HomeMy WebLinkAbout10002_Rea Asphalt_SIR_2021.11.18
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 11/19/2021 10:02 AM
I. Inspection Information
Date & Time: 11/18/2021 1:04 PM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Mr. Shawn Church - Maintenance
Supervisor.
Location:
Lat: 35.2023245, Long: -80.8682632,
Brownfields Inspection Report: Rea Asphalt Plant, 10002-06-060
11/18/2021 1:04 PM
Page 2 of 6
II. Project Information
Number: 10002-06-060 Name: Rea Asphalt Plant
Address: 2701 Youngblood St
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: Existing Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Not Observed Exposed Soils Violation: No
Summary: There are four active roof mounted VIMS fans on Building #5. This is the only
building within the apartment complex where a vapor mitigation system was required.
The roof fans are the only visible portion of the VIMS, and all four were in operation on
arrival (Photos 3 and 4).
Summary: N/A
Summary: High-density four and five story apartment buildings.
Summary: N/A
Brownfields Inspection Report: Rea Asphalt Plant, 10002-06-060
11/18/2021 1:04 PM
Page 3 of 6
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition: Unknown
Summary: Monitoring wells are still sampled periodically according to the Maintenance
Manager. Monitoring well vaults appeared in good condition (Photo 5).
No exposure to the public observed at the time of the site inspection
Brownfields Inspection Report: Rea Asphalt Plant, 10002-06-060
11/18/2021 1:04 PM
Page 4 of 6
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: Entrance to leasing office.
Site inspection was performed to check condition and operation of active VIMS installed
in 2012. All four active VIMS fans were operating at the time of the Site Inspection. Mr
Church indicated the fans are checked twice a month, and there has never been an issue
with any of the four VIMS fans on Building #5.
Brownfields Inspection Report: Rea Asphalt Plant, 10002-06-060
11/18/2021 1:04 PM
Page 5 of 6
Photo 2: Photograph of Building 5. This is the only building where a VIMS was installed.
Photo 3: Typical rooftop VIMS fan.
Brownfields Inspection Report: Rea Asphalt Plant, 10002-06-060
11/18/2021 1:04 PM
Page 6 of 6
Photo 4: Photograph showing three of the four active fans.
Photo 5: Two of the four monitoring wells observed on the northeastern side of Building #5.