HomeMy WebLinkAbout24003_North Davidson II_SIR_202106.24
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 06/24/2021 9:01 AM
I. Inspection Information
Date & Time: 06/24/2021 7:57 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Andrew Besu - H&H, Tim Kluttz - Liles
Construction.
Location:
Lat: 35.24056, Long: -80.81451,
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 2 of 7
II. Project Information
Number: 24003-20-060 Name: North Davidson II
Address: 2315 N. Davidson
St.; 421 E. 26th St.
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Commercial/Retail
Structures on Property: Existing Structures Violation: No
Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Not Observed Exposed Soils Violation: No
Summary: Although a VIMS is planned for the building; construction had not started at
the time the Site Inspection was performed.
Summary: N/A
Summary: Single story brick/ building. Although initially industrial, most recently the
building was used as performance theater/playhouse.
Summary: N/A
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 3 of 7
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
Site perimeter fenced with chain-link temporary construction fencing. No risk of public
exposure at the time of the Site Inspection.
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 4 of 7
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: Photo of building and N. Davidson St. facing west.
Several restaurants and a brewery are planned for the building. As a result of TCE being
detected below the central portion of the building, an active VIMS was approved by DEQ
for the building. Work had not started on the proposed VIMS when the Site Inspection
was performed.
Due to asbestos removal being performed by RCI Demolition in the front office portions
of the building, no attempt was made to access the front offices during the Site
Inspection.
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 5 of 7
Photo 2: Rear of building facing southeast.
Photo 3: Northeast corner of building during utility trenching.
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 6 of 7
Photo 4: Northwest corner of building.
Photo 5: View looking east from northwestern portion of building.
Brownfields Inspection Report: North Davidson II, 24003-20-060
06/24/2021 7:57 AM
Page 7 of 7
Photo 6: Offices in southeastern portion of building closed off with clear plastic sheeting during
asbestos removal by RCI Demolition.