Loading...
HomeMy WebLinkAbout21030_Trenton Cotton Mill_SIR_2021.06.15 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 06/16/2021 11:29 AM I. Inspection Information Date & Time: 06/15/2021 8:07 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Brian Kvam and John Davis- CARDNO, and Jake Somsel - Kaufman Lynn Construction Location: Lat: 35.26418, Long: -81.19296, Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 2 of 7 II. Project Information Number: 21030-17-036 Name: Trenton Cotton Mill Address: 620 W Franklin Blvd, 612 W Main Ave City: Gastonia County: Gaston III. Environmental Current Use of Property: Residential Structures on Property: Existing Structures Violation: No Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Although a VIMS is proposed for the basement level of the mill building (crawl space and outbuildings were not addressed), the VIMS Plan has not been approved as of the date of the Inspection, and work on the VIMS had not been started. Summary: N/A Summary: Former textile mill currently being converted into high density residential apartments. Projected completion date, December 2021. Summary: Exposed soil present on the property due to mill renovation activities. Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 3 of 7 Use of Basements: Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Lower-level apartments will be partial subgrade construction, with soil extending partially to completely up walls of occupied units. In general, soil extends up sides of exterior walls shortly below the bottom of each window. However, on at least some exterior walls, soil levels extend up to approximately ceiling height. See comment Photograph 5. Summary: N/A Condition: Summary: N/A Site perimeter fenced with security fencing with site access strictly controlled. No public exposure observed at the time of the site visit. Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Eastern side of mill building. New windows are being installed, and “basement” level window openings are visible in photograph. Site inspection performed so that BPMU would have a better idea of potential VI issues when evaluating the revised VIMP once submitted. In addition, explained to CARDNO personnel that I had reviewed DEQ's comments on the initial VIMP submitted, and hoped that I could answer any questions they might have regarding the review, or any other VIMS related questions during my time on the site. During the Site Inspection, went through the basement and first floor levels of the former cotton mill, and through a smaller unattached brick building on the southwest corner of the mill building parcel (north of W. Main Ave.). Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 5 of 7 Photo 2: Basement level windows visible in photo of southeastern corner of mill. Photo 3: Plumbing lines and windows visible in basement level apartments. CARDNO indicated that VIMS suction piping would be installed within utility trenches. Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 6 of 7 Photo 4: Western side of mill building constructed over crawlspace. Photo 5: Crawlspace area where portion of flooring was removed in southwestern portion of mill. Basement residential units are located on the other side of brick support wall below yellow caution tape. Brownfields Inspection Report: Trenton Cotton Mill, 21030-17-036 06/15/2021 8:07 AM Page 7 of 7 Photo 6: Future location of elevator/stairwell #1 within northeast corner of building. Photo 7: Detached brick building located at intersection of N. Trenton St., and W. Main Ave. No VIMS has been proposed for this structure at the time of the inspection.