HomeMy WebLinkAbout5603_ROSCANS_1988N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBfJF
NAME OF SITE COUNTY
LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimu m of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocationofa permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shal I be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shal I be adequately secu red by mea ns of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
DATE: NAME:
DH5 17N (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86)
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
d uring wh ich the site is open for public use, the permit n um ber
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traff ic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
su bmitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of u nless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in A rgi n soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 may be obtained and inspected atthe Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary;
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subjectto be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
(white — Raleigh Office yellow — Facility green — Preparer)
a
North Carolina Department of Human Resources
Division of Health Services
P.O. Box 2091 a Raleigh, North Carolina 27602-2091
James G. Martin, Governor Ronald H. Levine, M.D., M.P.H.
David T. Flaherty, Secretary April 8, 1988 State Health Director
James D. Moore, III Environmental Engineer
Collins & Aikman Corp.
P.O. Box 32665
Charlotte, N.C. 28232
RE: Revision of Construction Plans, Coilinis & Aikman Sanitary LandEill,
Permit No. 56-03
Dear Mr. Moore:
The Branch has reviewed the revised construction plans for the referenced
facility and hereby approves those plans.
Subsequent design and construction must follow the approved plans and
general operations must follow conditions previously issued in the original
permit of September, 1981 and the amended permit of August, 1982.
If there are any questions, please contact Jim Coffey at (919) 733-0692.
Sincere
id Waste Management Section
JGL/mj
cc: Jim Coffey
Julian Foscue
%�Ken Setzer
N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUM9f9
NAME OF SITE COUNTY
OF PERSON(S) RECEIVING REPORT
LOCATION
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
_(b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Apeas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
(c) After final termination of disposal operations at the Site or
major part thereof or upon revocation of a permit, the are, sh,
be covered with at least two feet of suitable compacted earth
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
(a) Surface water shall be diverted from the operational area.
(b) Surface water shall not be impounded over or in waste.
(c) Completed areas shall be adequately sloped to allow �jrface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shal I be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during wh ich the site is open for publ ic use, the permit nu mber
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
(c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid; or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confi ne Sol id waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
DATE: NAME:
Solid and Hazardous Waste Management Branch
DHS 170 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)
N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBER
NAME OF SITE COUNTY
LOCATION OF PERSON(S) RECEIVING REPORT
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least six inches of suitable cover or as
specified by the division.
— (b) Areas which wi 11 not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the Site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste.
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise Specified by
the division in the permit.
— (b) Solid waste shall not be disposed of in water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site 5hal I be adequately secu red by means of gates, chai ns,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE: NAME:
OHS 1709 (Revised 4/85)
Solid & Hazardous Waste Management Branch (Review 4/06)
(9) SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during wh ich the site is open for public use, the permit n umber
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall only accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR61 maybe obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confi ne so] ld waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
(white — Raleigh Office yellow — Facility green — Preparer)
N.C. DEPARTMENT OF HUMAN RESOURCES
WEATHER CONDITIONS DIVISION OF HEALTH SERVICES
INSPECTION FOR SANITARY LANDFILLS
PERMIT NUMBf R
NAME OF SITE COUNTY
OF PERSON(S) RECEIVING REPORT
LOCATION 71"
SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW
WITH A CROSS (X).
(1) PLAN AND PERMIT REQUIREMENTS (9)
— (a) Construction plans shall be approved and followed.
— (b) Specified monitoring and reporting requirements shall be met.
(2) SPREADING AND COMPACTING REQUIREMENTS
— (a) Solid waste shall be restricted into the smallest area feasible.
_(b) Solid waste shall be compacted as densely as practical into cells.
(3) COVER REQUIREMENTS
— (a) Solid waste shall be covered after each day of operation, with a
compacted layer of at least Six inches of suitable cover or as
specified by the division.
— (b) Areas which will not have additional wastes placed on them for
12 months or more shall be covered with a minimum of one foot
of intermediate cover.
— (c) After final termination of disposal operations at the site or a
major part thereof or upon revocation of a permit, the area shall
be covered with at least two feet of suitable compacted earth.
(4) EROSION CONTROL REQUIREMENTS
— (a) Adequate erosion control measures shall be practiced to pre-
vent silt from leaving the site.
— (b) Adequate erosion control measures shall be practiced to pre-
vent excessive on -site erosion.
(5) DRAINAGE CONTROL REQUIREMENTS
— (a) Surface water shall be diverted from the operational area.
— (b) Surface water shall not be impounded over or in waste,
— (c) Completed areas shall be adequately sloped to allow surface
water runoff in a controlled manner.
(6) VEGETATION REQUIREMENTS
— (a) Within six months after final termination of disposal operations
at the site on a major part thereof or upon revocation of a
permit, the area shall be stabilized with native grasses.
— (b) Temporary seeding will be utilized as necessary to stabilize the
site.
(7) WATER PROTECTION REQUIREMENTS
— (a) The separation distance of four (4) feet between waste and
water table shall be maintained unless otherwise specified by
the division in the permit.
— (b) Solid waste shal I not be disposed of i n water.
— (c) Leachate shall be contained on site or properly treated prior to
discharge. An NPDES permit may be required prior to the dis-
charge of leachate to surface waters.
(8) ACCESS AND SECURITY REQUIREMENTS
— (a) The site shall be adequately secured by means of gates, chains,
berms, fences, and other security measures approved by the
division, to prevent unauthorized entry.
— (b) An attendant shall be on duty at the site at all times while it is
open for public use to ensure compliance with operational
requirements.
— (c) The access road to the site shall be of all-weather construction
and maintained in good condition.
— (d) Dust control measures shall be implemented where necessary.
REMARKS:
DATE:
NAME:
SIGN REQUIREMENTS
— (a) Signs providing information on dumping procedures, the hours
during which the site is open for public use, the permit nu mber
and other pertinent information shall be posted at the site
entrance.
— (b) Signs shall be posted stating that no hazardous or liquid waste
can be received without written permission from the division.
— (c) Traffic signs or markers shall be provided as necessary to pro-
mote an orderly traffic pattern to and from the discharge area
and to maintain efficient operating conditions.
(10) SAFETY REQUIREMENTS
— (a) Open burning of solid waste is prohibited.
— (b) Equipment shall be provided to control accidental fires or
arrangements shall be made with the local fire protection
agency to immediately provide fire -fighting services when
needed.
— (c) Fires that occur at a sanitary landfill shall be reported to the
division within 24 hours and a written notification shall be
submitted within 15 days.
— (d) The removal of solid waste from a sanitary landfill is prohibited
unless the owner/operator approves and the removal is not
performed on the working face.
— (e) Barrels and drums shall not be disposed of unless they are empty
and perforated sufficiently to ensure that no liquid or hazard-
ous waste is contained therein.
(11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS
— (a) A site shall on ly accept those solid wastes which it is permitted to
receive.
— (b) No hazardous, liquid, or infectious waste shall be accepted or
disposed of in a sanitary landfill except as may be approved by
the division.
— (c) Spoi led foods, animal carcasses, abattoir waste, hatchery waste,
and other animal waste delivered to the disposal site shall be
covered immediately.
— (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as
amended through January 1, 1985, may be disposed of separate
and apart from other solid wastes at the bottom of the working
face or in an area not contiguous with other disposal areas, in
either case, in virgin soil. Separate areas shall be clearly marked
so that asbestos is not exposed by future land -disturbing activi-
ties. The waste shall be covered immediately with soil in a
manner that will not cause airborne conditions. Copies of 40
CFR 61 may be obtained and inspected at the Solid and Hazard-
ous Waste Management Branch, Division of Health Services,
P. 0. Box 2091, Raleigh, NC, 27602.
(12) MISCELLANEOUS REQUIREMENTS
— (a) Effective vector control measures shall be applied to control
flies, rodents, and other insects or vermin when necessary.
— (b) Appropriate methods such as fencing and diking shall be pro-
vided within the area to confine solid waste subject to be blown
by the wind. At the conclusion of each day of operation, all
windblown material resulting from the operation shall be col-
lected and returned to the area by the owner or operator.
Solid and Hazardous Waste Management Branch
DHS 170 Re�itnd 4/65)
Solid & H"ardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)