interior space not occupied in this portion of building during the site inspection and was not accessible. Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 6 of 7 Photo 4: Photo showing rear soil contact walls of Nutmeg Bakery and first floor of adjacent electrical room near junction of east and west buildings. Photo 5: Eastern end of Hollar Mill building. Drums on loading dock full of barley for brewery. Brownfields Inspection Report: Hollar Hosiery Mill, 14008-10-018 09/08/2021 1:55 PM Page 7 of 7 Photo 6: Photo of open-air space between eastern and western buildings. Photo 7: Concrete floors in accessible spaces were in good condition at the time of the site inspection.