FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
SLAS
COUNTY: WAKE
MSWLF
PERMIT NO.: 9228-CDLF-2001
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
x
Tire T&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: July 22, 2021
FACILITY NAME AND ADDRESS:
Red Rock Disposal LLC/Waste Industries, Inc. C&D Landfill
7130 New Landfill Drive
Holly Springs, NC 27540
GPS COORDINATES: Lat.: 35.60580 Long.:-78.90062
FACILITY CONTACT NAME AND PHONE NUMBER:
Donald Plessinger, General Manager
Waste Industries, Inc.
w. 919-557-9583, c. 919-201-1434, f. 919-557-9523
Donald.plessinger@wasteindustries.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Davy Conners, NC DEQ — Solid Waste Section
Don Plessinger, GFL Environmental
Scott, GFL Environmental
STATUS OF PERMIT:
Date of Last Inspection: April 13, 2021
A Permit to Construct Phase 3 and Permit to Operate Phase 1, 3A-1, and 3A-1.2 was issued to Red Rock Disposal, LLC
(9228-CDLF-2001) on October 27, 2020 and will expire on November 19, 2061 or when the facility reaches its final
permitted elevations. The twenty-year term of the franchise agreement with the County of Wake was executed on June 5,
2000(FID 1226738).
PURPOSE OF SITE VISIT:
Follow up inspection of Red Rock Disposal's self -reported leachate release.
STATUS OF PAST NOTED VIOLATIONS:
1. Violation: 15A NCAC 13B .0542 (1)(4), Leachate must be contained on -site or treated prior to discharge. An
NPDES permit may be required prior to the discharge of leachate to surface waters.
Status: Corrective Actions Underway. Previously, Red Rock Disposal, LLC had taken actions that stopped the
flow of leachate. These actions included: pumping the leachate from the sumps in the French Drain System and
hauling either to a wastewater treatment facility or the top of the landfill, repairing the toe of the slope where the
leachate release occurred, and repairing the pipe fitting where a second release occurred. Red Rock submitted a
samplingplan and report to the Section, which were approved on March 30, 2021. Soils from the leachate impacted
ditch and pond had been removed prior to the sampling event. Red Rock Disposal must still submit an updated
Operations Plan once the long term solutions for handling leachate at the site have been determined.
Page 1 of 3
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS:
The facility is a construction and demolition debris landfill (C&DLF). The facility is permitted to receive construction
and demolition debris, inert debris, land clearing debris, and (used) asphalt from 60 of the counties in NC.
1. During the inspection, the working face was appropriately sized.
2. Monitoring stations had been installed in the leachate collection system but were waiting on a part to get them
functioning.
3. Leachate has been being pumped out of the collection system both for the evaporative system and for dust control
on the working face.
4. This inspection was a follow up inspection focused on the leachate management system. Records were not
reviewed.
Photos taken during the inspection can be found in Attachment 1. Please contact me if you have any questions or concerns
regarding this inspection report.
�1 �-1 r
Digitally signed by Davy Conners
Davy Conner 5 Date: 2021.08.03 15:08:51-04'00'
Davy Conners
Environmental Senior Specialist
Regional Representative
Phone: (919) 707-8290 (o), (919) 621-3685 (c)
Sent on: August 3, 2021 x Email Hand delivery US Mail Certified No.
Copies: Jason Watkins, Field Operations Branch Head
Sherri Stanley, Permitting Branch Head
Andrew Hammonds, Eastern District Supervisor
Diana Felix, Permitting Engineer
Bryan Wuester, GFL Environmental
Joan Smyth, Smith Gardner
Stacy Smith, Smith Gardner
Mike Brinchek, Smith Gardner, Inc.
Page 2 of 3
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
o"-t0E'"�m"""°"""' Solid Waste Section
Attachment 1: Inspection Photos
Taken by Davy Conners on July 22, 2021
Figure 1: Leachate monitoring station and evaporation
Figure 3: Good cover on the landfill.
Figure 2: Pump station for the leachate system.
Figure 4: Appropriately sized working face of the
C&DLF.
Page 3 of 3