HomeMy WebLinkAbout2020.11.17_CCOA.p.2.c.ii_Outfall003&SeepCSiteVisitOutfall 003, Treatment system,
and Seep C site visit
11/17/2020
Picture supplied by Chemours when
dam was not overflowing and both
intake structures can be seen
System has two intakes, two
wet wells, and two pumps.
Only one is used at a time, the
other is backup.
Picture supplied by Chemours
10 AM on 11/13 as water was rising
Picture supplied by Chemours
12 PM on 11/13. Water
overflowing dam
Follow the green mulch buffer to
the end, below the dam, and the
Outfall structure is to the right –
a small discharge can be seen.
Chemours supplied this picture –shows platform for in-situ treatment at Seep C. Note ladder is what is seen in previous slides