Loading...
HomeMy WebLinkAbout1109_INSP_20211203Oep.Mn.nf of Envlrammenf.l 0u.1� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer Compost X SLAS COUNTY: BUNCOMBE MSWLF PERMIT NO.: 1109-COMPOST Closed HHW White Incin T&P X FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P/ Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: 12/3/2021 FACILITY NAME AND ADDRESS: Hensons' Inc. — Asheville Wood Yard 116 Pond Road Asheville, NC 28806 Date of Last Inspection: 8/28/2019 GPS COORDINATES (decimal degrees): Lat.: 35.544341' Long.: - 82.606301' FACILITY CONTACT NAME, PHONE NUMBER & EMAIL: Name: Randy Flynn, Engineering/IT Operations Manager Telephone: 828-859-5836 Email address: hensons&hensonsinc.net FACILITY CONTACT ADDRESS: Hensons' Inc. P.O. Box 1060 Tryon, NC 28782 PARTICIPANTS: Kris Riddle - Environmental Senior Specialist, Solid Waste Section (Section) Scott Nix - Operator, Hensons' Inc. STATUS OF PERMIT: The facility is currently operating under Permit No. 1109-COMPOST (DIN 25989) issued February 1, 2017. PURPOSE OF SITE VISIT: Partial Facility Inspection. STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: 1. 15A NCAC 13B .0203(d) states, "By receiving solid waste at a permitted facility, the permittee shall be considered by the Department to have accepted the conditions of the permit and shall comply with the conditions of the permit. " Permit No. 1109, Attachment 3 - Conditions of Operating Permit, Part 1, Number 1 states, "The Permit to Operate shall expire August 12, 2021. Pursuant to 15A NCAC 13B. 0201(g), no later than February 12, 2021, the permittee must submit a request to the Section for permit review and must update pertinent facility plans." Hensons' Inc. is in violation of 15A NCAC 13B .0203(d) in that the permittee did not submit a request to the Section for permit review by the required date. To achieve compliance, the permittee must submit a request to the Section for permit review within ten days of receipt of this inspection report. Page 1 of 2 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management NORTH CAROLINA Solid Waste Section On December 3, 2021, the facility submitted a permit renewal request (FID 1626413) to the Section for Permit No. I I09-COMPOST so this violation is considered RESOLVED. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. On -site December 3, 2021, to observe the facility's wood waste treatment and processing operations. Scott Nix, Operator - Hensons' Inc, was present during the inspection. 2. Regarding the facility's permit renewal request, if necessary, please contact Allen Gaither - Section Permitting Engineer, at alien. aig ther&ncdenr.gov, to discuss any potential modifications or updates to the facility's Operations Plan. 3. According to facility personnel, site access and operations were heavily impacted by Tropical Storm Fred in August 2021 and the site was closed to conduct debris clean-up and bridge maintenance efforts. In addition, sediment basins and berms had to be repaired and/or maintained at the facility due to the tropical storm. While on -site, it was observed the facility was preparing to re -install guardrails/safety cables on the bridge crossing over Hominy Creek. 4. During this inspection, site access was controlled, site signage was maintained, and site access roads were adequate to observe the facility. 5. As discussed during this inspection, continue to maintain access around all material piles at the facility for fire control in the event of an emergency. 6. No unpermitted waste was observed in the wood waste treatment and processing area during this inspection. A roll - off container is available at the facility to receive any unacceptable materials if necessary. 7. As discussed on -site, continue to maintain erosion control measures at the facility as necessary. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Kris Riddle Date: 2021.12.08 17:12:12-05'00' Phone: 828-296-4705 Kris Riddle, Environmental Senior Specialist Division of Waste Management, NC DEQ Regional Representative Sent to Randy Flynn, on X Email Hand delivery US Mail Certified No. f2 December 8, 2021, via: E-Copies: Deb Aja, Western District Supervisor - Solid Waste Section Chris Hollinger, Compliance Officer, Solid Waste Section Allen Gaither, Permitting Engineer - Solid Waste Section Page 2 of 2