HomeMy WebLinkAbout63C_INSP_20210825FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 6
UNIT TYPE:
Lined MSWLF LCID X YW Transfer Compost SLAS COUNTY: MOORE
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 63C-LCID
CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: August 25, 2021 Date of Last Inspection: July 23, 2021
FACILITY NAME AND ADDRESS: Stump Hole LCID Landfill 121 Holly Ridge Road Carthage, North Carolina GPS COORDINATES: Lat.: 35.29045 Long.: 79.43926 FACILITY CONTACT NAME AND PHONE NUMBER: Allan Casavant, 910-673-1186 Chuck Boyer, 910-944-2955
FACILITY CONTACT ADDRESS: Allan Casavant
BCB Development Corp. PO Box 12
West End, NC 27376
allan@kkcubuilders.com allan@casavantgroup.com
PARTICIPANTS: David Powell, NCDEQ– SWS
Andrew Hammonds, NCDEQ – SWS Allan Casavant – Stump Hole Landowner
STATUS OF PERMIT: Expired September 16, 2018
PURPOSE OF SITE VISIT: Complaint Inspection Follow Up STATUS OF PAST NOTED VIOLATIONS: 15A NCAC 13B .0566 (7): UNRESOLVED- This rule has been readopted in 2021 and has changed is now combined into (3), (4), and (5). (3) All waste shall be covered with no less than six inches of soil monthly, or when the working face reaches one acre in size, whichever occurs first. Any soils used for cover at the site shall meet unrestricted use standards for soils as defined in G.S. 130A-310.65. (4) Areas that will not have additional wastes placed on them for three months or more, but where final termination of disposal operations has not occurred, shall be covered with no less than one foot of soil cover sloped to direct the flow of surface water from the landfill, and stabilized with vegetative ground cover or other stabilizing material. The Division may require further action to correct any condition that the Division determines may be injurious to the public health, or a nuisance to the community. (5) erosion control measures, structures, or devices shall be utilized to prevent silt from leaving the site and to prevent on-site erosion, and shall comply with 15A NCAC 04.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 6
Permit to operate Attachment 3, cover material requirements #21 states, “Within 120 calendar days after completion of the final disposal operations, the disposal area must be closed and covered with a minimum of one (1) foot of suitable soil cover sloped to allow surface water runoff in a controlled manner. However, for ditches located on the landfill, at least 2 feet of soil cover is required between the bottom elevation of the ditches and the waste mass.” 15A NCAC 13B 0.0564 (9): UNRESOLVED – This rule has been readopted in 2021 and is now (6) Buffer
Requirements: A site shall maintain the following buffer requirements:(a) 50 feet from the waste boundary to waters of the State as defined in G.S. 143-212. (b) 100 feet from the waste boundary to property lines, residential dwellings, commercial or public buildings, and potable wells.
OBSERVED VIOLATIONS: NA
ADDITIONAL COMMENTS
1. Purpose of this inspection was to follow up on the closure of this facility and also to provide technical assistance to Mr. Casavant. 2. The permit for the Stump Hole LCID landfill expired in September of 2018. Allan Casavant, owner, decided to begin closure process at the landfill instead of applying for a permit renewal. There has been recent communication with Mr. Casavant about submitting the completed final paperwork for closure but it has yet to
be submitted. Please do so ASAP once corrective actions have been addressed. Also, please ensure the LCIDLF has the required depth of soil cover for closure, which should be reflected in the engineering document that will be submitted to Section Permitting. 3. Be sure and continue to remove unapproved wastes. Most items at this time seem to be outside Edge of
Waste (EOW). Nothing should be on the landfill or inside EOW markers. New EOW markers have been added. T-posts were visible and represented the EOW, according to Mr. Casavant. It should be determined if all these markers are EOW markers and in correct locations. Inspector will need to revisit for closure and verify the distance of buffers using these EOW markers. Permit Condition No. 10, Part 1 of Attachment 3 of the Permit to Operated dated September 16, 2013 (DIN 18927) - The permanent markers that accurately delineate the waste disposal boundary must be maintained.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 6
4. Some areas were recently seeded after soil was brought in and spread. Good job. Mr. Casavant stated that a water truck was to be brought in to irrigate the seeded areas previously. This seems to have worked on most of the bare areas. The more difficult areas of seeding, a matting was brought in and better soil was added and reseeded. Shrubs have been removed and most of the area has been mowed. Good job.
Matting and reseeded.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 6
Landfill has been mowed. 5. Some uncovered/unapproved waste was visible during inspection, although site staff have been picking up much block, rock, vegetative wastes and going to have them removed. Be sure they are disposed at the appropriate landfill and document disposal with weight tickets or photos.
Tarp and uncovered waste.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 5 of 6
Waste picked up from landfill to be removed. Document disposal.
6. During last visit a couple pallets of motor oil in five gallon buckets were being stored just outside EOW. These waste have been removed, good job.
7. If not already done so, landowner should communicate with the Sections Permit Engineer, Ming Chao, and with Moore County, to ensure all requirements that are needed for closure. Owner should communicate with Moore County Planning and Zoning for any permits or actions they may require. Also, DEMLR should be contacted, (910-433-3300 Tim LaBounty) in regards to any mining, sedimentation and erosion control and storm water requirements. 8. The Section has not received the require documentation to close the site. Once the property is sold, then new owner can apply for a permit at that time if they wish, but the site must be properly closed and in compliance per the rules before submitting a new application for permit. Please bring this site into compliance and submit required closure documentation. Once the issues at this site have been addressed then the Violations can be resolved.
9. Corrective measures are necessary to bring the landfill into compliance and should be completed within 30 day’s receipt of this inspection report. Confirm EOW markers/location and that site is compliant with buffer rules. Requested final closure documents need to be submitted to Section Permitting. Ensure
proper cover and finish establishing grass cover. Cover or remove exposed wastes inside landfill. All Equipment removed from landfill and inside EOW markers. Check with Moore County Solid Waste/Planning and Zoning on closure requirements. Check with DEMLR on closure requirements.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 6 of 6
Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 910-433-3350 _ David Powell Environmental Senior Specialist Regional Representative
Sent on: 9/10/2021 x Email Hand delivery US Mail Certified No. [ _]
Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section Ming Chao, Permitting Engineer – Solid Waste Section