Loading...
HomeMy WebLinkAbout88C_ROSCANS_20014 LIS ���� NCDENK NORTH CAROLINA DEPARTMENT OF ENVIRONMENT Able, NATURAL RESOURCES FACILITY COMPLIANCE. XDIT REPORT Division of Waste Management Solid Waste Section UNIT TYPE: (check all that apply to this audit with same Permit number) Lined LCID X YW Transfer Compost SLAS COUNTY: Transylvania MSWLF PERMIT NO.: 88-C Closed xxW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P/ Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Audit: 12/19/01. Date of Last Audit: 8/04/00 FACILITY NAME AND ADDRESS: Cantrell Construction Company LCID Landfill East Fork Road Brevard NC 28712 FACILITY CONTACT NAME AND PHONE NUMBER: David and Cathy Cantrell Telephone: 828-884-6157 FACILITY CONTACT ADDRESS (IF DIFFERENT): Cantrell Construction Company P.O. Box 1677 (East Fork Road) Brevard NC 28712 AUDIT PARTICIPANTS: Janet Cantwell, NC DENR Solid Waste Section Cathy Cantrell, Cantrell Construction Company STATUS OF PERMIT: Closed PURPOSE OF AUDIT: Post -closure of the LCID Landfill NOTICE OF VIOLATION(S) (citation and explanation): None You are hereby advised that, pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $5,000 per day may be assessed for each violation of the Solid Waste Statute or Regulations. If the violation(s) noted here continue, you may be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. STATUS OF PAST NOTED VIOLATIONS (List all noted last audit): None OTHER COMMENTS /SUGGESTIONS: Heavy vegetation. Site looks good. Please contact me if you have any questions or concerns regarding this audit report. --7 -251-6784 CLL�� _(signature) Phone: 828 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES 1 FACILITY'COMPLIAN( AUDIT REPORT Division of Waste Management Solid Waste Section Distribution: original sinned copy to facility -- sinned copy to compliance officer — e-mail or copy to super Delivered on : 1/31/02 by hand delivery X US Mail Certified No. f_j DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION MEMORANDUM TO: Jim Coffey, Acting Section Chief N.C. Solid Waste Section FROM: Jim Patterson, Waste Management Specialist N.C. Solid Waste Section C7 J, SUBJECT: Closure Inspection at Cantrell Construction Company Demolition Landfill Permit No 88C Transylvania County, Facility DATE: September 27, 2001 On September 12, 2001, I conducted a closure inspection at the Cantrell Construction Company Demolition Landfill, Permit No. 88C. The inspection found the site to be closed, covered with soil, and stabilized with grass. Please let me know if further information is needed. JEP:sb cc: Brent Rockett Tim Jewett Phil Prete DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION MEMORANDUM TO: Jim Coffey, Acting Section Chief N.C. Solid Waste Section FROM: Jim Patterson, Waste Management Specialist N.C. Solid Waste Section SUBJECT: Closure Inspection at Cantrell Construction Company Demolition Landfill Permit No 88C Transylvania County, Facility DATE: September 27, 2001 On September 12, 2001, I conducted a closure inspection at the Cantrell Construction Company Demolition Landfill, Permit No. 88C. The inspection found the site to be closed, covered with soil, and stabilized with grass. Please let me know if further information is needed. JEP:sb cc: Brent Rockett Tim Jewett Phil Prete