Loading...
HomeMy WebLinkAbout4404_ROSCANS_1975February Ili 1975 LYDA ASSOCIATES P. 0. Box 776 WEAVERVILLE, N. C. 2$787 Area Code (704) 645-7614 _.Raleigh, N.C. 27602 /CEIVED J .. FEU T ,,O O F UDUR S E D LI U Li-V L DATE January29 1975 JOB NO. 310 ATTENTION' RE:. Canton it r Landfill GENTLEMEN: WE ARE SENDING YOU X Attached ❑ Under separate cover via ❑ Shop drawings EX Prints ❑ Plans ❑ Samples ❑ Copy of letter ❑ Change order ❑ the following items: ❑ Specifications i COPIES DATE NO. DESCRIPTION 1Rey 1/22,/75 Canton Sanitary Landfj13. Plot Plan and Cross Sections I I THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted Xl For your use ❑ Approved as noted Xl As requested ❑ Returned for corrections ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 REMARKS ❑ Resubmit copies for approval ❑ Submit. copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US 'OPY TO SIGNED:e-tl,r� / If enclosures are not as noted, kindly notify us at once. j ?1j LYDA ASSOCIATES ENGINEERING •LAND PLANNING,; '°, :1 POST OFFICE BOX 776 • WEAVERVILLE, NORTH CAROLINA 28787 • (764);645-7614-;,.'-.4.f January 22, 1975 ROGER M. LYDA, N.S.P.E. Mr. Jerry C. Perkins, Assistant Head Solid Waste and Vector Control Branch Sanitary Engineering Section Department of Human Resources P.O. Box 2091 Raleigh, N.C. 27601 Dear Mr. Perkins: The enclosed plans for the Town of Canton landfill have been revised in response to your comments of August 8, 1974, as follows: 1. Dikes have been shown on cross -sections. The location on the plan is indicated by contours. 2. Earth for construction of dikes, the 0.5 foot of cover for each intermediate layer, and the 2 foot final cover will require approximately 140,000 cubic yards of earth. The topography and cross -sections have been extended to include the source of the material. .11 3. Individual lift heights and planned intermediate cover have been added to the cross -sections. 4. Additional berm swales have been added to the final surface to break up the long 4% grade. The spring box shown on the plan was constructed when the land- fill was opened several years ago and was covered with an esti- mated 50 feet of fill when our survey was made. There is no cleanout or inspection well extending -to the present surface. The exact location is unknown, and locating it with a pipe locator is not possible due to the great quantity of metals in the fill. If there are any questions, or comments which require additional revisions, please do not hesitate to call. Very truly yours, Roger M. Lyda, P.E. RML:ml