Loading...
HomeMy WebLinkAbout33-008,01051211 NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW X Transfer Compost SLAS COUNTY: Edgecombe MSWLF PERMIT NO.: 33-008 Closed xllW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF Tire T&P / Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: January 5, 2012 FACILITY NAME AND ADDRESS: Town of Tarboro, Baker St. Compost Facility 2001 E Baker St. Tarboro, North Carolina 27886 GPS COORDINATES: N: 35.91394 Date of Last Inspection: Initial inspection E: 77.53544 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Troy Lewis, Public Works Director Town of Tarboro Telephone: 252 641 4229, cell 252 908 4675 Email address: troy, 1�gtarboro-nc.com Fax: 252 641 4230 FACILITY CONTACT ADDRESS: Town of Tarboro P.O. Box 220 Tarboro, North Carolina 27886 PARTICIPANTS: Ben Barnes, NCDENR Solid Waste Section Troy Lewis, Town of Tarboro STATUS OF PERMIT: Notified site, the notification is up to date PURPOSE OF SITE VISIT: Comprehensive Audit STATUS OF PAST NOTED VIOLATIONS: NONE OBSERVED VIOLATIONS 15A NCAC 1311.1406 OPERATIONAL REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES (14)(A) The finished compost shall meet the classification and distribution requirements outlined in Rule .1407 of this Section. The Tarboro YW facility is in violation of this rule in that yard waste has been dumped haphazardly on many areas of the site for many years with no management. In order for the Tarboro yard waste facility to be brought into compliance, move the yard waste that has been dumped in various areas on the site to the desienated vard waste area and manaee as needed. Locate an end user for the compost and remove. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 5 (C)(ii) The amount of compost stored at the facility shall not exceed the designed storage capacity. The Tarboro YW facility is in violation of this rule in that over 6000 cubic yards of waste has apparently been dumped on the site. In order for the Tarboro Baker St. YW facility to be brought into compliance, locate an end user for the yard waste and begin removal. NOTE: Complete the above actions by March 2, 2012 The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. The YW facility is located on the same property as the old Tarboro town dump. It is not known where the boundaries of the old dump are located. 2. 15A NCAC 13B .1404 SITING/DESIGN REQUIREMENTS FOR SOLID WASTE COMPOST FACILITIES (7) requires that "any portion of a compost facility located over a closed solid waste disposal facility shall be located over a pad". If any portion of the notified YW facility is found to be located over the closed Tarboro Dump, this yard waste either must be moved to an area not part of the old closed dump or a pad constructed over the old waste. Sites located over a closed out disposal area may require a permit according to 15A NCAC 13B .1402 (g)(3)(D). The boundaries of the Tarboro Town dump need to be located to ensure that YW is not dumped and processed over this area. 3. The property is owned by the Town of Tarboro and is a 14.56 acre tract parcel ID# 473991405200 and is recorded in Book 885 page 189 of the Edgecombe Co. Register of Deeds. 4. The YW notification is current and was submitted on April 12, 2012. 5. Clean loads of leaves can be passively composted in "static piles" which require minimum management. Temperatures should be checked to prevent spontaneous combustion and require turning annually. There should be a separate pile for each year. Composting normally takes from six to twelve months. It is best to collect leaves and other yard waste separately. 6. Large volumes of grass clippings and waste with a low carbon nitrogen ratio will need to be composted as is listed in item 4. 7. Time and Temperature: Yard waste facilities shall follow the time and temperature requirements listed in 15A NCAC 13B .1406(10) for all yard trash feed stocks. The temperature requirements include the compost process being maintained at or above 55 degrees Celsius (131 degrees F) for 3 days and aerated to maintain elevated temperatures. Yard trash is defined within 130A-290(a)(45) as solid waste consisting solely of vegetative matter resulting from landscaping maintenance. Leaves from landscaping maintenance and grass clippings are considered yard trash. 8. Brush and woody waste should be piled separately for future grinding. 9. A gate at the entrance to the facility is provided, but is generally kept open. Lewis indicated during a conversation on January 27th that there are problems with individuals entering the site from other areas. Please contact me if you have any questions or concerns regarding this inspection report. 41- " Phone: 252 459 4502 Email: ben.bames&ncdenr.gov Ben Barnes Environmental Senior Specialist Regional Representative Sent on: February 3, 2012 by X Email Hand delivery US Mail X Certified No. lI Copies: Dennis Shackelford, Eastern District Supervisor Shawn McKee, Compliance Office FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section etal culverts dumped on site Edge of waste YW dumped in area not included in the notification