Loading...
HomeMy WebLinkAbout9228_INSP_20210722NORTH CAR()LINAD_E Q�� OepaNnent W Envimnm.nbl pwl� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer Compost SLAS COUNTY: WAKE MSWLF PERMIT NO.: 9228-CDLF-2001 Closed HHW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF x Tire T&P/ Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: July 22, 2021 FACILITY NAME AND ADDRESS: Red Rock Disposal LLC/Waste Industries, Inc. C&D Landfill 7130 New Landfill Drive Holly Springs, NC 27540 GPS COORDINATES: Lat.: 35.60580 Long.:-78.90062 FACILITY CONTACT NAME AND PHONE NUMBER: Donald Plessinger, General Manager Waste Industries, Inc. w. 919-557-9583, c. 919-201-1434, f. 919-557-9523 Donald.plessinger@wasteindustries.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Davy Conners, NC DEQ — Solid Waste Section Don Plessinger, GFL Environmental Scott, GFL Environmental STATUS OF PERMIT: Date of Last Inspection: April 13, 2021 A Permit to Construct Phase 3 and Permit to Operate Phase 1, 3A-1, and 3A-1.2 was issued to Red Rock Disposal, LLC (9228-CDLF-2001) on October 27, 2020 and will expire on November 19, 2061 or when the facility reaches its final permitted elevations. The twenty-year term of the franchise agreement with the County of Wake was executed on June 5, 2000(FID 1226738). PURPOSE OF SITE VISIT: Follow up inspection of Red Rock Disposal's self -reported leachate release. STATUS OF PAST NOTED VIOLATIONS: 1. Violation: 15A NCAC 13B .0542 (1)(4), Leachate must be contained on -site or treated prior to discharge. An NPDES permit may be required prior to the discharge of leachate to surface waters. Status: Corrective Actions Underway. Previously, Red Rock Disposal, LLC had taken actions that stopped the flow of leachate. These actions included: pumping the leachate from the sumps in the French Drain System and hauling either to a wastewater treatment facility or the top of the landfill, repairing the toe of the slope where the leachate release occurred, and repairing the pipe fitting where a second release occurred. Red Rock submitted a samplingplan and report to the Section, which were approved on March 30, 2021. Soils from the leachate impacted ditch and pond had been removed prior to the sampling event. Red Rock Disposal must still submit an updated Operations Plan once the long term solutions for handling leachate at the site have been determined. Page 1 of 3 NORTH CAR()LINAD_E Q�� OepaNnent of Envieonmenbl Wel� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS: The facility is a construction and demolition debris landfill (C&DLF). The facility is permitted to receive construction and demolition debris, inert debris, land clearing debris, and (used) asphalt from 60 of the counties in NC. 1. During the inspection, the working face was appropriately sized. 2. Monitoring stations had been installed in the leachate collection system but were waiting on a part to get them functioning. 3. Leachate has been being pumped out of the collection system both for the evaporative system and for dust control on the working face. 4. This inspection was a follow up inspection focused on the leachate management system. Records were not reviewed. Photos taken during the inspection can be found in Attachment 1. Please contact me if you have any questions or concerns regarding this inspection report. �1 �-1 r Digitally signed by Davy Conners Davy Conner 5 Date: 2021.08.03 15:08:51-04'00' Davy Conners Environmental Senior Specialist Regional Representative Phone: (919) 707-8290 (o), (919) 621-3685 (c) Sent on: August 3, 2021 x Email Hand delivery US Mail Certified No. Copies: Jason Watkins, Field Operations Branch Head Sherri Stanley, Permitting Branch Head Andrew Hammonds, Eastern District Supervisor Diana Felix, Permitting Engineer Bryan Wuester, GFL Environmental Joan Smyth, Smith Gardner Stacy Smith, Smith Gardner Mike Brinchek, Smith Gardner, Inc. Page 2 of 3 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA o"-t0E'"�m"""°"""' Solid Waste Section Attachment 1: Inspection Photos Taken by Davy Conners on July 22, 2021 Figure 1: Leachate monitoring station and evaporation Figure 3: Good cover on the landfill. Figure 2: Pump station for the leachate system. Figure 4: Appropriately sized working face of the C&DLF. Page 3 of 3