Loading...
HomeMy WebLinkAbout5603_ROSCANS_1989MONITORING WELL INSTALLATION RECORD JOB NAME COLLINS & AIKMAN JOB NUMBER 56-8609 WELL NUMBER mW_ 1 - GROUND SURFACE ELEVATION APPROX 562 FT LOCATION UPGRADIENT -- ABOUT 100 FT SOUTH OF S.R. 1240 INSTALLATION DATE 1-17-89 LOCKABLE COVER GROUND SURFACE BOREHOLE 2-INCH PVC PIPE— .6j-INCH STEEL CASING TO 68 FT GROUT BENTONITE SEAL 6-INCH BOREHOLE SAND BACKFILL PVC SCEEN END CAP CAP S'nCKUP 1. 5 FT 64 FT I DEPTH TO TOP OF SAND BACKFILL 66 FT INSTALLED BY CALDWELL WELL DRILLING, ASHEVILLE, NC GROUND -WATER LEVEL AT 56 FT ON 2-24-89 COLLINS & AIKMAN UW EUMMENtAL INt INA I MONITORING WELL INSTALLATION RECORD OLD FORT, NORTH CAROLINA 110 C"ARLOTTK, NORTH CAROL MlW_l I GROUND -WATER MONITORING WELL INSTALLATION RECORD JOB NAME COLLINS & AIKNIAN JOB NUMBER 56-8609 WELL NUMBER MW-2 - GROUND SURFACE ELEVATION APPROX 360 FT LOCATION DOWNGRADIENT -- DIKE AT SEDIMENT BASIN INSTALLATION DATE 1-17-89 GROU40 STEEL PIPE BORING (6"DIAJ GROUT BENTONITE SEAL 2" PVC PIPE SAND PVC SCREEN CAP NOTE: ALL PVC P I PE JOINTS HAVESCREW CONNECTORS COLLINS & AIKMAN OLD FORT, NORTH CAROLINA LOCKABLE CAP VENTED PVC CAP STICXUP 0. 7 FT DEPTH TO TOP OFSAND BACKFILL DEPTH TO 9 FT TOTAL DEPTH OF WELL 23.5 FT INSTALLED BY CALDWELL WELL DRILLING, ASHEVILLE, NC GROUND -WATER LEVEL AT 10.2 FT ON 1-23-89 MONITORING WELL UIWE"110111111101111.1m INSTALLATION RECORD CHARLOTTE NORTH cAoouNA I MW-2 MONITORING WELL INSTALLATION RECORD JOB NAME COLLINS & AIKMAN JOB NUM13ER 56-8609 WELL NUMBER MW-2A Nn -ra 641- PPROX 360 FT ep GROUND SURFACE ELEVATION A LOCATION DOWNGRADIENT -- APPROXIMATELY 10 FT EAST OF MW-2 INSTALLATION DATE 1-13-89 LOCKABLE COVER GROUND SURFACE BOREHOLE - 2-1NCH PVC PIPE - 6j-INCH STEEL CASI TO 23.6 FT GROUT � BENTONITE SEAL - BOREHOLE - SAND BACKFILL - PVC SCEEN END CAP — CAP 1.2 9. 5 FT I DEPTH TO TOP OF SAND SACKFILL 11.5 FT —F DEPTH OF PVC SCREEN 15.8 TO 25.8 FT TNSTALLED BY CALDWELL DRILLING, ASHEVILLE, NC TOTAL DEPTH OF WELL 27 FT COLLINS & AIKMAN LAW IIIIIIIIIIIIIIIENTAL Ix MONITORING WELL OLD FORT, NORTH CAROLINA 10 IN INSTALLATION RECORD I CHARLOTTE,NORTH CAROL A I MW-2A WEATHER CONDITIONS N.C. DEPARTMENT OF HUMAN RESOURCES DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS PERMIT NUMMR NAME OF SITE COUNTY LOCATION STGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS — (a) Construction plans shall be approved and followed. — (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS — (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shal I be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. — (b) Areas which wil I not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS — (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS — (a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. — (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. — (b) Solid waste shall not be disposed of in water. — (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. — (d) Dust control measures shall be implemented where necessary. REMARKS: V / � " � DATE: NAME: (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1, 1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division cif Health Services, P. 0. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided withi n the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. I Solid and Hazardous Waste Management Branch DHS 170 (Revised V115) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) N.C. DEPARTMENT OF HUMAN RESOURCES WEATHER CONDITIONS DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS PERMIT NUMBIE R NAME OF SITE COUNTY LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT I SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, If ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS — (a) Construction plans shall be approved and followed. — (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS — (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. — (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimu in of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS -a) Adequate erosion control measures shall be practiced to pre- vent slit from leaving the site. (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS — (a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. — (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessaryto stabilizethe site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. — (b) Solid waste shall not be disposed of in water. — (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shal I be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. — fell Dust control measures shall be implemented where necessary. REMARKS: DATE: NAME: (9) SIGN REQUIREMENTS — (a) Signs providing information on d u mping procedures, the hou rs during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro. mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within IIS days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shal I only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1, 1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. 0. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within thearea to conflnesolid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be coi- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch DHS 170 (Revised 4/85) solid Js Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yello%y — Facility green — Preparer) C.Collins & Aikman SCIENCE & SERVICE DIVISION August 22, 1989 Collins & AlkMan Corporation Science & Service Division 701 McCullough Drive P.O Box 32665 1 Charlotte, NC 28232 (704) 547-8500 Mr. Jim Coffey Solid & Hazardous Waste Management Division of Health Services P.O. Box 2091 Raleigh, NC 27602 Dear Mr. Coffey: Subject: Collins & Aikman Old Fort Landfill Attached are drawings which indicate our proposed minor expansion for the Old Fort carpet waste landfill. The minor expansion is required at this time because (1) we will be out of cover material in Area 2 in less than 18 months and (2) it will allow consolidation of filling on the site long term in Areas 1, 2, 3 & 4. Also, it will extend the buffer entirely around SR 1240. After you have had a chance to review the information, please contact me so we can set up a meeting to discuss the expansion. Sincerely, COLLINS & AIKMAN CORPORATION ZeS D. Moore III Utilities & Environmental Manager JDM/tg Attachment P. Niorris.- nal Forms' 49-13V '08 -1 S.43 ... .... Me,*- 15.51' 41.%W e4'W - 4e.5V 4Z- 'W_-w W470 —14-69kov-00-W- 40.f UtW.58'-WW-45 7 65GW e3-oa-w-w-4z� 1-?- -08*-00-1#) - 51-� VAX,-N%,Ols 18.300cres/ sa.-t gw 4, q la N OW-IT-567VI le: It zoo N WEATHER CONDITIONS N.C. DEPARTMENT OF HUMAN RESOURCES DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS PERMIT NUMBER NAME OF ITE COUNTY LO CATION RE OF PERSON(S) RECEIVING REPORT I SIP: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS — (a) Construction plans shall be approved and followed. _(b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS — (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. — (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or u pon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. (b) Adequate erosion control measures shall be practiced to pre vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS — (a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. — (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. — (b) Solid waste shall not be disposed of in water. — (c) Leachate shall be contained on Site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shal I be adequately secured by means of gates, chai ns, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attendant shall be on duty at the Site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. — (d) DuAt control rneasures shall be implemented where ne�cessyy. DATE: NAME: Solid and Hazardous (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hou rs du ring which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be Posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning Of Solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and dru ms shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A Site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, ani mal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1, 1985, may be disposed of separate and apart from other solid wastes at the bottom of the worki ng face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR61 maybe obtained and inspected at theSolid and Hazard- ous Waste Management Branch, Division of Health Services, P. 0. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within thearea to confinesolid waste subjectto beblown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the Uea by the owner or operator. DHS 170 Re�iscd 4/85) Solid & Hazardous Waste Management Branch (Review4/86) (white — Raleigh Office yellow — Facility green — Freparcur) N.C. DEPARTMENT OF HUMAN RESOURCES WEATHER CONDITIONS DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS PERMIT NUMBER NAME OF SITE COUNTY LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND,PERMIT REQUIREMENTS — (a) Construction plans shall be approved and followed. — (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS — (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. ' * — (b) Areas which�will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS — (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS _;L�(a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. — (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. — (b) Solid waste shall not be disposed of in water. — (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shall be adequately secu red by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attehdant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. — (d) Dust control measures shall be implemented where necessary. REMARKS: DATE: NAME: DHS 17H (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (9) SIGN REQUIREMENTS — (a) Signs providing information on du mping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and dru ms shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shall on ly accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1, 1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR61 may be obtained and inspected attheSolid and Hazard- ous Waste Management Branch, Division of Health Services, P. 0. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subjectto be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch (white — Raleigh Office yellow — Facility green — Preparer)