Loading...
HomeMy WebLinkAbout1904_ Chatham HHW PTO 24760.pdf Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 1 of 8 North Carolina Department of Environmental Quality Division of Waste Management Pat McCrory Governor 1601 Mail Service Center, Raleigh, North Carolina 27699-1601 Phone: 919-707-8600 \ Internet: www.ncdenr.gov An Equal Opportunity / Affirmative Action Employer – Printed on Dual Purpose Paper Donald R. van der Vaart Secretary STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION PERMANENT HOUSEHOLD HAZARDOUS WASTE FACILITY Permit No. 19-04-TP CHATHAM COUNTY is hereby issued a PERMIT TO CONSTRUCT/OPERATE PERMANENT HOUSEHOLD HAZARDOUS WASTE COLLECTION FACILITY Located at Chatham County LCID, 39 County Services Rd., Pittsboro, Chatham County, North Carolina, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated there under and subject to the conditions set forth in this permit. The legal description of the site is identified on the deeds recorded for this property listed in Attachment 1, Part III of this permit. Edward F. Mussler, III, P.E., Permitting Branch Supervisor Solid Waste Section Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 2 of 8 ATTACHMENT 1 PART I: PERMITTING HISTORY PART I: PERMITTING HISTORY 1. The original Permit to Operate was issued on May 2, 1995. 2. On November 4, 1998 a modification was made to the Permit to Operate for a revision to the site plan. 3. On October 15, 2010 an amendment was made to the Permit to Operate for a five-year renewal. 4. On October 15, 2015 an amendment was made to the Permit to Operate for a five-year renewal. Permit Type Date Issued Document ID No. Permit to Operate May 2, 1995 Permit Modification November 4, 1998 Permit Renewal October 15, 2010 10892 Permit Renewal October 13, 2015 24760 PART II: LIST OF DOCUMENTS FOR THE APPROVED PLAN PART III: PROPERTIES APPROVED FOR THE SOLID WASTE FACILITY Chatham County, N.C. Register of Deeds Book Page Acreage Grantor Grantee 90 192 64.67± Chatham County Chatham County Solid Waste 64.67± Total Facility Acreage Notes: NO. DOCUMENT DESCRIPTION DOC. ID NO. 1. Operational Plan & Contingency Plan for the Chatham County Permanent Household Hazardous Waste Facility. Prepared by: Sandy Skolochenko. Prepared for: Chatham County. April 15, 2015 24925 Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 3 of 8 PART VI: GENERAL PERMIT CONDITIONS 1. This permit shall expire on Oct 13, 2020. Pursuant to 15A NCAC 13B .0201(g), no later than May 15, 2020, the owner or operator must submit a request to the North Carolina Department of Environmental Quality, Division of Waste Management, Solid Waste Section (“Section”) for permit review and must update pertinent facility plans including, but not limited to, the facility operation and waste screening plans. 2. The persons to whom this permit is issued (“permittee”) are the owners and operators of the solid waste management facility. 3. (Intentionally Blank) 4. (Intentionally Blank) 5. By receiving waste at this facility the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of the Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit; and the approved plan. Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. 7. This permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, Part II: “List of Documents for Approved Plan”, and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. 8. This permit may be transferred only with the approval of the Section, through the issuance of a new or substantially amended permit in accordance with applicable statutes and rules. In accordance with NCGS 130A-295.2(g) the permittee shall notify the Section thirty (30) days prior to any significant change in the identity or business structure of either the owner or the operator, including but not limited to a proposed transfer of ownership of the facility or a change in the parent company of the owner or operator of the facility. Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 4 of 8 9. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for a General or Individual NPDES Stormwater Discharge Permit. Issuance of this permit does not remove the permittee’s responsibilities for compliance with any other local, state or federal rule, regulation or statute. - End of Section - Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 5 of 8 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT This Section is not applicable. ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I OPERATING CONDITIONS 1. This facility is permitted to receive Household Hazardous Waste (HHW) generated within Chatham County, or in accord with an agreement, from other counties. To qualify as HHW the waste must be: a. Generated by individuals on the premises of a residence for individuals (a household), and; b. Composed primarily of materials found in the wastes generated by consumers in their homes. 2. This facility is permitted to accept hazardous waste from conditionally exempt small quantity generators (CESQG) as defined in 40 CFR 261.5. a. CESQG collected shall be accounted and reported separately from HHW. A copy of the report shall be sent annually to the Hazardous Waste Section of the NCDENR Division of Waste Management 3. This facility is prohibited from storing any other types of wastes including unacceptable or unauthorized HHW such as the following: a) Radioactive materials; b) Infectious or medical wastes; c) Explosives/shock sensitive material, explosive organic peroxides, ammunitions; and d) Polychlorinated biphenyls (PCB) waste as defined in 40 CFR 761, with the exception of fluorescent light ballasts and PCB household waste as defined in 40 CFR 761.63 The unacceptable waste may be confiscated until qualified personnel can be located for proper disposal. 4. The permittee must develop, and use, a training and screening program at the facility for detecting and preventing unauthorized wastes from being accepted at the facility. Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 6 of 8 5. This facility shall conform to all operating procedures in the approved planand 15A NCAC 13B .0400. 6. A responsible individual trained and certified in facility operations must be on-site at all times during all operating hours of the facility, in accordance with G.S. 130A-309.25. 7. Only personnel who have been trained in accordance with the approved training program in the Operation Plan shall participate in collection activities. 8. Facility personnel shall inspect the facility's emergency equipment and supplies on a weekly basis. Adequate amounts of absorbent material shall be maintained on-site to clean up spills or leaks of small quantities. 9. The facility shall be adequately secured by means of gates, chains, berms, fences, or other security measures to prevent unauthorized entry. Signs shall be posted at the facility entrance stating the hours of operation and other pertinent information. 10. Containers shall be labeled to clearly identify the contents and the date upon which accumulation began. Waste shall not be stored for greater than one year. HHW shall be transported off-site for recycling, treatment and/or disposal. 11. Sump outlets in the HHW collection building shall remain plugged and closed. 12. Materials shall be stored in the HHW collection facility so as to not obstruct the movement of personnel, fire protection equipment, spill control equipment, and decontamination equipment during an emergency. 13. Containers used for storage shall be in good condition and shall be managed so as to prevent leaks. Containers shall be thoroughly rinsed after emptying to ensure incompatible materials are not mixed. 14. The date upon which each period of accumulation begins shall be clearly marked and visible on each container. Each container shall be labeled or marked clearly with the words "Hazardous Waste" unless the container separately holds recyclable material. 15. Household Hazardous Waste Generator Identification Number NCPH0199501 shall be used to ship wastes off site for recycling, treatment, or disposal. 16. In the unlikely event of an incident which threatens human health or the environment outside the facility boundary and/or which results in halting operations at the facility, the Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 7 of 8 Emergency Response Coordinator shall implement the approved Contingency Plan. At a minimum, the Emergency Response Coordinator shall: a. Immediately notify Chatham County Emergency Management Service. b. Notify the Solid Waste Section's Environmental Senior Specialist in the Raleigh Central Office at (919) 707-8200 within 24 hours of the incident. c. Identify the character, source, and amount of all released hazardous materials. d. Assess the possible hazards to human health and the environment. e. Ensure that, in the affected areas of the facility: i) no waste that may be incompatible with the released material is stored until cleanup procedures are completed, and; ii) all emergency equipment is cleaned and fit for its intended use before operations are resumed. f. Note in the operating record the time, date, and details of the incident. g. Submit a written report detailing the incident to the Solid Waste Section within 15 days of the incident. 17. The facility may not resume operations after an incident, until they notify the Solid Waste Section's Environmental Senior Specialist in the Raleigh Central Office and Chatham County's Emergency Management Service that the facility is ready to resume operations. 18. Copies of this permit, the approved plans and all records required to be maintained by the permittee must be maintained at the facility, unless otherwise approved by the Section, and made available to the Section upon request during normal business hours. 19. The permittee must maintain a record of the amount of solid waste received at the facility, including daily records of waste received and origins of the loads. The daily records are to be summarized into a monthly report for use in the required annual reports. 20. On or before August 1 annually, the Permittee must submit an annual facility report to the Solid Waste Section, on forms prescribed by the Section. a. The reporting period shall be for the previous year beginning July 1 and ending June 30. b. The annual facility report must list the amount of waste received and be compiled: i) On a monthly basis. ii) By county or city of origin. iii) By specific waste type. iv) By receiving disposal facility. v) By diversion to alternative management facilities. Facility Permit No: 19-04-HHW Generator ID No.:NCPH0199501 Permit to Construct/Operate Chatham County Household Hazardous Waste Issuance Date: October 13, 2015 Doc ID: 24760 Page 8 of 8 c. The completed report must be forwarded to the Regional Environmental Specialist for the facility by the date due on the prescribed annual facility report form. d. A copy of the completed report must be forwarded to each county manager for each county from which waste was received the facility. Documentation that a copy of the report has been forwarded to the county managers must be sent to the Regional Environmental Specialist by the date due on the prescribed annual facility report form. PART II- MISCELLANEOUS SOLID WASTE MANAGEMENT CONDITIONS This Section is not applicable. - End of Permit Conditions –