Loading...
HomeMy WebLinkAbout74-07,20121127INSP11 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer Compost SLAS COUNTY: Pitt I MSWLF PERMIT NO.: 74-07 Closed HF1W White X Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF X TireT&P/ X Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: November 27, 2012 FACILITY NAME AND ADDRESS: EJE Recycling C&D Landfill 802 Recycling Lane Greenville, North Carolina 27834 GPS COORDINATES: Name: Judson Whitehurst, Wayne Bell Telephone: 252 752 8274, cell 252 717 8150 Bell Email address: gwbe1132gyahoo.com Fax: 252 752 1916 FACILITY CONTACT ADDRESS: Judson Whitehurst EJE Recycling 802 Recycling Lane Greenville, North Carolina 27834 PARTICIPANTS: Ben Barnes, NCDENR Solid Waste Wayne Bell, EJE Site Manager Date of Last Inspection: October 11, 2012 STATUS OF PERMIT: Active, permit issued March 21, 2009 and expires on July 21, 2014. No later than March 21, 2014 submit to the Division an application for permit review. PURPOSE OF SITE VISIT: Comprehensive inspection of a Construction and Demolition Landfill STATUS OF PAST NOTED VIOLATIONS: NONE OBSERVED VIOLATIONS NONE FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1 . The permit issued on July 21, 2009 is for the operation of Phase I cells 1-8, and for the construction of Phase 2A. In 2009 Phase 1 and 2 were combined into one parcel. 2. Certified Operators are: Michael Warren expires 8/27/2015, Sheila Smith expires 8/27/2015, Tracy Shaw expires 8/27/2012, John James Whitehurst Jr. expires 10/16/2015 and Wayne Bell 8/27/2015. 3. The facility is permitted to receive up to 300 TPD, it is receiving 110 TPD at this time. 4. The service are includes Beaufort, Bertie, Bladen, Brunswick, Camden, Carteret, Chatham, Chowan, Craven, Cumberland, Currituck, Dare, Duplin, Durham, Edgecombe, Franklin, Gates, Granville, Greene, Halifax, Harnett, Hertford, Hyde, Johnston, Jones, Lenoir, Martin, Nash, New Hanover, Northampton, Onslow, Pamlico, Pasquotank, Pender, Perquimans, Pitt, Sampson, Tyrrell, Vance, Wake, Warren, Washington, Wayne, and Wilson Counties 5 . The normal operating hours are 7:OOAM to 4PM M-F and 7AM to 12PM Saturday. 6. The permit and operations plan were reviewed and were kept in a convenient location for staff access. 7. EJE Recycling has revised their waste screening program to prevent contaminated soil from being accepted and used for cover. 8. Phase 1 of the landfill has stopped receiving waste and is in the process of being closed, waste is now being accepted at Phase 2A. 9. The GW wells MW-ls, MW-ld, MW-2, MW-2d, MW-3A, MW-3s, MW-3d, MW-4, MW-5, MW-6, MW-7, MW-8, (phase 1) and MW- 9A, MW-10, MW-11, MW-12, MW-13, MW-14, MW-14d, (phase) . The wells that were checked were locked. The area around some of the GW monitoring wells needs to be cleared of brush. 10. The Edge of waste markers have been installed and are visible. 11. A GW assessment plan was submitted to the Division on 6/22/2009. 12. The working face was small. 13. There was uncovered waste material scattered on site particularly along the base of the slope around the working face noted on the October 11, 2012 inspection. This waste has been covered. 14. The facility needs to measure and record rainfall as specified in the Ops Plan. 15. The records look good. 16. The cover is much improved as noted in item #13. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 252 459 4502 email: ben.bames@ncdenr.gov FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 Ben Barnes Environmental Senior Specialist Regional Representative Sent on: December 6, 2012 X Email Hand delivery US Mail Certified No. lI Copies: Dennis Shackelford, Eastern District Supervisor Jessica Montie, Compliance Officer The northern slope of the landfill showing much better cover