HomeMy WebLinkAbout5603_ROSCANS_1989MONITORING WELL INSTALLATION RECORD
JOB NAME COLLINS & AIKMAN JOB NUMBER 56-8609
WELL NUMBER mW_ 1 - GROUND SURFACE ELEVATION APPROX 562 FT
LOCATION UPGRADIENT -- ABOUT 100 FT SOUTH OF S.R. 1240
INSTALLATION DATE 1-17-89
LOCKABLE COVER
GROUND SURFACE
BOREHOLE
2-INCH PVC PIPE—
.6j-INCH STEEL
CASING TO 68 FT
GROUT
BENTONITE SEAL
6-INCH BOREHOLE
SAND BACKFILL
PVC SCEEN
END CAP
CAP
S'nCKUP 1. 5 FT
64 FT I
DEPTH TO TOP
OF SAND BACKFILL
66 FT
INSTALLED BY CALDWELL WELL DRILLING, ASHEVILLE, NC
GROUND -WATER LEVEL AT 56 FT ON 2-24-89
COLLINS & AIKMAN UW EUMMENtAL INt INA I MONITORING WELL
INSTALLATION RECORD
OLD FORT, NORTH CAROLINA 110 C"ARLOTTK, NORTH CAROL MlW_l
I
GROUND -WATER MONITORING WELL INSTALLATION RECORD
JOB NAME COLLINS & AIKNIAN JOB NUMBER 56-8609
WELL NUMBER MW-2 - GROUND SURFACE ELEVATION APPROX 360 FT
LOCATION DOWNGRADIENT -- DIKE AT SEDIMENT BASIN
INSTALLATION DATE 1-17-89
GROU40
STEEL PIPE
BORING
(6"DIAJ
GROUT
BENTONITE SEAL
2" PVC PIPE
SAND
PVC SCREEN
CAP
NOTE: ALL PVC P I PE JOINTS
HAVESCREW CONNECTORS
COLLINS & AIKMAN
OLD FORT, NORTH CAROLINA
LOCKABLE CAP
VENTED PVC CAP
STICXUP 0. 7 FT
DEPTH TO TOP
OFSAND BACKFILL
DEPTH TO 9 FT
TOTAL DEPTH
OF WELL
23.5 FT
INSTALLED BY CALDWELL WELL DRILLING, ASHEVILLE, NC
GROUND -WATER LEVEL AT 10.2 FT ON 1-23-89
MONITORING WELL
UIWE"110111111101111.1m INSTALLATION RECORD
CHARLOTTE NORTH cAoouNA I MW-2
MONITORING WELL INSTALLATION RECORD
JOB NAME COLLINS & AIKMAN JOB NUM13ER 56-8609
WELL NUMBER MW-2A Nn -ra 641- PPROX 360 FT
ep GROUND SURFACE ELEVATION A
LOCATION DOWNGRADIENT -- APPROXIMATELY 10 FT EAST OF MW-2
INSTALLATION DATE 1-13-89
LOCKABLE COVER
GROUND SURFACE
BOREHOLE -
2-1NCH PVC PIPE -
6j-INCH STEEL CASI
TO 23.6 FT
GROUT �
BENTONITE SEAL -
BOREHOLE -
SAND BACKFILL -
PVC SCEEN
END CAP —
CAP
1.2
9. 5 FT I
DEPTH TO TOP
OF SAND SACKFILL
11.5 FT
—F
DEPTH OF
PVC SCREEN
15.8 TO 25.8 FT
TNSTALLED BY CALDWELL DRILLING, ASHEVILLE, NC
TOTAL DEPTH
OF WELL
27 FT
COLLINS & AIKMAN LAW IIIIIIIIIIIIIIIENTAL Ix MONITORING WELL
OLD FORT, NORTH CAROLINA 10 IN INSTALLATION RECORD
I CHARLOTTE,NORTH CAROL A I MW-2A
WEATHER CONDITIONS
N.C. DEPARTMENT OF HUMAN RESOURCES
DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMMR
NAME OF SITE COUNTY
LOCATION STGNATURE OF PERSON(S) RECEIVING REPORT
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shal I be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which wil I not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
V / � " �
DATE: NAME:
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10)
SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division cif Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided withi n the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
I
Solid and Hazardous Waste Management Branch
DHS 170 (Revised V115)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBIE R
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
I
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, If ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimu in of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
-a) Adequate erosion control measures shall be practiced to pre-
vent slit from leaving the site.
(b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessaryto stabilizethe
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shal I be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— fell Dust control measures shall be implemented where necessary.
REMARKS:
DATE:
NAME:
(9) SIGN REQUIREMENTS
— (a) Signs providing information on d u mping procedures, the hou rs
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro.
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within IIS days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shal I only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within thearea to conflnesolid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be coi-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 170 (Revised 4/85)
solid Js Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yello%y — Facility green — Preparer)
C.Collins &
Aikman
SCIENCE & SERVICE DIVISION
August 22, 1989
Collins & AlkMan Corporation
Science & Service Division
701 McCullough Drive
P.O Box 32665 1
Charlotte, NC 28232
(704) 547-8500
Mr. Jim Coffey
Solid & Hazardous Waste Management
Division of Health Services
P.O. Box 2091
Raleigh, NC 27602
Dear Mr. Coffey:
Subject: Collins & Aikman Old Fort Landfill
Attached are drawings which indicate our proposed minor
expansion for the Old Fort carpet waste landfill. The minor
expansion is required at this time because (1) we will be out of
cover material in Area 2 in less than 18 months and (2) it will
allow consolidation of filling on the site long term in Areas 1,
2, 3 & 4. Also, it will extend the buffer entirely around SR
1240.
After you have had a chance to review the information, please
contact me so we can set up a meeting to discuss the expansion.
Sincerely,
COLLINS & AIKMAN CORPORATION
ZeS D. Moore III
Utilities & Environmental Manager
JDM/tg
Attachment
P.
Niorris.-
nal Forms'
49-13V
'08
-1 S.43 ... ....
Me,*- 15.51'
41.%W
e4'W - 4e.5V
4Z- 'W_-w
W470
—14-69kov-00-W- 40.f
UtW.58'-WW-45
7
65GW
e3-oa-w-w-4z�
1-?- -08*-00-1#) - 51-�
VAX,-N%,Ols 18.300cres/ sa.-t
gw 4,
q la
N OW-IT-567VI le:
It
zoo
N
WEATHER CONDITIONS
N.C. DEPARTMENT OF HUMAN RESOURCES
DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBER
NAME OF ITE
COUNTY
LO CATION RE OF PERSON(S) RECEIVING REPORT
I
SIP: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
_(b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or u pon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
(a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
(b) Adequate erosion control measures shall be practiced to pre
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on Site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shal I be adequately secured by means of gates, chai ns,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the Site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) DuAt control rneasures shall be implemented where ne�cessyy.
DATE: NAME:
Solid and Hazardous
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hou rs
du ring which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be Posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning Of Solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and dru ms shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A Site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, ani mal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the worki ng
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 maybe obtained and inspected at theSolid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within thearea to confinesolid waste subjectto beblown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the Uea by the owner or operator.
DHS 170 Re�iscd 4/85)
Solid & Hazardous Waste Management Branch (Review4/86) (white — Raleigh Office yellow — Facility green — Freparcur)
N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBER
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND,PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division. ' *
— (b) Areas which�will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
_;L�(a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secu red by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attehdant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE: NAME:
DHS 17H (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86)
(9) SIGN REQUIREMENTS
— (a) Signs providing information on du mping procedures, the hours
during which the site is open for public use, the permit number
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and dru ms shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall on ly accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 may be obtained and inspected attheSolid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subjectto be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
(white — Raleigh Office yellow — Facility green — Preparer)