Loading...
HomeMy WebLinkAbout07005_Bouligny_SIR_2021.08.03 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 08/09/2021 10:07 AM I. Inspection Information Date & Time: 08/03/2021 2:46 PM Inspection Type: Meeting Brownfields Staff: Other Personnel: Kevin Slaughter Neil McElveen - Terracon, & David Klepser - Ram Reality Location: Lat: 35.24053, Long: -80.81274, Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 2 of 7 II. Project Information Number: 07005-03-060 Name: Bouligny Site Address: 2320 N Davidson St City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Mixed Use Structures on Property: Existing Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Not Observed Exposed Soils Violation: No Summary: During March 24, 2021 Site Inspection, several deficiencies were identified. See Inspector Comments below. During the site visit, VIMS access panels, labeling, rooftop vents were inspected. Other than signage discussed below, no issues were identified with the VIMS at the time of the Site Inspection. Summary: N/A Summary: Summary: Apartment building (The Collective), exercise studio, and parking deck recently constructed. Also located on the parcel is a pre-existing retail structure containing a brewery, deli, nail bar and vacant rental space. Summary: N/A Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 3 of 7 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A Following the installation of the turbine siphon vents on the rooftop VIMS risers, and the extension of the VIMS riser that was sheltered from airflow by the elevator shaft and air conditioner condensers, the system should be operating as designed, with no exposure to public health identified during the site reinspection. Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: One of the two VIMS access panels not located during prior site inspection. The other access panel was located within a tenant caged storage unit. The purpose of the Site Inspection was to confirm that VIMS deficiencies identified during the March 24, 2021 Site Inspection had been properly addressed. Per the previous Site Inspection: During the inspection, the following were not complete, missing, or not located: proper placarding, two VIMS riser access panels, and riser turbines and labeling. During the August 3, 2021 re-inspection, it was determined that all of the issues identified previously had been properly addressed with the exception of signage that should have been installed within electrical/mechanical rooms as called for in the approved VIMS Plan. This signage would identify the presence of the VIMS and warn against installing floor penetrations without taking the proper precautions. These placards were not installed prior to the follow-up Inspection; however, it was agreed during the inspection that if these signs were installed relatively quickly, and photographs provided to DEQ, that it would be DEQ’s position that all the system requirements had been addressed. On August 10, 2021, the required signage was installed, and DEQ was notified the same day. This notification included photos of the placards installed, and a placard photo is included as Photo 6 within this Inspection Report, with Terracon’s notification and photos attached. Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 5 of 7 Photo 2: Signage installed within access panels following prior site inspection. Photo 3: Siphon Vent style turbine fans installed on all three VIMS risers in addition to proper labeling. Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 6 of 7 Photo 4: VIMS riser adjacent to elevator shaft during prior Site Inspection. Photo 5: The same VIMS riser following extension of riser, installation of siphon vent, and labeling. Brownfields Inspection Report: Bouligny Site, 07005-03-060 08/03/2021 2:46 PM Page 7 of 7 Photo 6: Photograph of placard (one of three) placed within electrical/mechanical room on first floor of building. These placards were installed on August 10, 2021 following the August 3, 2021 Site Inspection.