HomeMy WebLinkAbout4404_ROSCANS_1986A.C. DEPARTMENT OF HUMAN RESOURL _
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
PERMIT NUMBf R
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
(a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
- (a) Solid waste shal I be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
(b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
—(a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
(b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
(a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
(b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
(d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE:
NAME
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
(a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
(c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
(e) Barrels and dru ms shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
-- (a) A site shall only accept those solid wastes which it is permitted to
receive.
(b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
(c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
(d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1,1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. O. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
(a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
(b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
&C. DEPARTMENT OF HUMAN RESOUR'L_i
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES PERMIT NUMBER
INSPECTION FOR SANITARY LANDFILLS
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
(b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
(a) Solid waste shall be restricted into the smallest area feasible.
(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
(a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
—(c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
(a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site ":,
(b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
(b) Surface water shall not be impounded over or in waste.
(c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
(a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
(b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
(a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
(d) Dust control measures shall be implemented where necessary.
REMARKS
DATE
NAME: _
M
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
(a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
(c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
(e) Barrels and d ru ms shall not be disposed of un less they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
(b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1,1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. O. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be coi-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
N.C. DEPARTMENT OF HUMAN RESOURCL a
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
PERMIT NUMMA
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
(b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
(a) Solid waste shall be restricted into the smallest area feasible.
(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
(a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
(b) Areas which will not have additional wastes placed on them for
12 monthsor more shall be covered with a minimum of one foot
of intermediate cover.
(c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
(a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
(b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
(c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE
�IJuI�
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
(e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
(c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
(d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1,1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. O. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
—(a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
North Carolina Department of Human Resources
Western Regional Office • Black ]Mountain 28711
James G. Martin, Governor
Mr. W. G. Stamey, Town Manager
Town of Canton
P. O. Box 987
Canton, NC 28716
Dear Mr. Stamey:
Phillip J. Kirk, Jr., Secretar
October 30, 1986
I have made several attempts to reach you, both visits to your office and
phone calls, but have been unsuccessful. I will, therefore, convey to you in
this letter several areas needing correction at the Town of Canton landfill.
First of all, in considering the amount of cover material available at the
landfill site, it is the opinion of my Branch that the life expectancy of the
landfill is presently short-lived because there is not that much soil available
for intermediate (1' soil depth) and final (2' soil depth) cover. I would advise
you to evaluate the amount of cover material currently at this site before any
long-range plans concerning solid waste disposal for the Town of Canton are made.
Secondly, the following corrections are to be made at the Town of Canton land-
fill by March 15, 1987:
1. Restrict all demolition material to a small, confined area.
2. Place one foot of intermediate cover over the entire landfill surface (this
would include all areas below your current working face).
3. After the one foot of intermediate cover is added to these areas, seed the
areas with native grasses.
4. Develop an erosion control plan as specified by your landfill plans.
5. Cover solid waste with six inches of soil on a daily basis.
once again I might stress that the amount of cover material on your site
should be evaluated to determine the life expectancy of your landfill.
If you have questions or if I can be of assistance, let me know.
S'ncere1y,
James E. Patterson
Waste Management Specialist
JEP/dgh
cc: Julian Foscue
Gordon Layton
Dan McCracken