HomeMy WebLinkAbout4409T_ROSCANS_1992SPATE cy
V. tY �M Mom'
4@main
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Solid Waste Management
P.O. Box 27687 • Raleigh, North Carolina 27611-7687
s G. Martin, Governor
im W. Cobey, Jr., Secretary
October 5, 1992
Mr. Jack Horton -
Haywood County Courthouse Annex
420 North Main Street
Waynesville, North Carolina 28786
RE: Permit No. 44-08-TP, Permit To Construct, Haywood County Mixed Waste
Processing Facility
Dear Mr. Horton:
William L. Mc
Dire,
The Solid Waste Section hereby issues Haywood County a Permit To Construct (enclosed)
for the referenced facility in accordance with N.C.G.S. 130A-294 and 15A NCAC 13B.
Also, the North Carolina Department of Cultural Resources, Historic Preservation Section,
recommends that Haywood County conduct an archaeological survey of the site to determine
if any archaeological remains are present on the site. The Historic Preservation Section also
recommends evaluating what the effects, if any, construction of the referenced facility would
have on historic remains should they be found.
Prior to receiving waste at the facility, Haywood County must also obtain a Permit to
Operate from the Solid Waste Section. Key prerequisites for obtaining a Permit To Operate
include:
+ submitting to the Solid Waste Section copies of all applicable state and federal
permits and approvals;
• submitting to the Solid Waste Section "As -Built" engineering drawings for the
facility. Please show connection to the Town of Waynesville's sewer system;
• receive operational clearance after a representative of the Solid Waste Section
inspects the facility.
An EgLW Opportunity Aftinnadve Action Employer
Please review Construction Condition No. 3 which describes in detail all requirements
lecessary to obtain the Permit To Operate.
The Solid Waste Section applauds Haywood County's efforts to increase and improve its
recycling capabilities. Should you have any questions or if the Section may be of
assistance, please contact our office at (919) 733-0692.
Sincerely,
ae� cam�
Ellis Cayton, P.E.
Solid Waste Section
cc: Julian Foscue
Jun Patterson
`..
<y Wpm �Vr�
i4,ate�cns+
State of North Carolina
Department of Environment, Health, and Natural Resources
Division of Solid Waste Management
P.O. Box 27687 - Raleigh, North Carolina 27611-7687
,,-mes G. Martin, Governor
,!i..iam W. Cobey, Jr., Secretary
William L. Mi
Dire(
October 5, 1992
SOLID WASTE PERMIT
PERMIT NO. 44-08-TP
Haywood County
is hereby issued a permit to construct a
MIXED WASTE PROCESSING FACILITY
located
On Jones Cove Road (S.R. 1527), Clyde, Haywood County
North Carolina
in accordance with Article 9, Chapter 130A, of the General
Statutes of North Carolina and all rules promulgated thereunder
and subject to the conditions set forth in this permit.
es C. Coffey, Sup is r
ermitting Branch
Solid Waste Section
An Equal Opportunity Affirmative Action Employer
PERMIT No. 44-08-TP
OCTOBER 5, 1992
SOLID WASTE PERMIT
CONDITIONS OF PERMIT
1. The applicant is responsible for obtaining any and all permits and approvals necessary
for the development of this project prior to the commencement of construction
activities.
2. This permit will be subject to review every five years as per 15A NCAC 13B
0.0201(c), according to the issuance date of the Permit To Operate. Upcoming
amendments to the Solid Waste Management Rules may necessitate modifications of
the construction and/or operation of this facility prior to the review date.
3. This facility shall be constructed in accordance with the approved plans and all
pertinent rules and regulations. Modifications shall be approved by the Solid Waste
Section. The approved plan is described by Attachment 1, "List of Documents for
Approved Plan. "
4. Prior to receiving waste at this facility a Permit to Operate must be obtained. The
requirements for this part of the Solid Waste Permit are described below in
Construction Condition No. 3. The Conditions of Permit issued herein shall also be
incorporated in the Permit to Operate.
5. This permit is not transferable.
6. A copy of this permit and the approved plans shall be maintained at the facility.
CONSTRUCTION AND OPERATION PLANS
1. This permit is for construction of the mixed waste processing facility. Additional
conditions and revisions of the approved plans shall be approved by the North
Carolina Division of Solid Waste Management.
2. All sedimentation/erosion control activities will be conducted in accordance with the
Sedimentation Control Act codified at 15A NCAC 4.
Conditions of Permit No. 44-08-TP
Page 2
3. This following pre -operative requirements shall be met to obtain a permit to operate
this facility:
a. Site preparation shall be in accordance with the construction plan and the
conditions specified herein;
b. Site inspection shall be made by a representative of the DSWM;
C. The permit number and the words "NO HAZARDOUS, OR LIQUID WASTE
ACCEPTED" shall be posted on an entrance sign;
d. A plan for determining the amount of waste transferred to the Haywood
County landfill for disposal as required in the Monitoring and Reporting
Requirements Section shall be prepared and submitted to DSWM for approval.
e. The Section shall be provided with documentation showing approval for all
applicable local, state and federal permits. Copies of any applicable inspections
shall also be submitted to the Solid Waste Section prior to the issuance of the
Permit To Operate.
1. "As -Built" engineering drawings shall be submitted to the Solid Waste Section prior
to the issuance of the Permit To Operate.
5. This solid waste disposal facility is permitted to receive solid waste generated solely
within the boundaries of Haywood County except that hazardous waste and liquid
waste are prohibited from disposal at this site.
6. This facility shall conform to ' all operating procedures in Section 0.0300 of 15A
NCAC 13B and as specified herein.
a. All pertinent mixed waste processing facility personnel will receive training
and supervision necessary to properly operate this facility.
b. Waste water management will be conducted in accordance with the approved
plan, the conditions specified herein, and all pertinent State rules and
regulations.
Conditiogs of Permit No. 44-08-TP
Page 3
MONITORING AND REPORTING REQUIREMENTS
1. The permittee shall maintain a record of the amount of waste received at the facility
compiled on a monthly basis.
2. On or before December 1 of this year and each year thereafter, the permittee shall
report to the Solid Waste Section on forms prescribed by the Section the amount of
waste (in tons) received at this facility and transferred to Haywood County's landfill
for disposal. This report shall include the following information:
a. The reporting period shall be for the previous year, beginning 01 July and
ending 30 June;
b. The amount of waste received at the facility (in tons) compiled on a monthly
basis.
3. All records shall be maintained on -site and made available to DSWM upon request.