Loading...
HomeMy WebLinkAbout2020.11.17_CCOA.p.2.c.ii_Outfall003&SeepCSiteVisitOutfall 003, Treatment system, and Seep C site visit 11/17/2020 Picture supplied by Chemours when dam was not overflowing and both intake structures can be seen System has two intakes, two wet wells, and two pumps. Only one is used at a time, the other is backup. Picture supplied by Chemours 10 AM on 11/13 as water was rising Picture supplied by Chemours 12 PM on 11/13. Water overflowing dam Follow the green mulch buffer to the end, below the dam, and the Outfall structure is to the right – a small discharge can be seen. Chemours supplied this picture –shows platform for in-situ treatment at Seep C. Note ladder is what is seen in previous slides