HomeMy WebLinkAbout1101_Buncombe_CDLF_WellConversionReport_FID1625806_20211202REPORT OF PIEZOMETER TO
GROUNDWATER MONITORING
WELL CONVERSION:
B-620 TO MW-18
BUNCOMBE COUNTY LANDFILL
ALEXANDER, NORTH CAROLINA
Facility Permit Number 1107-CDLF-1998
Prepared For:
Buncombe County
81 Panther Branch Road
Alexander, NC 28701
BLE Project Number J21-9378-26C
November 8, 2021
BLE North Carolina Business Licenses C-284 & C-1538
JJ I= IM ®LJNNELL
M LAMMONS
ENGINEERING
6004 Ponders Court I Greenville, 5C 29615
t, 864.288.1265 A. 864,286.43,90 w info@blecorp.[om
RLECORP.COM
� CANNONS
ENGINEERING
November 8, 2021
Solid Waste Section
Division of Waste Management
NCDEQ — ARO
2090 U.S. 70 Highway
Swannanoa, NC 28778
Attention: Ms. Jaclynne Drummond,
Hydrogeologist
Subject: Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18
Buncombe County Landfill
Alexander, North Carolina
Permit Number I I07-CDLF-1998
BLE Project Number J21-9378-26C
Dear Ms. Drummond:
Bunnell-Lammons Engineering, Inc. (BLE) is pleased to submit this report on behalf of Buncombe County.
The purpose of the work was to convert an existing piezometer (B-620) to a groundwater monitoring well
(MW-18) in accordance with North Carolina Division of Waste Management (DWM) - Solid Waste Section
(SWS) approved plans. Included herein is a brief description of the background project information, the
scope of services performed, and a summary of the status of the groundwater compliance network.
Sincerely,
BUNNELL LAMMONs ENGINEERING INC.
W41
Riley lais Andrew W. Alex der, P.G., RSM
Staff Hydrogeologist Consultant Hydrogeologist
Registered, NC #1475
cc: Ms. Kristy Smith, Solid Waste Engineering Manager — Buncombe County
Mr. Dane Pederson, Solid Waste Director— Buncombe County
6004 Ponders Court, Greenville, SC 29615 (,864.288.1265 a 864.288.4430 Wg info@hleMrp.com
BLECORP.COM
1s 1m 1i
Buncombe County Landfill —Alexander, North Carolina November 8, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
TABLE OF CONTENTS
1.0 PROJECT INFORMATION........................................................................................................1
2.0 SCOPE OF SERVICES PERFORMED......................................................................................1
3.0 SUMMARY.................................................................................................................................... 2
4.0 QUALIFICATIONS OF REPORT.............................................................................................. 2
5.0 CLOSING.......................................................................................................................................2
Tables
Table 1 Well Construction and Monitoring Well Data
Table 2 SWS Approved Sampling Matrix
Figures
Figure 1 Site Location Map
Figure 2 Monitoring Well Location Plan
Appendices
Appendix A Boring Logs (B-620 and MW-18)
Appendix B Well Completion Photographs
Appendix C Well Development Log
iofi
1s 1m 1i
Buncombe County Landfill -Alexander, North Carolina November 8, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
1.0 PROJECT INFORMATION
The subject 654-acre landfill site is located in Buncombe County, North Carolina, approximately nine miles
north of the city of Asheville with a physical address of 81 Panther Branch Road in Alexander, North Carolina
(Figure 1). Buncombe County owns and operates a Subtitle D MSWLF which includes Cell 1 through Cell
6 and a CDLF consisting of Phase 1 through Phase 6. Currently Cell 6 of the MSWLF and Phase 6 of the
CDLF are the active waste units. MSWLF Cell 7 has been permitted for construction and MSWLF Cells 8
through 10 are planned (but not permitted) for future expansion (Figure 2).
A Water Quality Monitoring Plan (WQMP) was finalized by BLE and submitted to the North Carolina Solid
Waste Section (SWS). The WQMP was approved on April 16, 2021 (FID 1576846). The facility requires
semi-annual groundwater, surface water, and leachate monitoring and reporting in accordance with the
WQMP.
The existing groundwater monitoring network for the Buncombe County Landfill consists of two (2)
upgradient (background) wells (MW-1 and MW-1D) and twenty-five (25) downgradient (compliance) wells
(MW-2, MW-2D, MW-3R, MW-4, MW-4D, MW-5, MW-5D, MW-6, MW-7, MW-8, MW-8D, MW-10,
MW-10D, MW-11, MW-11D, MW-12, MW-12D, MW-13, MW-13D, MW-14, MW-14D, MW-15, MW-
15D, MW-17R, and MW-17DR). Wells MW-17 and MW-17D were abandoned September 14, 2020 and
replaced by MW-17R and MW-17DR respectively.
In July 2021, Buncombe County initiated a voluntary assessment of the compliance issues related to the
detected concentrations of vinyl chloride in MW-15 and MW-15D (October 2020) and 1,2-dichloroethane
and vinyl chloride in MW-15D (April 2021). Buncombe County requested that BLE and Pace provide support
for the assessment activities. It was observed that the MW-15/MW-15D well pair was installed in very close
proximity to the waste limits, not installed at a location typical of a compliance boundary, and therefore did
not provide representative samples. We presumed that any impacts to groundwater and compliance issues (as
a result thereof) were an artifact of the close proximity of the well pair to the waste.
BLE submitted a report titled Report of Groundwater Compliance Assessment and Plan to Replace MW-
151MW-15D Well Pair dated July 28, 2021 (FID 1595066) to the SWS. The reported requested that
piezometer B-620 be converted to groundwater monitoring well designated MW-18 and that the new well
replace the MW-15/MW-15D well pair as a compliance point for the CDLF. The SWS approved the request
on August 3, 2021 (FID 1595460). This report documents the conversion of B-620 to MW-18.
PXI=.YK1]9we] DR] 11:Ai/[yxyiIH;70117:7U1I4E
Buncombe County located an existing piezometer designated B-620 which is present about 200 feet down
slope from the subject MW-15/ MW-15D well pair (Figure 2). Piezometer B-620 was installed in 2008 as
part of a design hydrogeologic investigation for the CDLF waste unit and was documented in a report by
CDM. The boring log for B-620 is included in Appendix A.
Piezometer B-620 was installed in bedrock and the wellhead was accessible and in good condition. Existing
surface completion included a 4" x 4" x 5' protective steel cover and 2' x 2' concrete pad. BLE made the
following modifications to the piezometer for compliance with monitoring well standards in the WQMP:
added a vent hole in the PVC casing near the top of the well, added a weep hole near the base of the outer
protective steel cover, added pea gravel inside of the outer protective steel cover, added a survey pin in the
concrete pad, and added an identification placard affixed to the protective steel cover with its new
1 of 2
1s 1m 1i
Buncombe County Landfill —Alexander, North Carolina November 8, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
corresponding well number (MW-18). Additionally, approximately 4 inches of PVC stick-up were
removed to allow the protective steel casing to properly close. Photographic documentation of the
conversion is included in Appendix B.
The location and elevation for MW-18 were surveyed on September 24, 2021 by a North Carolina registered
land surveyor (Ed Holmes & Associates Land Surveyors) retained by Buncombe County. A signed and sealed
certification for the survey was not provided by the surveyor and therefore not included herein.
Well completion information published by CDM and survey data from Ed Holmes & Associates was used to
populate Table 1 and to prepare a new boring log for MW-18 (Appendix A). The SWS approved sampling
matrix is included for reference (Table 2).
Development of groundwater monitoring wells is required in the WQMP. BLE performed development of
MW-18 by surging and pumping to remove the fine particles from the sand pack around the well screen. The
monitoring well was developed until pH and specific conductivity reached equilibrium. Turbidity values
decreased from greater than 2000 NTU to 20.7 NTU after development. A development log is included in
Appendix C.
3.0 SUMMARY
One piezometer (B-620) was converted to a groundwater monitoring well (MW-18) as approved by the SWS.
The piezometer has been converted and developed in accordance with the WQMP. Groundwater monitoring
well MW-18 has replaced the MW-151 MW-15D well pair as a compliance point for the CDLF as shown on
Table 2 and Figure 2.
4.0 QUALIFICATIONS OF REPORT
The activities and evaluative approaches used in this scope of work are consistent with those normally
employed in hydrogeological and environmental assessments of this type. Our evaluation of site conditions
has been based on our understanding of the site and project information and the data provided to BLE.
This report has been prepared on behalf of and exclusively for the use of Buncombe County, North Carolina.
This report and the findings contained herein shall not, in whole or in part, be used or relied upon by any other
party (excluding the SWS) without BLE's prior written consent.
5.0 CLOSING
We appreciate the opportunity to work with Buncombe County on this project. Please contact us at (864) 288-
1265 if you have any questions or comments.
2 of 2
TABLES
Table 1
Well Construction and Monitoring Well Data
Buncombe County Landfill
Alexander, North Carolina
Permit No.1107-CDLF-1998
Permit No. 1107-MSWLF-1996
BLE Project Number J21-9378-26C
Monitoring Point
MSW or
C&D
Latitude
Longitude
Northing'
Easting'
TOC
Elevation (ft)'
Ground Surface
Elevation (ft)'
Depth to GW (ft)
April 23, 2021
Groundwater
Elevation (ft)
Well Depth
(ft)'
Screen Depth
(below GS)'
Waste Unit
Monitored
Installation
Date'
Geology Monitored'
Well
Status/Purpose
Well
Diameter (in)'
MW-1
Facility
33.570245
-85.567196
737,383.3
923,481.5
2021.22
2019.28
63.49
1957.73
76
61.0 - 76.0
Facility
1990's
Saprolite/PWR
Background
2.0
MW-lD
Facility
33.570242
-85.567236
737,371.0
923,468.7
2021.57
2019.97
65.04
1956.53
200
85.0 - 95.0
Facility
1990's
Bedrock
Background
2.0
MW-2
MSW
33.570284
-85.566586
739,569.6
921,033.3
1920.86
1918.54
7.80
1913.06
20
5.0 - 20.0
Cell
1990's
Saprolite/PWR
Compliance
2.0
MW-2D
MSW
33.570283
-85.566599
739,565.7
921,027.7
1920.51
1918.63
8.40
1912.11
55
45.0 - 55.0
Cell
1990's
Bedrock
Compliance
2.0
MW-3R
MSW
33.570271
-85.566817
739,499.1
920,384.3
1973.18
1975.67
51.81
1921.37
55
45.0 - 55.0
Cell
7/28/2014
PWR
Compliance
2.0
MW-4
MSW
33.570228
-85.567590
739,263.0
920,192.1
1944.35
1942.48
12.17
1932.18
25
9.0 - 24.0
Cell
1011011996
Saprolite/PWR
Compliance
2.0
MW-4D
MSW
33.570228
-85.567597
739,261.0
920,177.3
1944.64
1942.79
12.49
1932.15
55
45.0 - 55.0
Cell
1011111996
Bedrock
Compliance
2.0
MW-5
MSW
33.570201
-85.568087
739,111.5
920,246.7
1977.12
1975.39
33.42
1943.70
50
35.0 - 50.0
Cell
101911996
Saprolite/PWR
Compliance
2.0
MW-5D
MSW
33.570199
-85.568112
739,103.6
920,242.3
1976.92
1975.31
35.06
1941.86
81
71.0 - 81.0
Cell
1011011996
Bedrock
Compliance
2.0
MW-6
MSW
33.570317
-85.565937
738,767.9
920,223.6
1987.34
1985.39
24.38
1962.96
50
35.0 - 50.0
Cell
101811996
Saprolite/PWR
Compliance
2.0
MW-7
MSW
33.570230
-85.567514
738,286.3
920,586.8
2022.83
2020.72
41.00
1981.83
61
42.0 - 61.0
Cell
101411996
Saprolite/PWR
Compliance
2.0
MW-8
MSW
33.570196
-85.568117
738,102.0
920,801.7
1962.06
1959.85
28.00
1934.06
70
55.0 - 70.0
Cell
1990's
Saprolite/PWR
Compliance
2.0
MW-8D
MSW
33.570199
-85.568069
738,116.7
920,812.0
1962.47
1960.57
27.00
1935.47
95
85.0 - 95.0
Cell
1990's
Bedrock
Compliance
2.0
MW-10
MSW
33.570239
-85.567391
739,324.0
921,597.0
2010.54
2007.50
67.42
1943.12
73
58.0 - 73.0
Cell
3/6/2002
Saprolite/PWR
Compliance
2.0
MW-10D
MSW
33.570239
-85.567391
739,324.0
921,590.8
2010.56
2007.50
67.16
1943.40
117
102.0 - 117.0
Cell
3/6/2002
Bedrock
Compliance
2.0
MW-11
MSW
33.570208
-85.567897
738,169.2
921,422.1
1966.71
1963.70
30.57
1936.14
50
35.0 - 50.0
Cell
3/6/2002
Bedrock
Compliance
2.0
MW-11D
MSW
33.570206
-85.567947
738,154.0
921,406.0
1966.15
1963.20
31.87
1934.28
70
60.0 - 70.0
Cells
3/6/2002
Bedrock
Compliance
2.0
MW-12
C&D
33.570306
-85.566147
738,703.7
919,192.4
1947.39
1944.70
10.31
1937.08
17
7.0 - 17.0
Phases 1 - 5
6/25/2002
Saprolite/PWR/Bedrock
Compliance
2.0
MW-12D
C&D
33.570269
-85.566849
739,489.5
921,966.6
1947.10
1944.30
9.64
1937.46
37
27.0 - 37.0
Phases 1 - 5
6/25/2002
Bedrock
Compliance
2.0
MW-13
MSW
33.570269
-85.566849
739,489.5
921,966.6
1953.92
1951.30
2.81
1951.11
16
6.0 - 16.0
Cell
612412005
Bedrock
Compliance
2.0
MW-13D
MSW
33.570316
-85.565957
738,761.6
919,055.7
1953.82
1951.40
5.82
1948.00
44
39.0 - 44.0
Cell
6/23/2005
Bedrock
Compliance
2.0
MW-14
C&D
33.570320
-85.565889
738,782.5
919,037.1
1952.77
1949.80
28.25
1924.52
49
39.0 - 49.0
Phases 1 - 5
4/5/2006
Bedrock
Compliance
2.0
MW-14D
C&D
33.570306
-85.566147
738,703.7
919,192.4
1953.76
1950.70
28.70
1925.06
88
78.0 - 88.0
Phases 1 - 5
4/6/2006
Bedrock
Compliance
2.0
MW-15
C&D
33.570207
-85.567982
739,143.4
919,829.3
1973.29
1970.21
22.40
1950.89
26
16.0 - 26.0
Phases 1 - 5
6/7/2012
Saprolite/PWR
WL
2.0
MW-15D
C&D
33.570207
-85.567982
739,143.4
919,829.3
1973.51
1970.25
24.98
1948.53
43
33.0 - 43.0
Phases 1 - 5
6/7/2012
Bedrock
WL
2.0
MW-17
Abandoned - September 14, 2020
MW-17D
Abandoned - September 14, 2020
MW-17R
C&D
33.570283
-85.566553
738,579.7
918,662.0
1891.61
1888.96
15.02
1876.59
23.5
8.5 - 23.5
Phase 6
9/3/2020
Bedrock
Compliance
2.0
MW-17DR
C&D
33.570281
-85.566586
738,569.7
918,659.3
1891.70
1889.14
13.72
1877.98
39
34.0 - 39.0
Phase 6
9/2/2020
Bedrock
Compliance
2.0
MW-18
C&D
33.570214
-85.567851
739,183.2
919,705.2
1940.67
1937.97
NA
NA
51.5
41.5 - 51.5
Phases 1 - 5
6/11/2008
Bedrock
Compliance
2.0
- Data from Table 3, Well Construction, New Buncombe County Landfill, Buncombe County, North Carolina, provided by SCS Engineers.
2 - Based on visual observation of Sheet No 1 Groundwater and Methane Monitoring Well Locations by CDM Smith dated August 2014.
Some well installation dates appear inconsistent with water level records and may not be accurate. Changes to some dates (italics) made based on water level records and dates from SHR and DHR documents by CDM.
The top of casing and ground surface elevations for MW-3R are a probable error (reversed) based on April 2016 water levels in the SCS Engineers report.
The top of casing and ground surface elevations for MW-14 and MW-14D do not match those in the SHR and DHR documents by CDM.
The well construction and survey data for MW-17R and MW-17DR are from a report by SCS dated October 13, 2020
Location accuracy of the monitoing wells is limited by the references themselves
The well construction data for MW-18 from the DHR table and boring log by CDM. Surveying was performed by Ed Holmes and Associates of Asheville, NC in September 2021.
TOC - Top of Casing.
GS - Ground Surface.
All depth measurments in feet -- All elevations in feet above an arbitrary site datum.
Table 1.xlsx Prepared by: RLB
T1 (10-20-21) MW Points Checked by: IAI
Table 2
SWS Approved Sampling Matrix
Buncombe County Landfill
Alexander, North Carolina
Permit No. 1107-CDLF-1998
Permit No. 1107-MSWLF-1996
BLE Project Number J21-9378-26C
April
October
Station ID
*Analytical Suite*
1,4-Dioxane
*Analytical Suite*
1,4-Dioxane
b
a
e y
MW-1
A-1 Plus
A-1 Plus
eu
MW-1D
A-1 Plus
A-1 Plus
MW-2
A-1
A-1
MW-21)
A-1
A-1
MW-311
A-1
A-1
MW-4
A-1
yes
A-1
yes
MW-41)
A-1
yes
A-1
yes
MW-5
A-1
A-1
MW-51)
A-1
A-1
MW-6
A-1
A-1
MW-7
A-1
A-1
MW-8
A-1
A-1
MW-81)
A-1
A-1
MW-10
A-1
yes
A-1
yes
MW-lOD
A-1
yes
A-1
yes
MW-11
A-1
A-1
`°
MW-11D
A-1
A-1
3
MW-12
A-1 Plus
yes
A-1 Plus
yes
10
MW-12D
A-1 Plus
yes
A-1 Plus
yes
MW-13
A-1
A-1
MW-13D
A-1
A-1
MW-14
A-1 Plus
A-1 Plus
MW-14D
A-1 Plus
A-1 Plus
MW-15
W
W
MW-15D
W
W
MW-16
A-1
yes
A-1
yes
MW-16D
A-1
yes
A-1
yes
MW-17
Abandoned September 14, 2020
MW-17D
Abandoned September 14, 2020
MW-17R
A-1 Plus
yes
A-1 Plus
yes
MW-17DR
A-1 Plus
yes
A-1 Plus
yes
MW-18
A-1 Plus
yes
A-1 Plus
yes
SW-1
A-1
yes
A-1
yes
SW-2
A-1
yes
A-1
yes
SW-3
A-1
yes
A-1
yes
d
SW-4
A-1
yes
A-1
yes
0
SW-5
A-1T
yes
A-1T
yes
SW-6
A-1T
yes
A -IT
yes
SW-7
A-1
yes
A-1
yes
SW-8
A-1T
yes
A-1T
yes
LD-1
A-1
A -I
LD-2
A-1
A-1
0
d
LD-3
A-1
A-1
A
R
LD-4
A-1
A-1
d
LD-5
A-1
A-1
yes
C
LD-6
A-1
A-1
u
LD-7
A-1
A-1
Leachate LD
A-1
A-1
Leachate Pond
I LMP
LMP
Notes:
A-1 = Appendix I VOCs & Metals
A -IT = Appendix I VOCs plus Tetrahydrofuran & Metals
A-1 Plus = Appendix I VOCs plus Tetrahydrofuran,
& Metals plus Mercury, Manganese, Iron, Sulfate, Chloride,
Alkalinity, & Total Dissolved Solids
LMP (Leachate Monitoring Parameters) = Appendix I VOCs & Metals, pH,
specific conductance, BOD, COD, Nitrates, Sulfates, & Phosphates.
W = Water Level Only
LD = Leak Detector
Do Not Exist - Permitted for Future MSWLF Cell 7
1,4-Dioxane removed for these points
Table revised July 16, 2019 (SW-8 and 1,4-doxane)
Table revised February 27, 2020 (BLE Project No. 9378-20 for Spring 2020)
Table revised June 19, 2020 (Change 1,4-Dioxane Matrix)
Table revised October 14, 2020 (Abandon MW-17/MW-17D)
Table revised July 20, 2021 (Remove MW-15/MW-15D & add MW-18)
Prepared by: AWA
Checked by: TJD
\\blegvlfs I \SolidWasteProj ects\Buncombe County Active LF, NC\9378-26C FY22 Consulting\O1 B-620 to MW-18 Conversion\04 Report\Table 2 - Revised Sampling Matrix.xlsx
FIGURES
70 /(
0
T
vy.
1750
Z
\<aa
ti
z--
141
D
O
J
01
D a 1
gg '9A
ti
,s�J
"
0
R
�
251
y
p,
, RD
zoG
o
Al
°
Alexander
2000 1000 0 2000 4000
APPROXIMATE SCALE IN FEET
DRAWN: DATE:
KLW 10-28-21 IM I BUNNELL
� LAMMONS
CHECKED: RLB I CAD: BCLF26C-SLM ENGINEERING
6004 Ponders Court, Greenville, SC 29615
APPROVED: AWA JOB NO: J21-9378-26C Phone: (864) 288-1265 Fax: (864] 288-4430
REFERENCE:
USGS TOPOGRAPHIC MAP, 7.5 MINUTE SERIES,
LEICESTER AND WEAVERVILLE, N.C. QUADRANGLES,
PHOTOREMSED 2017 AND PHOTOREMSED 2017.
SITE LOCATION MAP I
BUNCOMBE COUNTY LANDFILL
ALEXANDER, NORTH CAROLINA
FIGURE
4/ 1
/ 1
CONVENIENCE
CENTER 1
LANDFILL OFFICE r
BUILDING �L
�� F PAL / SW-1
N _ _BLEVIN BR4NCN
- _ �,� .. - �. ♦ �J� i��0
FLOW)
W — — 0 —
-�S_-2 _ _ - - �j-..
�t - WELL
� , ' � ._ _ � �� M 4 HOUSE Mw-2 SW-7
SCALE HOUSE M-5�
/ oMW-3R MW-2D MW-13 BMW-13D NOT —16 %�MW-16D
PRESENT NOT PRESENT
� ► � �
� PANTHER BRANCH
(< —FLOW) �� 1 — MW-10D
M W —10 �� z000 �
---- w 4-----LD— ------ ----------------------
MW-4 x;nrxXUX xxxa L" _
Q� _------T----------- T—=�:��l T
�SW-8 ♦ MW-4D
�, � � �1MW-18 � ♦ \ 1 — I � �
nn_9 n MW-5D/ \ 1
1 �
I
I I �
I 1 �
f
MW-5 / \ INACTIVE 1 SW-3 INACTIVE I
j I \ CELL 3 \ CELL 4
INACTIVE
CELL 1 \ 1 1 PERMITTED
\� I
� � II � I \ 1 � /
' SW 5 LIDI1 1 \ 1 I FUTURE
r MW-14 I / O \ 1CELL 7
I `®MW 14 12 AREA OF MW-6 A �'` — — — — — —— � ACTIVE
�g MW
ASSESSMENT i � �� �` CELL 6
MW-17R I C,, MW-12D
0 / BUNCOMBE COUNTY , /
MW-17DR I EMERGENCY SERVICES \` ,� INACTIVE I'
RADIO TOWER \ CELL 2 INACTIVE
�� ♦ ,� CELL 5
®MW 17D EXISTING ` 1- MW 7 .------------\ - /i ,
MW-17 LD �,0� _ / / ♦ - - - - - WASTE UNIT BOUNDARY
r � � � PHASE 1-5 I \ �� _ 0 LEACHATE
C&D AREA r �� M 2 / ,�
%�� \ �� // / FACILITY BOUNDARY
BMW-8 1 ♦ /
� J � � � MW-11D I �
PERMITTED MW-11 �e I FUTURE / \ // / MW-10 EXISTING GROUNDWATER
PHASE6 MW-8D 1 CELL 10 / / MONITORING WELL
C&D AREA / • I
EMPLOYEE BUILDING I // I �MW-16 PERMITMONITOTED FUTING URE GROUNDWATER
�EACHATE TRAILER / I
/ GARAGE POND o I FUTURE FUTURE
(MAINTENANCE BUILDING) CELL 9 I CELL 8 ` j SW-2 EXISTING SURFACE WATER
I H H W i // I \ , MONITORING LOCATION
BUILDING / I
4.
LD-1 LEAK DETECTOR
1000, / �' * LD-7 PERMITTED FUTURE LEAK DETECTOR
SW-4
- _ — — — — — — — — — — — — — — — v MW-1 OM-3 EXISTING LANDFILL GAS MONITORING WELL
� MW-1D
+M-5 PERMITTED FUTURE LANDFILL GAS MONITORING WE
1
M-9 EXISTING STRUCTURE MONITORED FOR m
1 LANDFILL GAS
1 REFERENCES:
1 1) SHEET NO. 1 GROUNDWATER AND METHANE MONITORING WELL * DEEP WELL NOT USED FOR CONTOURING
1
LOCATIONS, CDM SMITH, PROJECT NO. 6447-105257. FILE: SITEMAP PURPOSES
2014.DWG. (AB) ABANDONED
M-8 2) SURFACE WATER LOCATIONS FROM SHEET NO. 1 GROUNDWATER
1 AND METHANE MONITORING WELL LOCATION MAP, CDM SMITH,
NOVEMBER 2012 PROJECT NO. 6447-93318. FILE: SITEMAP. DWG.
1 3) PHASE 6 C&D BOUNDARY PROVIDED BY MCGILL.
4) SHEET NO. OP-1 EXISTING CONDITIONS, CDM SMITH, PROJECT NO.
1 6447-97693. FILE: OP-1.DWG.
1 5) FIGURE NO. 3-1 WATER QUALITY MONITORING PLAN CELL 6 AREA,
CDM, PROJECT NO. 6447, DATED NOVEMBER 2004.
1 6) SURVEY DATA FOR MW-17R, MW-17DR AND M-12R IN SCS
REPORT DATED OCTOBER 13, 2020
7) SURVEYING FOR MW-18 PERFORMED
L„ ownIromm", BY ED HOLMES AND ASSOCIATES DATED
SEPTEMBER 24, 2021 NOTES: zoo Ioo o zoo aoo
F'
Try LOCATION ACCURACY APPROXIMATE SCALE IN FEET
oo
OF THE FEATURES
■■ ,-,�� FRENCH BROAD RIVER �n ' SHOWN IS LIMITED BY
�oNCAgp '
C�
_'?°°°�"sF "'�"�- THE REFERENCES
�r s 5 THEMSELVES.
LOGO
LEGEND
—1980 TOPOGRAPHIC CONTOUR
REVISIONS
No. DESCRIPTION BY
DRAWN: RLB
CHECKED: IN
APPROVED: AWA
DATE: 10-25-21
CAD FILE:
BCLF 9378-26CMWLP
JOB NO: J21-9378-26C
is 1IM I LAMM
BUNNELL
ELL
EINIS
ENGINEERING
6004 Ponders Court, Greenville, SC 29615
Phone; (864) 288-1265 Fax; (864) 288-4430
MONITORING WELL LOCATION PLAN
BUNCOMBE COUNTY LANDFILL
ALEXANDER, NORTH CAROLINA
FIGURE NO.
2
APPENDIX A
BORING LOGS
B-620 - CDM LOG
MW-18 - BLE LOG
CAMP DRESSER & McKEE
Sheet 1 of 2
BORING LOG&
CAM
MONITORING WELL DETAIL
620
Client: Buncombe County Project Name: C&D Landfill Expansion
Project Location: Buncombe County Landfill, Asheville, NC Project Number: 6447-65973
Drilling Contractor: A&E Drilling Surface Elevation (ft.): 1937.9
Drilling Method/Rig: HSA 8.5" ODICME 750x(Schram T450 Total Depth (ft.): 51.5
Drillers: Lee Brown/Billy Nash Depth to Initial Water Level (ft. BGS): 48
Drilling Date: Start: 6/3/2008 End: 6/11/2008 Development Method:
Borehole Coordinates: Field Screening Instrument:
N E Logged By: D. Caldwell
Development Date: Start End Top of Riser Elevation (ft.):
E Q
Sample
m
P E
c
a Z_
`�
Material
a.
o
Elev.
Well Construction
Deplh
H
Number
s `aa
a
c
5 co
ca
$
�'
ffi
Description
T
Q -J
{ft
Detail
Protective Casing
11937.91
Ground Surface
SM
Moist, very loose to loose, brown, fine to
=
0
Type II Portland
SS
S-1
2
24l12
coarse SAND, some silt.
Cement
3
Auger refusal at 3.5 feet below ground
surface. Continued into bedrock with Air
Rotary to first water bearing fracture.
1932.9
5
1927.9
10
1922.9
15
1917.9
EXPLANATION OF ABBREVIATIONS
REMARKS
DRILLING METHODS: SAMPLING TYPES;
HSA - Hallow Stem Auger AS - Auger/Grab Sample
SSA - Solid Stem Auger CS - (`BUDmla Sampler
HA - hand Auger BX - 1,5" Rock Core
AR - Air Rotary NX 2.1" Rack Core
DTR - Dual Tube Rotary GP - Geoprobe
FR Foam Rotary HP - Hydro Punch
MR - M"" Rotarryy SS - Split Spoon
RC - ReaeraeCiraulatlon ST Shelby Tube
CT - Cable Tool WS - wash Sample
JET - Jetting OTHER:
D - driving AGS - Above Ground
DTC - Drill Through Casing surface
Reviewed by: Date:
CAMP DRESSER & McKEE
Sheet 2 of 2
BORING LOG&
CAM
MONITORING WELL DETAIL
620
Client: Buncombe County Project Name: C&D Landfill Expansion
Project Location: Buncombe County Landfill, Asheville, NC Project Number: 6447-65973
Q c
Sample
c
�
a E
N °e
c
Q- Z'
= c
Material
n
n a,
Elev.
Well Construction
Depth
Number
c Q
3 c
mm
,
vi�
rn0
Description
m-J
C7
(ft.)
Detail
ane
m
1917.9
2C
1912.9
25
1907.9
30
1902.9
35
189&9
Bentonite Chips �90
1897.9
4U
1896.9
#2 Filter Sand 41.0
2" PVC, Schedule '.
40, 10-slot
1892.9
45
t 887.9
50
�' 1896,8
$86%.4
51.5
1682.9
55
1677.9
It
'
IMMINC.
MONITORING WELL NO. MW-18
PROJECT: Buncombe County Landfill PROJECT NO.: J21-9378-26C
BUNNELL-LAMMONS
CLIENT: Buncombe County START: 6-3-2008 ENDS-11-2008
ENGINEERING, INC.
LOCATION: Alexander, North Carolina ELEVATION: 1937.9
DRILLER: Lee Brown and Billy Nash, A&E Drilling LOGGED BY: D. Caldwell
GEOTECHNICAL AND EN VIRONMENTAL
CONSULTANTS
DRILLING METHOD: Hollow stem auger 8.5" OD/CME 750x/Schram T450
DEPTH TO - WATER> INITIAL: 48 AFTER 24 HOURS:1 CAVING>777
N
W
ELEVATION/
DESCRIPTION
SOIL
a STANDARD PENETRATION RESULTS
MONITOR WELL INSTALLATION
DEPTH (FT)
TYPE
BLOWS/FOOT
DETAILS
a
[71
2 5 10 20 30 40 50 70 90
Very loose to loose, brown, moist
2
SURFACE COMPLETION
"
fine to coarse SAND with some
2
f
x 4" stand-up lock n steel
silt
3
protective cover with'a 2' x 2'
.�.
.,....
=
a e base
concrete pa d t the b with
1935
surveyn
i
pin
. ...........
-m andvent holes
weep
Auger refusal at 3.5 feet below
ground surface. Continued into
installed in steel cove r and well
5
bedrock with Air Rotary to first
........................................:
casing, respectively
water bearing fracture......
............................. ........
Pea gravel installed in protective
cover annulus at well head
1930
_ -
.... ...... .......:
Top of PVC casing elev. = 1940.67
Boring log information and
feet
monitoring well detail from CDM
. . ... ... ... ... ...
Ground surface elev.=1937.97 feet
10
log B-620. The piezometer was
......... . . . . . . . . . .
_
Stick elev. = 2.7 feet
up
converted to groundwater
monitoring well MW-18 on
.................................................
Northing = 739,183.2 feet
September 14, 2021 by BILE.
....:...:....:........................................
E t 919,705.2f t
as ing = feet
1925
15
......................................................
1920
20
....:....:...:. .
Cement, 0 t0
Type II Portland C 39 0
...:..........................................
feet
1915
25
......... ............................. ........
1910
30
.... :... :.... :.............................. ..........
1905
35
....................................................
1900
MONITORING WELL NO. MW-18
Sheet 1 of 2
MONITORING WELL NO. MW-18
It Im IMMINC.
BUNNELL-LAMMONS
ENGINEERING, INC.
GEOTECHNICAL AND EN VIRONMENTAL
CONSULTANTS
PROJECT: Buncombe County Landfill PROJECT NO.: J21-9378-26C
CLIENT: Buncombe County START: 6-3-2008 ENDS-11-2008
LOCATION: Alexander, North Carolina ELEVATION: 1937.9
DRILLER: Lee Brown and Billy Nash, A&E Drilling LOGGED BY: D. Caldwell
DRILLING METHOD: Hollow stem auger 8.5" OD/CME 750x/Schram T450
DEPTH TO - WATER> INITIAL: a 48 AFTER 24 HOURS:1 CAVING>=
ELEVATIONI
DESCRIPTION
SOIL
a
STANDARD PENETRATION RESULTS
MONITOR WELL INSTALLATION
DEPTH (FT)
TYPE
a
BLOWS/FOOT
DETAILS
2 5 10 20 30 40 50 70 90
Bentonite seal, 39.0 to 41.0 feet
...........................
......................................................
Filter pack, sand 41.0 to 51.5 feet
1895
45
.....................................................
........................................:
2-inch diameter, 0.010-inch slotted
.............................................
Schedule 40screen, 4
PVC well 1.3
.......................................................
.• .
to 51.3 feet
1890
50
...................................................
......... ............................. .........
.• .
Pipe cap
Total well depth, 51.5 feet
1885
55
......................................................
1880
60
....................................................
1875
65
... :....:......................................
1870
70
......................................................
1865
V
V
J
1
9
p 7186L0
n
J
J
'
MONITORING WELL NO. MW-18
Sheet 2 of 2
APPENDIX B
WELL COMPLETION PHOTOGRAPHS
IC1.1:
Buncombe County Landfill —Alexander, North Carolina November S, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
MW-18
MW-18: Well completion.
1s 1M 1i
Buncombe County Landfill —Alexander, North Carolina November S, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
MW-18: Survey Pin and weep hole.
1s 1M 1i
Buncombe County Landfill —Alexander, North Carolina November S, 2021
Report of Piezometer to Groundwater Monitoring Well Conversion: B-620 to MW-18 BLE Project No. J21-9378-26C
MW-18: Pea gravel, well cap, and vent hole.
APPENDIX C
WELL DEVELOPMENT LOG
MONITORING WELL DEVELOPMENT LOG
DATE 9/14/2021 TOTAL WELL DEPTH (TWD); TOP OF CASING = 54.25 1/100 ft
PERSONNEL Ivan A. Irizarry DEPTH TO GROUND WATER (DGW) = 44.90 1/100 ft
SITE Buncombe County Landfill LENGTH OF WATER COLUMN (LWC) = TWD - DGW = 9.35 1/100 ft
JOB # J21-9378-26C 1 CASING VOLUME (CV) = LWC x 0.17 = 1.6 gallons
WELL ID MW-18 NUMBER CV REMOVED = 11 CV
TOTAL VOLUME OF WATER REMOVED = 17 gallons
METHOD OF WELL DEVELOPMENT = Pump and Bailer
WELL YIELD = Low
TIME
ELAPSED
DEV. TIME (hrs)
VOLUME PURGED
event (gallons) total (gallons)
SURGE
WATER
TEMP (C)
pH
(units)
SPECIF. COND.
(µmho/cm)
TURBIDITY
(NTU)
COLOR
(subjective)
PURGING
METHOD
9/14/2021 10:00
0
0
0
Surged at 0 gallons
14.8
7.00
381.00
338
Sli. Gray
Pump
9/14/2021 10:30
0:30
6.0
6.0
Surged at 6 gallons
15.7
7.58
231.40
>2000
Gray
Pump
9/14/2021 11:00
1:00
1.5
7.5
Surged at 7.5 gallons
14.9
7.37
225.60
356
Cloudy
Bailer
9/14/2021 11:30
1:30
2.0
9.5
Surged at 9.5 gallons
15.0
7.41
230.30
198
Cloudy
Bailer
9/14/2021 12:00
2:00
2.5
12.0
15.5
7.27
230.00
136.0
Sli. Cloudy
Bailer
9/14/2021 12:30
2:30
1.0
13.0
Surged at 13.0 gallons
15.0
7.36
225.50
98.4
Cloudy
Bailer
9/14/202113:00
3:00
1.0
14.0
15.3
7.37
225.30
75.2
Clear
Bailer
9/14/2021 13:30
3:30
2.0
16.0
Surged at 16.0 gallons
15.5
7.35
225.60
26.9
Clear
Bailer
9/14/202114:00
4:00
1.0
17.0
15.5
7.36
225.50
20.7
Clear
Bailer
Notes:
After initial 6 gallons purged the well was allowed to recover for approximately 20 minutes as it went dry.
MW-18 Bunnell-Lammons Engineering, Inc.
9378-26C MW-18 Well Dev Log Greenville, SC