Loading...
HomeMy WebLinkAbout5802_ROSCANS_1994NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of SoLid waste Narug®ant Solid waste Section SOLID WASTE MANAGEMENT FACILITY EVALUATION REPORT Type of Facility 5AnA�b`) Permit f ii County Iyl/?d1j") 11 II Name of Foci Lityt Y)AkA ph Lf, 114 (��i/ Location Date of Last Evaluation - e _ � :� 1. Permit Conditions Followed Yes No N/A A. Specific Condition(s) 11. OperationnaL Requirements Followed Yes No 15A N.C. Admin. Code 13B Section �> A. Specific Violation(s) by amber and letter. 111. Other Violation of RuLe or Law IV. Evaluator-s Comments �`G�-iY Fn A\ ho� pG�n( 11�C � f i;Jl1�(` �/� GUI Y't. 1)1 y04 cdl.. �.'OS/vrC )tot 5S1 `/Yli.d-tP, }�r.t�ra 6YA�.rneSr rQ 0 )J jY.fk " V. Continuation Page Required? _Yes _-' No Receiving Signature Evaluation Date I') 7 f/Solid waste Sectivn�' DEHNR 3793 (Part I White: Facility Part 11 Canary: Central Office Part III Pink: Regi onnaL Office) Solid waste Section (Review 7/94) NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of Solid Waste Management Solid Haste Section SOLID WASTE MANAGEPENT FACILITY EVALUATION REPORT Type of Facility mill hlyT Zli-,}i/i/J// Peneit lCounty 4/7150h/ Name of Faci Lity ,ZVA"1151M) Date of Last Evaluation 9, Permit Conditions Followed —4Yes No N/A A. Specific Condition(s) II. OperationaL Requirements Followed Yes No 15A N.C. Ad•in. Code 138 Section A. Specific VioLation(s) by number and Letter. III. Other Violations of RuLe or Law IV. Evatuator-s Cm.ents h�'d/' N1, dl) 5/-10 7)11 �bd h/ s/h/C.12d ! /"1) y . 1�{'X P(l///�� //7/7 %rlJ✓ IrJ VY15S °�C-rlhn its jz� 1�0 P„1e V. Continuation Page Required! Yes __LNo Receiving Sigatu6 i Evaluation Date (! " I I Solid Haste Section DEHNR 3793 (Part I White: Facility Part II Canary: central office Part III Pint: Regional Office) Solid Haste Section (Review 7/94) NC DEPARTMENT OF E_ , IRONMENT, HEALTH AND NATU. L RESOURCES Division of Solid haste Management Solid Waste Section SOLID WASTE NmNAGEENT FACILITY EVALWATION REPORT Type of Facility.aAf1ndbrif �-7'{J Penn/County.I/ -:County.�)15pr t Nave of Facility f�/ ` /i QA 6nlfA�i;i/l./lf� ,.: t Date of Last Evaluation /'+ / { I_ Penmiit Conditions Followed Yes _Z__No N/A A. specific Conditions) Violated IT. Operational Requi rents Followed Yes _ L No 15A N.C. Adr.in. Code 13D Section I v.SC> 5 A. Specific VioLations) by number and Letter. III. Other Violations of Rule or Law IV. Evaluator's V. Continuation Page Requir ed? Yes _�LNo Receiving Signature Evaluation Date (� �f. (.% - �� Solid Waste Section DEHNR 3793 (Part 1 White: Facility Part 11 Canary: Central Office Part III Pink: Regional Office) Solid Waste Section (Review 7/94) - y'L LANDFILL CLOSURE MADISON COUNTY LANDFILL LANDFILL NO. 58-02 LONG BRANCH ROAD MADISON COUNTY NORTH CAROLINA JENSEN ENGINEERING 54 1/2 Broadway, Suite 200 Asheville, N.C. 28801 PROJECT NO. 93131 I. INTRODUCTION To pursue the permanent closure of the current Category 1 and 2 Municipal Solid Waste Landfills (MSWLF) under the current closure regulations by the State of North Carolina Department of Environment, Health and Natural Resources, Division of Solid Waste Management Rules 15A NCAC 13B as amended through January 4, 1994, and the federal criteria as published in part 40 CFR Part 258 and revisions to 40 CFR 257 under authority of Subtitle D of the Resource Conservation and Recovery Act, the following information is provided for approval. Madison County operated a MSWLF on a 33.1 acre tract of land located on Long Branch Road (see location map). The current landfill consists of one Category 1 & two Category 2 (the landfilling of municipal solid waste ceased prior to October 9, 1993), discrete landfill areas as delineated on the attached plans. II. LANDFILL CLOSURE A. CATEGORY I MSWLF The Category I MSWLF landfill stopped accepting waste prior to 1989. 1. Final contours are in conformance to those presented in the original landfill plan. 2. Final cover is complete at this time. 3. Permanent erosion control measures have been implemented as shown on the attached plan which includes existing ditches and silt basins. 4. Drainage Control will be accomplished with the use of diversion berms and controlled cross slope of the landfill surface. 5. Vegetative cover was provided upon completion of all cover. operations. The seeding, fertilizing and mulching was in accordance with the vegetative cover specifications on the plans which included native grasses as included in the original operational plan. Page 2 II. A. cont'd 6. Leachate control will be provided if conditions warrant for containment on site and properly disposed of, but at present there is no evidence that there is a leachate problem. 7. Written notification and certification of the facility compliance with the closure conditions will be provided by the owner/operator and his N.C. Registered Professional Engineer. 8. An inspection by the NCDEHNR Division Representative concerning compliance with the closure conditions will be requested as soon as practicable. B. CATEGORY II MSWLF 1. Final contours for this portion of the. landfill have essentially reached the proposed final contours of the original plan. 2. Final cover and cap system have been provided to have an 18 inch low -permeability layer of soil with a permeability of no greater than 1 x 10 - 5 which was available near the site in quantities sufficient to cover both category II MSWLF. A minimum of (6) six inches of soil was placed above the low permeability cap system to encourage growth of native planting and provide for erosion protection and to protect root penetration into the cap system. 3. Permanent erosion control measures have been implemented as shown on the attached plan which includes riprap ditch lines and drainage directed to the existing silt basins. 4. Drainage Control is being accomplished with the use of diversion berms and controlled cross slope of the landfill surface. 5. Vegetative cover was provided upon completion of all cover operations. The seeding, fertilizing and mulching was in accordance with the vegetative cover specifications on the plans which included native grasses as included in the original operational plan. Page 3 II. B cont'd 6. Leachate control will be provided if conditions warrant for containment on site and properly disposed of, but at present there is no evidence that there is a leachate problem. 7. Written notification and certification of the facility compliance with the closure conditions will be provided by the owner/operator and his N.C. Registered Professional Engineer. 8. An inspection by the NCDEHNR Division Representative concerning compliance with the closure conditions will be reguested as soon as practicable. III. POST -CLOSURE CONDITIONS Post closure care will consist of maintaining all erosion control/ storm drainage measures and vegetative cover in compliance with the closure conditions as approved. A comprehensive water quality monitoring program will be continued during the post closure time period as required by the Division in accordance with the:N.C. Water Quality Monitoring Guidance Document for Solid Waste Facilities. During the period of post -closure care attention will be given to the potential for concentrations of explosive gases and if conditions warrant measures will be designed to mitigate any adverse effects. Access to the closed MSWLF is controlled by the gate structure at the access road preventing unauthorized access by the public. The final grading of the site is designed to prevent ponding and any excessive settlement which appears to provide a potential ponding situation will be dealt with as part of the post closure care of the MSWLF. During Post -closure care the Owner/operator will comply fully with current ground water standards. Page 4 IV. POST -CLOSURE OPERATIONS No post -closure operations are planned for this site. V. ADDIT_IONAL._INFORMATION A. Soils reports from LAW ENGINEERING TESTING COMPANY concerning the density and permeability of the available soils that were used for final cover. The soil testing shows a permeability of 4.0 x 10 - 7. B. Bid Specifications for hauling and placement of clayey soil for final cover. C. Location map. Al SUMMARY OF LABORATORY TESTING Madison County Landfill LAW Job No. 243-04683-02 CONSTANT HEAD PERMEABILITY TEST ASTM D 5084 1. Date of Test: August 30-September 4, 1993 II. Test Locations: Boring No. 1 III. Material Description: IV. Material Condition: Bulk Sample - Remolded V. Proctor Data: Maximum Dry Density (pcf): 80.0 Optimum Moisture Content (%): 38.0 VI. Test Data: Dry Density (pcf): 76.0 Initial Moisture Content (%): 38.9 Final Moisture Content (%): 45.8 Sample Length (cm): 5.11 Sample Area (cmZ): 42.08 Head (cm): 140.68 Quantity of Water Passing Through Sample (cm'): 128.9 Elapsed Time (sec): 261,540 Temperature ('F): 73 Viscosity Correction Factor: 0.931 Coefficient of Permeability -k (cm/sec): 4.0 x 10' VII. Comments: Consolidated and tested at 2 psi head difference. PROCTOR TEST REPORT 95 90 85 u 0 T N V) 80 N a T L ZAV for 75 Sp.G.= 2.90 70 32.5 35 37.5 40 42.5 45 47.5 Water content, % "Standard" Proctor, ASTM O 698. Method A Elev/ Depth Classification Net. Moist, Sp.G. LL PI % > NO. 4 % < No. 200 USCS AASHTO TEST RESULTS MATERIAL DESCRIPTION Optimum moisture = 38.0 % Maximum dry density = 60.0 pcf RED BROWN FINE TO MEDIUM SANDY CLAYEY SILT Project No.: 226-09998-01-LAW/ASHEVILLE #243-04683-02 Project: MADISON COUNTY LANDFILL Location: Date: 8-27-i993 Client: Proposed Use: Remarks: Curve No. i PROCTOR TEST REPOnT LAW ENGINEERING, INC. MADISON COUNTY Bid Specifications Hauling and Placement of Clayey Soil Madison County will be accepting sealed bids for the hauling and the placement of sufficient clay soil for a two foot, compacted, cover required for the closure of the existing Madison County landfill located on Long Branch Road. Sealed bids must arrive at the Madison County.'Finance Office, Box 579, Marshall, North Carolina 28753, by 12:00 Noon , September 13, 1993. Bids will be opened at the Board of Commissioners meeting on Monday, September 13, at (1) one P.M. The County of Madison reserves the right to reject any and all bids. A visit to the landfill site by all bidders will be necessary. For more information please contact Jim Brown, Director. of the Madison County Solid Waste Dept. (704)649-2311 The work includes the clearing of the trees, stumps and debris from the borrow area approximately one and one half miles away. The cleared debris is to be windrowed around the parameters of the borrow site for erosion control measures. The clayey soil shall be loaded and trucked to the existing landfill and dumped in a manner that it can be spread and compacted in three eight inch lifts by the Solid Waste Department personnel. The clayey soil is to meet certain permeable standards regulated by the N.C. Solid Waste Division. Madison County will provide an on site inspector to monitor the soil at the borrow area and the soil placement at the landfill. Madison County will have the sedimentation control plan approved, and will assist in .its installation. The contractor shall provide the maintenance to the sedimentation control measures during the work project. Madison County persnnnel will. grade and re -seed the borrow area after completion of the project. The bidder or contractor shall abide by all local and 'state laws, ie insurance, liconses, etc. The project is to be completed within fifty calendar days from the day Madison County notifies the successful bidder to commence. Rain days will be documented and used if ncedpd. Nnrac of Company Crnl.nct Person Address Tni,•tl I.Ilinp Sulu 13id Madison County assumes no liability resulting from any damages caused by contractors negligence. 5 e unl. ,oR IIF. � w] •,,' v Illz 1>n `.. „ ]; ,�• r.. ... 1'ir'. \_ '"'WILDLIFE' ¢. ..kiY{`$. L ,l' L�»E W] .. J "''v; s4 } l\ ♦ ittl Lill S JT srmacs i,L u'6 t'=y%M: w ': L D T . 7 W r:. • E. Grep..:rA as FRENGN E Lu 3 Y 1� MAX woe �Qv Q l]Ef _A�l a 9jb� BROAD i L•3•� E ..� tT!] ii . i C yule 1211. :... sc•- cm t uu r :fa r � 4 ✓i81uiM _ ::n P .Prx J G. a 7 y9`l • � �._ IVOADISON COUNTY -=_ G' " u O NORTH CAROLINA f� PREPARED BY THE \ �•�, J NORTH CAROLINA DEPARTMENT OF TRANSPORTATION U N DIVISION OF HIGHWAYS —PLANNING AND RESEARCH BRANCH R C E IN COOPERATION WITH THE E: T. O M g U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION ' SCALE 1 I 1 Lo c-AT 1 O I\J M A P NC DEPARTMENT OF E. .IRONMENT, HEALTH AND NATU2. . RESOURCES Division of Solid Haste Nmtgarent Solid Haste Section SOLID WASTE MANAGEMENT FACILITY EVALUATION REPORT Type of Facility Sign IhitN I -Z nd FW Permit r - 021 colnty. AAnflis,-w Nam of Facitity. M h (D`b old wl.�]. N L?l3r)I'LL(. Location _21%L� Rdj Lljh- )1)?jI Date of Last Evaluation % Igo IS q, I. Permit Conditions Followed : / No N/A A. Specific Cordition(s) II. Operational Requirements Followed Yes No 15A N.C. Admin. code 13B Section = 0.505 L01 1FAAF10A 0i-7 , 05J01(46suR ,) , /12 M)C l) 00050310 A. Specific Violation(s) by nLmber and Letter. CLAY Gap ftQ el?solvN % -ce�14zti Sevcrz� hlobl �+5� Pq III. Other Violations of Rule or IV. Evaluator's V. Continuation Page Required? _yes /j No Receiving Signature Evaluation Date /b ^/,Z^ / 7 `� Solid Waste ion�/. (,�?Zlf/�'`ylyj��)(,/ DEHNR 3793 (Part I White: Facility Part II Canary: Cenfiral Office Part III Pink: Regional Office) Solid Haste Section (Review 7/%) G AMR HEMMO Civil Engineering • Site Development 541h Broadway, Suite 200 Asheville, NC 28801 CcOctober 20, 1994Ms. Jan McHargue North Carolina Department of Environment, Health and Natural Resources8025 North Point Boulevard, Suite 100 Winston-Salem, N.C. 27106-3203 RE: Madison County Landfill Project Number: 93131 Dear Jan i This is our official certification that the cap system for Madison County Landfill No. 58-02 for both the Category 1 and 2 MSWLF has been completed in accordance with the Solid Waste Permit, the conditions of Permit and Rule .0510 for the Category 1 and 2 MSWLF's and additional Rule .1627 for the Category 2 MSWLF. This final cap system was in place with the additional six inch earth cover for plant growth on the Category 2 MSWLF all erosion control measures and primary seeding prior to October 9, 1994. Enclosed are the certified soils reports concerning the low permeability 18 inch cap system showing a permeability of less than 1 x 10 - 5 CM/SEC as required. Please note that on tests 1 and 2 the testing was performed near the ground surface but was retested in tests 1A and 2A at a depth of 6 inches below the surface. Please note our change of address: Phone: Fax: Sincerely, °,annee,rrbge Jensen Engin ering,v`�°pFt�H....... I it 6"0 W. ens n F ENCL. W. ,nrnun. XC: Jim Brown W/Encl. Jim Patterson W/Encl. JENSEN ENGINEERING 54 1/2 Broadway, Suite 200 Asheville, N.C. 28801 (704) - 252 - 0537 (704) - 252 - 4428 Registered P.E. In: Alabama, Florida, Georgia, North Carolina, South Carolina & Tennessee Phone (704) 252-0537 FAX (704) 252-4428 LAW ENGINEERING, INC. 1308-C PATTON AVENUE ASHEVILLE, NORTH CAROLINA 28806 (704) 252-8130 TO: Madison County Solid Waste Department 23 Long Branch Road Marshall, North Carolina 28753 ATTN: Mr. Jim Brown DATE: October 18, 1994 JOB NUMBER: 2430468302 JOB NAME: MADISON "]OUNTY LANDFILL CLOSURE --------------------------- ATTACHED IS THE FOLLOWING: NO. OF CORRESPONDENCE, DRAWING COPIES OR ITEM ------------------------------------------------------------- 1 Summary of Laboratory Testing - Samples 1, 2 and 1 Summary of Laboratory Testing - Samples lA and 2A 1 Drawing entitled Landfill Closure Plan ------------------------------------------------------------ CC: Madison County Solid Waste Department/Mr. Jim Brown Jensen Engineering/Mr. George Jensen ---------------- ---------------- DESCRIPTION ---------------- MICHAE Z. SA6EDY SUMMARY OF LABORATORY TESTING Madison County Landfill Closure Law Engineering Asheville Project 243-04638-02 Law Engineering Project 226-09998-07 CONSTANT HEAD PERMEABILITY TEST Sample Moisture Dry Density Coefficient of Head ID Content (%) (pcf) Permeability (cm) (cm/sec) 1 31.1 72.5 3.5 x 10'S 140.68 2 28.8 85.4 4.2 x 10'6 140.68 3 29.7 81.7 2.1 x 10.6 140.68 All samples tested at 2 psi head difference SUMMARY OF LABORATORY TESTING Madison County Landfill Closure Law Engineering Asheville Project 243-04638-02 Law Engineering Project 226-09998-07 CONSTANT HEAD PERMEABILITY TEST Sample Dry Density Moisture Coefficient of Head H) (pcf) Content (%) Permeability (cm) (cm/sec) lA 87.0 29.7 4.2 x 108 140.68 F2A 77.7 29.7 9.4 x 10'6 140.68 All samples tested at 2 psi head difference and at 6 psi confining pressure. zk--r 6024eeG -r P6;?0l if SCALE 0 25 50 75 100 50'r.at to 0a 5, , NSN NO 000 MOTE ATIOX9 ARE OAEEO ON SEA 1 OAiYN NA" 21 fv ..2Z Da_'^tn�L,pB4 1,F AA v..vN �AxfeE LIP-ATIG I J A t 11 �Ai z x � i o N G LI N 6 w C0 O J U z J Q J J LL a 0 z a J SHEET