Loading...
HomeMy WebLinkAbout09060_Camden Square 2nd Amend_SIR_20191114 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 11/18/2019 10:21 AM I. Inspection Information Date & Time: 11/14/2019 1:37 PM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter, Cody Cannon Other Personnel: Alexis McKenzie - Hart &Hickman Location: Lat: 35.21163, Long: -80.86132, Brownfields Inspection Report: Camden Square 2nd Amendment, 09060-05-060 11/14/2019 1:37 PM Page 2 of 5 II. Project Information Number: 09060-05-060 Name: Camden Square 2nd Amendment Address: W. Worthington Ave. City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Mixed Use Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: VIMS (CUPOLEX® aerated floor system) being installed throughout first floor of structure. Approximately 75% of sub-slab forms installed at time of inspection. Summary: N/A Summary: Thirteen story mixed-use building currently under construction. Summary: N/A Brownfields Inspection Report: Camden Square 2nd Amendment, 09060-05-060 11/14/2019 1:37 PM Page 3 of 5 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A Fenced, secured construction site. No observed risk to public during building construction activities. Brownfields Inspection Report: Camden Square 2nd Amendment, 09060-05-060 11/14/2019 1:37 PM Page 4 of 5 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: View of CUPOLEX® forms installed on eastern portion of structure. Onsite to observe VIMS installation activities. Met with Alexis McKenzie (H&H) who discussed installation of CUPOLEX® aerated floor system. CUPOLEX® appeared to be approximately 75% installed at time of inspection. Discussed proposed VIMS operation (active), along with other system details. A single 6” dia. steel riser (to be installed on northeast side of building) will vent CUPOLEX® VIMS. Brownfields Inspection Report: Camden Square 2nd Amendment, 09060-05-060 11/14/2019 1:37 PM Page 5 of 5 Photo 2: CUPOLEX® with Benton Stop® forms (sealed ends) installed adjacent to building footer. Voids between forms will be filled with concrete once floor slab is poured. Photo 3: Void space under CUPOLEX® during installation.