Loading...
HomeMy WebLinkAbout4112_INSP_20210713FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost SLAS COUNTY: Guilford Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 41-12 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: July 13, 2021 Date of Last Inspection: September 03, 2020 FACILITY NAME AND ADDRESS: City of Greensboro MSW Landfill – White Street Landfill 2503 White Street Greensboro, NC 27405 GPS COORDINATES: Lat.: 36.10454 Long.: -79.73018 FACILITY CONTACT NAME AND PHONE NUMBER: David Deel, Solid Waste Disposal Manager w. 336-412-3959 c. 336-382-8366 david.deel@greensboro-nc.gov FACILITY CONTACT ADDRESS: City of Greensboro Field Operations Department David Deel, Solid Waste Disposal Manager 2503 White Street Greensboro, NC 27405 PARTICIPANTS: Chuck Kirchner, Environmental Senior Specialist – Solid Waste Section (SWS) Lewis S. Walker, Jr., Landfill Supervisor - City of Greensboro Field Operations Department STATUS OF PERMIT: Permit to Operate (PTO) issued June 11, 2015 PTO Expiration date April 14, 2020 Permit Renewal Application originally submitted September 13, 2019 is still under review PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS On July 13, 2021, Chuck Kirchner with the Solid Waste Section met with Lewis Walker of the City of Greensboro Solid Waste Department to conduct a partial inspection of the White Street MSW landfill. Facility Information: 1. The City of Greensboro operates a municipal solid waste (MSW) landfill (Phase III, 41-12). The property also contains a large type I solid waste compost (SWC) facility (41-03), a construction and demolition debris (C&D) atop a closed MSW landfill (Phase II, 41-03) adjacent to a closed unlined MSW landfill (Phase I), and a temporary disaster debris staging site (TDDSS, DS41-002). 2. The facility is open Monday through Friday 7:50 am to 4:50 pm and Saturday 7:00 am to 1:00 pm. 3. The facility is permitted to receive solid waste generated within the City of Greensboro and Guilford County. 4. The MSW landfill is permitted to operate Phase III, Cells 1, 2 and 3. 5. The facility does not accept scrap tires or white goods. 6. The MSW landfill Cells 1 and 2 contain intermediate soil cover and have a good grass cover. 7. Waste is currently being placed in Cell 3. Facility Inspection: 8. Leachate from Phase III Cells 1, 2, and 3 drain into a leachate manhole before being routed to the leachate storage tanks. During the inspection, the leachate manhole was observed and appears in good condition. 9. The facility has two 350,000-gallon leachate storage tanks with a secondary containment wall. Leachate is generally maintained in tank A. During the inspection, the leachate level in Tank A was 16.0 feet and Tank B was 4.0 feet. The leachate tanks were observed to be in good condition. Tank A is used primarily for leachate collection and is pumped down once the tank reaches approximately 18-19 feet. According to facility staff the tanks will also be pumped down in anticipation of a large storm event. The leachate tanks are connected by spillover pipe and can be pumped from one to the other. 10. The leachate storage tanks are connected to the City of Greensboro sanitary sewer which flows to the TZ Osborne wastewater treatment plant. 11. The facility [Phase III] has a landfill gas collection system. The landfill gas pipeline to Cone Mills has been capped and is no longer used as boiler fuel. Landfill gas from the Phase III area is flared off. The landfill gas flare was observed in operation. 12. The working face was observed to be very small and compact. 13. The working face is regularly covered with soil and an adequate amount of soil is on location to use as cover material. 14. The facility is currently permitted to use Posi-Shell if needed. 15. The MSW landfill Cells 1 and 2 contain intermediate soil cover. 16. The facility is permitted for leachate recirculation. Leachate recirculation is not currently conducted. 17. Adequate soil was observed around the working face for use as cover material. 18. Continue to seed and mulch and bare areas or areas with sparse grass cover in Phase III as needed. 19. Erosion and sedimentation controls appeared to be in good order. 20. The facility has installed edge of waste markers. Markers are on a steel post and have a yellow sign that clearly states: ‘Edge of Waste’. 21. During the inspection odor was not detected. 22. Landfill cap appears to be well maintained. 23. Windblown material was not observed. 24. The facility has a water truck available for dust control. General Comments: 25. The facility has proper signage. 26. Access roads are of all-weather construction. 27. The facility is secured by a locked gate. 28. In the event of an emergency the facility will call 911 for assistance. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 29. Ensure any requested information is provided to the Solid Waste Section Permitting Branch in a timely manner. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 336-776-9633 _ Chuck Kirchner Environmental Senior Specialist Regional Representative Sent on: July 14, 2021 X Email Hand delivery US Mail Certified No. [ _] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Sherri Stanley, Permitting Branch Head – Solid Waste Section Ming-Tai Chow, P.E., Environmental Engineer – Solid Waste Section Lewis Walker, Landfill Compliance Supervisor – City of Greensboro, Lewis.Walker@greensboro-nc.gov Richard Lovett, Environmental Compliance Support Manager – City of Greensboro, Richard.Lovett@greensboro-nc.gov