Loading...
HomeMy WebLinkAbout6403-LCID_INSP_20210429NORTH CAR()LINAD_E Q�� OepaNnent of Envieanmenbl [Nel� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID X YW Transfer Compost SLAS COUNTY: Nash MSWLF I PERMIT NO.: 6403-LCID-2020 Closed HHW white Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: April 29, 2021 FACILITY NAME AND ADDRESS: Nash County LCID Landfill SR 1425 3057 Duke Rd. Nashville, NC 27856 Date of Last Inspection: March 24, 2021 GPS COORDINATES: N: 36.052542° E:-78.001889' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Ben Barnes and Matthew Richardson Telephone: 252-459-9823, 252-459-9899 (Barnes cell 252-904-3396) Email address: solidwasteknashcountync.gov; Matthew.Richardson&nashcountync.gov FACILITY CONTACT ADDRESS: Nash County Solid Waste P.O. Box 849 Nashville, NC 27856 PARTICIPANTS: Amanda Thompson, NCDEQ Solid Waste Drew Hammonds, NCDEQ Solid Waste Thad Valentine, NCDEQ Division of Energy, Mineral, and Land Resources (DEMLR) Lauren Garcia, NCDEQ DEMLR Ben Barnes, Nash County Solid Waste Craig Fortner, Garett & Moore STATUS OF PERMIT: 6403-LCID-2020: Permit to Construct and Permit to Operate was issued July 13, 2020, and the Permit to Operate will expire on July 13, 2025. PURPOSE OF SITE VISIT: Pre -operation Inspection. STATUS OF PAST VIOLATIONS None. OBSERVED VIOLATIONS None. Pagel of 3 NORTH CAR()LINAD_E Q�� OepaNnent W Envimnmenbl W.I� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS: The purpose of this inspection was to complete the required pre -operation inspection, prior to accepting waste at the newly constructed LCID. 1. The sediment basin to the northeast of Phase I of the LCID has been constructed. Three porous fabric baffles run the length of the sediment basin. The sediment basin also consists of a skimmer, concrete riser, and an emergency spillway. Vegetation has begun to grow on the side slopes of the sediment basin. Measures to monitor and maintain the basin should be put into place and followed. 2. Riprap has been placed on the downstream side of the outfall. During this inspection, the surrounding silt fence had fallen away from the outfall. Erosion was noted within the sediment basin berm, adjacent to the outfall. The silt fence and erosion need to be monitored and repaired as needed to prevent off -site erosion. 3. One area of riprap was identified within the ditch, at the sediment basin inlet pipe. Monitor the drainage ditch to determine if additional riprap areas are needed to prevent erosion in the drainage ditch. 4. Vegetation was still located within the Phase I LCID cell. The vegetation within the Phase I LCID cell will need to be either scraped off or mown with a brush hog prior to the placement of waste within the LCID. Deep root penetrating vegetation should be removed. 5. Areas where there may be standing water should be graded to provide positive drainage away from the waste and working face. 6. The roadway to the Phase I LCID cell has been completed to the turnaround at the end of the Phase I LCID cell. It is recommended that the roadway be completed around the entire LCID, as per approved plans, to help with the flow of traffic. 7. Once the LCID is operational, an operator shall be on duty at all times while the LCIDLF is open for public use to direct patrons, monitor and remove unacceptable waste, and compact/cover the waste (15A NCAC 13B .0566 (6)). 8. Digital photographs were taken during the inspection. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Amanda Thompson Amanda Thompson Date: 2021.05.20 08:12:52-04'00' Amanda Thompson Environmental Senior Specialist Regional Representative Phone: 910) 433-3353 Sent on: May 20, 2021 X Email Hand delivery US Mail Certified No. Copies: Andrew Hammonds, Eastern District Supervisor — Solid Waste Section Donna Wilson, Engineer — Solid Waste Section Page 2 of 3 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA o"-t0E'"�m"""°"""' Solid Waste Section Photographs taken by Amanda Thompson on April 29, 2021. Erosion around the silt fence near the sediment basin outfall. View of the sediment basin. Vegetation within the Phase I LCID cell. Page 3 of 3