Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
4116_Guilford_WI_GFL_HighPoint_CDLF_LFG_FID1584692_20210603
[�_ENR USE QNLY. _i i ❑Paper Repert ❑Electronic Data - Email CI) (data loaded, Yes 1 No, _ Dadtwvent #: NC DENR Environmental Monitoring Division of Waste Management - Solid Waste ReDortina Form Notice: This form and any Information attached to it are "Public Records" as defined In NC General Statute 132-1. As such, Ihese documents are available for inspection and examination by any person upon request (NC General Statute 132-6). Instructions: Prepare one form for each individually monitored unit. Please type or print legibly. Attach a notification table with values that attain or exceed NC 2L groundwater standards or NC 2B Surface water Standards, The notification must include a preliminary analysis of the cause and significance of each value. (e.g. naturally occurring, off -site source, pre-existing condition, etc.). « Attach a notification table of any groundwater or surface water values that equal or exceed the reporting limits. • Attach a notification table of any methane gas values that attain or exceed explosive gas levels, This includes any structures on or nearby the facility (NCAC 13B .1629 (4)(s)(i)_ • Send the original signed and sealed form, any tables, and Electronic Data Deliverable to: Compliance Unit, NCDENR-DWM, Solld Waste Section, 1546 Mail Service Center, Raleigh, NC 27699-1646. Solid Waste Monitoring Data Submittal Information Name of entity submitting data (laboratory, consultant, facility owner): Golder Associates NQ Inc. on behalf of High Point C&D Landfill Contact for questions about data formatting. Include data preparer's name, telephone number and E-mail address: Name: Darren Cox Eymail. decox@goider.com Phone: 336-852-4903 NC Landfill Rule: Actual sampling dates Facility name: Facility Address: Facility Permit # (.0500 or .1600) October 20-24, 2006) High Point C$D Landfill 5830 Riverdale Drive 41 16 500 May 26, 2021 and June 2, Jamestown, NC 27282 2021 Environmental Status: (Check all that apply) InitiallRackground Monitoring Q Dsteciion Monitoring ❑ Assessment Monitoring ❑ Corrective Action of data submitted, (Check all that apply) Groundwater monitoring data from monitoring wells 0 Methane gas monitoring data Groundwater monitoring data from private water supply wells Corrective action data (specify) Leachale monitoring data ❑ Surface water monitoring data Other(specify) Notification attached? No_ No groundwater or surface water standards were exceeded. Yes, a notification of values exceeding a groundwater or surface water standard Is attached. It includes a list of groundwater and surface water monitoring points, dates, analytical values, NC 2L groundwater Standard, NC 28 Surface water standard or NC 801id Waste GWPS and preliminary analysis of the cause and significance of any Conrentratlon. Yes, a notification of values exceeding an explosive methane gas limit is attached. It includes the methane monitoring points, dates, sample values and explosive methane gas limits. Gertificatiort To the best of my knowledge, the Information reported and statements made an this data submittal and attachments are true and correct. Furthermore, I have attached complete notification of any sampling values meeting or exceeding groundwater standards or explosive gag levels, and a preliminary analysis of the cause and slgnlficance of concentrations exceeding groundwater standards, I am aware that there are significant penalties for making any false statement, representation, or certification Including the possibility of a fine and impri$onment. Rachel P, Kirkman, PG Principal and Senior Consultant 336-852-4903 Facility lk resentative Name (Print) Title (Area Code) Telephone Number 612/2021 Affix NC Licensed& Professional Geologist Seal Signature Dale to Golder Associates NC, Inc., 56 Oak Branch Drive, Greensboro, NC 27407 Facility Representative Address PE C-2862: PG C-399 NC PE Firm License Number (if applicable effective May 1, 2009) Revised 6/2009 �- P, GOLDER MEMBER OF WSP June 2, 2021 Project No. 2013788121.202 Jaclynne Drummond, Hydrogeologist North Carolina Department of Environmental Quality, Division of Waste Management - Solid Waste Section 2090 US Highway 70 Swannanoa, NC 28778 METHANE MONITORING RESULTS AND NOTIFICATION OF EXCEEDANCE— SECOND QUARTERLY EVENT FOR 2021 WASTE INDUSTRIES OF HIGH POINT CONSTRUCTION AND DEMOLITION LANDFILL AND RECLAMATION FACILITY, PERMIT NO. 41-16 Dear Jaclynne, Attached are the results from the May 26, 2021, quarterly methane monitoring at the above -referenced facility for your files. As shown on the attached Landfill Gas Monitoring Data Form, methane was detected in compliance monitoring point LFG-2A above the lower explosive limit (LEL) during the second quarterly methane monitoring event. A verification event was conducted on June 2, 2021 and confirmed the initial LEL exceedance at LFG-2A. This letter serves as a notification to the Department as required under 15A NCAC 13B .0544(d)(3)(A). A Landfill Gas Remediation Plan will be submitted within 60 days per 15A NCAC 13B .0544(d)(3)(C). Based on the close proximity of a surface water feature and the fact that no structures are present in the area, no other actions are warranted at this time. If you have any questions or concerns, please contact us at 336 852-4903. Sincerely, Golder Associates NC, Inc. Darren Cox Staff Environmental Scientist Golder Associates NC, Inc. 5B Oak Branch Drive, Greensboro, North Carolina, USA 27407 Rachel P. Kirkman, PG Principal and Senior Consultant Engineering Lic. No. C-2862/Geology Lic. No. C-399 Golder Associates NC, Inc. is a licensed user of the Golder trademark, and an associated operating entity. Golder and the G logo are trademarks of Golder Associates Corporation. T: +1 336 852-4903 F: +1 336 852-4904 goider.com Jaclynne Drummond, Hydrogeologist North Carolina Department of Environmental Quality, Division of Waste Management - Solid Waste Section Project No. 2013788121.202 CC: Seth Heath, General Manager,5830 Riverdale Drive, Jamestown, NC 27282, seth.heath@gflenv.com, 336-886-3560 June 2. 2021 Bryan Wuester, Regional Landfill Manager, GFL Environmental, 7434 Roseboro Highway, NC 28382, bryan.wuester@gflenv.com (Electronic Copy) Joseph Santangelo, Regional Environmental Compliance Manager, GFL Environmental Inc., 1192 McClellandtown Road, McClellandtown, PA, 15458, joseph.santangelo@gflenv.com. (Electronic Copy) Travis Hitchcock, Region Vice President, GFL Envrionmental, 3301 Benson Drive, Suite 601, Raleigh, NC, 27609, travis.hitchcock@gflenv.com. (Electronic Copy) Attachments: Boundary Gas Probe Monitoring Log — May 26, 2021 Boundary Gas Probe Monitoring Log (Verification) — June 2, 2021 Site Location Map Calibration Forms GDL�ER NC Division of Waste Management - Solid Waste Section Landfill Gas Monitoring Data Form Notice: 71hisf&on andatty Information attached to it are "Pliblic ReroIxis"as dCjlned in NC General Stalute 131-1_ As such. these documenls are arailablejar inspection and examinadon 1;r aqv person eopon request (NC General Stanom 132-6). Facility Name: Waste Industries of High Point C&D Landfill Permit Number: 41-16 Sampling Date: 05/261202 1 Landfill Rule (.0500 or.1b40): .0500 Sample Collector Name & Position: Nicolas Te}eda-Torres, Geologist Gas Meter Type & Serial Number: GEM 5000 Gas Meter Calibration Date: 02/12/2021 Field Calibration pate & Time: 05/26/2021; 11:30 Field Calibration Gas Type (15115 or35150); 15115 Field Calibration Gas Canister Expiration Date: 9/25/2024 Gas Meter Pump Kate: 300 cc/min Ambient Air femperatLire: 856E Barometric Pressure (in. or min 1.1g); 29,15" Weather Conditions; Fair. winds W5W 9mph Instructions; Under "Location or LFG Well", list monitoring well 0 or describe monitoring location (e.g., inside field office). Attach a test location map or drawing. Report methane readings as both % LEL and % CH4 by volume. Convert °a CH4 (btj volume) to r LEL as follows: % methane (by volume)120 = % LEL. *Hydrogen Sulfide (H2S) gas monitotzng nlav he required for Construction & Lknaolition Landfills (CDLFs). See individual permit conditions and/or Facility LFG monitoring plan. Larauanur LFG Well [i} Sample Tube Purge Time uY Day. Time Pumped P (see) Initial n /a LEL Stabilized % LEL %C114 (voluma) o In {]2 (votun►e) a /a CO2 (volume) de ! H25 (volume} NQ.1'ES Scalehouse 1219 90 0.0 0.0 0.0 20.4 0.0 0.0 Break Roam 12:27 90 0.0 0.0 0.0 20.2 0.0 0.0 Maintenance 12:24 90 0.0 0.0 0.0 20.2 0.0 0.0 LFG-1 12:43 90 0.0 0.0 0.0 19.4 0.1 0.0 LFG-2A 12:34 90 668 668 33.4 8.7 21.6 3.0 Retested on 6/02/2021 LFG-3 13:54 90 0.0 0.0 0.0 20.1 0.0 0.0 LFG-4 13:46 90 0.0 0.0 0.0 19.9 0.0 0.0 LFG-5 14:00 90 0.0 0.0 0.0 17.1 2.5 0.0 MW-1 13,49 90 0.0 0.0 0.0 20.0 0.0 0.0 MW-2 12.55 90 1 0.0 0.0 0.0 19.3 0,0 0.0 MW-3 13:06 90 0.0 0.0 0.0 18,7 11 0.0 MW-4S 13,12 90 0.0 0.0 0.0 19.4 0.0 0.0 NOM', Tfneeded. attach additional slatejawns to Include additional LPGmoniioring data locations,lor NreJacilfty ACTION LEVELS: Methane: >1.25% by volume (inside structures) AND >5% by volume (at facility boundary) Hydrogen Sulfida: }1 % by volume (inside structures) AND n4% by volume (at racility boundary) Certification To the best of my knowledge, the information reported and statements made on this data submittal and attachments are true and correct. l am aware that there are significant penalties for making any false statement, representation, jrcertification including the possibility of a fine and imprisonment. fi P�tca��; Geologist 'IGN AT6 RE TITLE Revised - March 6, 2037 NC Division of Waste Management - Solid Waste Section Landfill Gas Monitoring Data Form Notice. Thisfbrm and any fr{%o+'+rrarion ottaeked !a it are "ljrbllc Recerds"as defined in NC General Statrue 132-1. As such, these dacr+menis are mailable/or inspection and exantF+rr+llon by eay person upon req+wsr {NC Gene,-a1.Ral+ue 132.6), Facility Name: Waste Industries of High faint C&D Landfill Perm itNutnber: 41-16 Sampling Dale; 05/26/2021 NC Landfill Rule (.0500 or,1600): '0500 Sample Collector Name & Position: Nicolas Tejeda-Torres, Geologist Gas Meter Type & Serial Number: GEM 5000 Gas Meter Calibration Date: 02/12/2021 Field Calibration Date & Time: 05/26/2021; 11:30 Field Calibration Gas Type (I 5/]Slur 35/50 Gas Meter Pump Gate: 300 cc/min 15/15 Field Calibration Gas Canister Expiration Date: 9/25/2024 Ambient Air Temperature: 850 F Barometric pressure (in. air mm I1g): 29.15" Weatlier Conditions: Fair, winds WSW 9mph Instructions: Under "Location or LFG Welt", Iist monitoring well # or describe monitoring location (e.g., inside field office). Attach a test location snap or drawing. Report methane readings as both % LEL and % CH4 by volume. Convert % CNa (by volts me) to % LEL as follows: % methane (by volunte)/20 = % LEL. *Ffydrogeir Snyl-rJe (NaS) gas monlioring niuy be required far Construction & Demolition Landfills (MM), See iudividualpermit conditions andlor Facility LFG monitoring plait. Location or t.rr.; well In Sample Tube Purge Time of Day Time Pum d p� {sec) Initial o �a LEL Stabilized % i.E. %Clint fvplume) e /a UI (volume) 9'o COI #volume} n + to Fi25 (volume) NOTES MW-5 13:24 90 0.0 0.0 0.0 19.7 0.0 0.0 MW-5 13:21 90 0.0 0.0 0.0 19.5 0.5 0.0 MW-75 13:30 90 0.0 0.0 0.0 19.7 0.0 0.0 MW-8 1 12:52 90 0.0 0.0 0.0 19.0 0.5 0.0 AMW-1 12:59 90 0.0 0.0 0.0 19.9 0.0 0.0 AMW-2 13:18 90 0.0 0.0 0.0 19.7 0.0 0.0 LFG-2 13:39 90 0.0 0.0 0.0 17.5 3.7 0.0 NOTE: ]('needed. aaach additional data forms to inch+de additional LPG monitoring data location far the fircilitr. AC't'lON LEVELS: Methane: >1.25% by volume (inside structures) AND >5% by volume (a( facility boundary) Hydrogen Sulfide: >1 % by volume (inside structures) AN0 2:4% by volume (at facility boundary) Certification To the best of my knowledge, the information reported and statements made on this data submittal and attachments are true and correct. 1 am aware that there are significant penalties for making any false statement, representation, certification intlttdittg the possibility of a fine and imprisonment. rot.-Wicat_ps T�3iw Geologist _ SIGNATURE TITLE Revised -March 6, 2017 NC Division of Waste Management - Solid Waste Section Landfill Gas Moaitoriiag data Form Notice: This lean and rrn; tnlormarton crrracherl to It are 'Public Records" as dined in NC C,etreral Slalwe 132-1. As stech. drew documents fire ar ailablefar inspection arul examination by anv persrur upon request (NC General Slarute 132-6) Facility Name: Waste Industries of High Point C&I] Landfill Permit Number: 4 166 Sampling Date; 6/2l20L1 NC Landfill Rule (.0500 or.1G00): Sample Collector Name & Position: .0500 Darren Cox, Environmental Scientist Gas Meter Type & Serial Number: GEM 5000 Gas Meter Calibration Date: 02/12/2021 Field Calibration Date & Time: 06/212021 1 1 :30 Field Calibration Gas Type (15115 or3515U): 15/15 Field Calibration Gas Canister Expiration Date: 8/30/2022 Gas Meter Pump Rate: 300 cc/min S O F 29.1 7rr Pertly Cloudy. winds SE 7mph Ambient Air Temperature: Barometric Pressure (in. or mm Hg): Weather Conditions:. , Instructions: Under "Location or LFG Well", list monitoring well # or describe monitoring location (e.g., inside field office). Attach a test location map or drawing. Report methane readings as both % LEL and % CHa by volume. Convert %CHd (bv volume) to %LEL as follows: % methane (by volume)120 = %LEL. *Hydrogen Sulfide (H2S) gas monitoring may be reelteired for Consrruction & Derrtolitiwt Lrntrlfills (CDLFs). See individual permit cordilians and/or Facility LFG monitoring plan. Locah.on or LFG well Ill $8mple t be Iruree Time or C]ay Tine Punned (sec) Initial OK LEL 51tabihzcd !ti LEL % C 114 (Vulmnc) % 02 (volume) % CO2 (volume) % H250 (volumt) NO'tGS LFG-2A 12:04 90 466 466 23.3 12.5 15.1 0.0 Verification LFG-2 12:06 90 0.0 0.0 0A 17.3 3.8 0.0 NOTE: lfrreeded. anach additional data jorms to include additional LEG monitoring data locations J& ibe fbodiny. ACTION LEVELS: Methane: }1.25% by volume (inside structures) AND A>_5% by volume (al facility boundary') Hydrogen Sulti�ie_ >1 % by voluaw Onside structures) AND 2:41% by, Volume (at ta6lily boundary) Certification To the best of nay knowledge, the information reported and statements made on this data submittal and attachments are true and correct. I am aware that there are significant penalties for making any false statement, representation, certification including the passibility of a tine and imprisonment. Environmental Scientist iGNAI URE TITLE Revised — March 6, 2017 01 0 U LL J m Z m z 0 v 0 a g 3 0 Q E t7 Y 0 U o_ gn r � o ❑� r FACILITY PROP BOU DARY l LF - LFG-2A (APPROXIMATE LOCATION)' ;I •795.1 � 801.3 794. 603 J 805 4 I 810.5 810 - I RECLAM ON _ g20 I FACILITY B� ^� I M W 1 1 810.5 '810J AR - �Q09.6 ❑ •7 95.5 A809.6 g10 808.8 'p,\ / �� ^ 08 // 0 0� � :8.3 r � ® •810.4 10.2 � 809.9 � ., \ � 98 • 85. 3.1 803.3 75 H S 7.3 I //11) ///�/ 780 78; // / • 861.5 800 Fol w �4� MAPP NG LIM S. 790 -799. ❑ 780 ,70 799. I BRA a� �3� I 7� \ 06L 3.6 �� I 772.5 M I I D I NG C • €� 17 / I 71.1 819.9 ]68.4 � 9l7yJS / I 100 I I „o 009 0772.4 Po 780.3/I �/i'y791.3\\\ 796 96.9 778.3 ^^o 780.8 790 0 0777.2 83.9 • 800.9 O \•, 0778.8 ^ J 776.3 r .leg o ]65.6 WE752. © :09.6 4.9 790 7\ \ 750 ,1cQ / 7 4 �130 ^� U O \ \ WE 738.3' 44.5 SIB 3 749.8 751.1 W WE 738.3 \ / \ .74 I i1 44.3 /\ 750 I � •720.2 18. - 0 \ NE I '0o ° w p� \ CLIENT 17 I WASTE INDUSTRIES USA, INC. Q.♦ CONSULTANT YYYY-M M-D D 2021-05-26 09' PREPARED KL DESIGN DYR G 0 L D E R J / \ GOLDER ASSOCIATES NC, INC. 1 / ! 00 PG C-399 APPROVED RPK LEGEND SITE LOCATION MAP EXISTING 10' CONTOURS EXISTING 2' CONTOURS PROPERTY LINE STREAM TREELINE EXISTING ROAD - - - - - PROPOSED OR EXISTING LIMITS OF WASTE - MW-3 MONITORING WELL LOCATION ❑SW-1 SURFACE WATER MONITORING POINT LFG-1 LANDFILL GAS MONITORING WELL LOCATIONS ABM-1 BENCH MARK SB-1 SEDIMENT BASIN NOTES 1. TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET 2. DRAWING BASED ON SITE PLAN PLAN PREPARED BY JOYCE ENGINEERING, INC DATED JULY 7, 2004. c 3. UPDATED TOPOGRAPHY PROVIDED FROM AERIAL SURVEY PREPARED BY GEODATA CORP DIGITAL MAPPING SERVICES, PHOTOGRAPHY DATE JANUARY 6, 2018 AND JANUARY 18, 2019. 0 200 400 SCALE FEET PROJECT WASTE INDUSTRIES OF HIGH POINT CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL AND RECLAMATION FACILITY GUILFORD COUNTY, NORTH CAROLINA TITLE METHANE MONITORING LOCATION MAP PROJECT No. PHASE Rev. 2013788121 1 DRAWING 1 0 EI SRUSTI D PROVEN quAD IV CERTIFICATE OF CONFORMANCE Issued BY: QED Environmental Systems Inc. Services Facility Date of Calibration: 2021-02-12 Certificate Number: 01-10596 21RA-45868 20210212 01.pdf Customer Name; EON PRODUCTS INC 3230 INDUSTRIAL WAY SW SNELLVILLE, GA 30039 Us Description, Temp Probe Model: 51CTP Serial Number: 01-10596 Test Criteria: ±5°F @ 40OF Temperature Reading Recoded At: 40,3°F Test Criteria: :L5°F @ 160-F Temperature Reading Recoded At: 160.7°F Test Criteria: ±5°F @ 212OF Temperature Reading Recoded At: 212.6°F Calibration Pass'. Reported readings are within the manufacturer's specifications. Dan McCarty service@gedenv.com http://www.gedenv.com QED Environmental Systems, Inc. 800-624-2026 / 734-995-2547 x 575 / Fax 734-995-1170 QED Environmental Systems Inc. 8006242026 2355 Bishop Circle Wes( Dexter, MI 48130,USA � WWWQEDENVCOM 4b 734.995.2547 Instrument: Landtec MOdel : GEM 5000 - Serial# : C).W Calibration Standards Standard. 3 %-cot Lot# . *-40W?17` -+ Response: 3` -S Standard: 50% GH4 Lot#: Response: 41? •j• �. Standard: _--- Lot#: Response: Standard: Lot#: Response: - -- Service Performed By: _ f�r'r', + L - . _ Date: 51it /mot Units performs within specifications: X Flow OK: x Battery OK: K Temperature: Comments: " Relative Humidity: r The callbratlon results published in this certificate were ebtalned using equipment capable of producing results that are traceable through NEST to the international System of Units (51). Certificat+on only applies to results shown. This certificate may not be reproduced other than in full, except with the prior written approval of the issuing laboratory. RO. Sox 443. Snellviller Georgia 30078-0443 800-474-2490 770-978-9971 Fax: 770-978-8661