Hello Nathan and Nelson,
I've reviewed parts of the PTC application submitted for the Phase 5 expansion, as it relates to the application for site
suitability. Earlier comments are in the attached email, and more specific comments are below.
Please provide a Site suitability report that addresses the following:
1. Discussion of the requirements of 15A NCAC 13B .1618.
The regional characterization study map and the local characterization map, and a text discussion of the maps
for the items listed in 15A NCAC 13B .1618 (c) (1) and (2).
Address compliance with the location restrictions listed in 15A NCAC 13B .1622, which are airport safety,
floodplains, wetlands, fault areas, seismic impact zones, unstable areas, cultural resources, state nature and
historic preserves, water supply watersheds, endangered species. A few specific comments:
a. Cultural resources - the original reports and correspondence have been located and are on laserfiche,
two files dated 1-1-1998 and 1-30-1996. The original report investigation included the expansion
area. Provide a summary discussion of the original investigation as it relates to the expansion area. I did
a file search and review of this information, for the expansion, and my comments are in a file dated 3-
30-2020. Files can be found here.
b. Floodplains - the landfill waste boundary should be drawn onto the map. Also the map should have a
key relating to the floodplain areas, identifying which areas are in the 100 floodplain.
4. Please provide the finalized wetlands permit. We have the March 5, 2020 pre -final authorization, that was not
yet signed.
5. A traffic study for the expansion, in accordance with NCGS 13A-195.5. A letter or email from a DOT is Division
Engineer for the traffic study, that the site expansion will not have a substantial impact on highway traffic.
6. The EA report:
a. The acreage is inconsistent with the information we have for the facility. The facility property should be
stated as 875.7 acres, instead of 1100 acres. You can also say that Chambers owns additional property
surrounding the landfill property, for a total of x acres.
b. The tons accepted per day and year should be updated.
c. EA - Hours listed for site operation are not consistent with approved plan.
d. Include the traffic study information and letter from the DOT Division Engineer.
e. Discussion of wetland impacts and endangered species, and attachments, and references to figures,
should be updated regarding the more recent correspondence and permitting, of 2019 and 2020.
If you have any questions, please let me know.
Donna
Donna J_ Wilson
t�:�-DEQ7>
1.1'�
Engineering Project iWanager, Solid Waste Section
Divis2on of, Maste -Management
North Carolina D epartment of Environmental Quality
919.707.8255 (Office)
Donna_ ilson,c derv_go
Physical Address: 217 Nest Jones Street, Raleigh NC 27603
Mail- z address: 1646 Mail entice Center, Raleigh NC 27 99
corresporxience le art} from fhs aduiuis is subMI fo the l oWi Cafcwu FUbfc Fkcods Law afvJ
mw be dose to ford pWea
Wilson, Donna J
From: Wilson, Donna J
Sent: Tuesday, September 3, 2019 2:40 PM
To: Bivins, Nathan; Nelson Breeden
Cc: Stanley, Sherri; Sugg, William P
Subject: Anson Landfill, 0403-MSWLF-2010, Phase 5 expansion
Nathan and Nelson,
The Solid Waste Section has completed a preliminary review of the Permit to Construct application for the Phase 5
expansion.
The Solid Waste Section disagrees with the statement that the expansion does not meet the definition of a "new
facility." In accordance with .1603 13B .1603 (a) (1) (B), the expansion is a new facility because it will "expand the
MSWLF unit boundary approved in accordance with subparagraph (a)(1) of Rule .1618." Rule .1618 (a)(1) refers to the
site suitability previously approved. The site suitability previously approved did not include the expansion area now
proposed as part of the waste boundary.
A Site Suitability application is needed for the lateral expansion. Parts of the previous site suitability application may be
used again, and that documentation will need to be submitted with the expansion application submittal. However,
some of the siting criteria will have to be updated, for criteria that can change over time, for example, distance to
airports, distance to residences, streams, wells, etc.
It is noted that the Phase 5 PTC application included an updated wetlands study and endangered species study. For the
wetlands study, provide the US Army Corps of Engineers response to the wetlands study and request for jurisdictional
determination. For the endangered species study, a letter from the NC Department of Cultural Resources is needed that
concurs with the findings of the onsite endangered species study, dated August 2016, that the proposed landfill
expansion will not jeopardize the continued existence of endangered or threatened species or result in the destruction
or adverse modification of a critical habitat, protected under the Federal Endangered Species Act of 1973.
The following are the requirements of a Site Study. Refer to 15A NCAC 13B .1618 for details of items 1 through 6
- http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20gualitV/chapter%2013%20-
%20solid%20waste%20management/subchapter%20b/15a%20ncac%2013b%20.1618.pdf
1. Local government approval
2. Facility plan, conceptual plan with drawings
3. Regional characterization study
4. Local characterization study
5. Site hydrogeologic report (Perry Sugg is the contact for this part of the submittal)
6. Location restrictions
7. Traffic study. A letter must be submitted from the NC Division Engineer, Department of Transportation, that
states that, the proposed facility will not have a substantial impact on highway traffic, in accordance with NCGS
130A-295.5 (a) and (b).
8. SEPA, in accordance with 130A-295.6 (a)
The site suitability application is a separate document from the Permit to Construct application for Phase 5. The site
suitability will have to be approved before the Permit to Construct application can proceed.
If you have questions or comments, please let me know.
Donna
Donna J_ Wilson
Engineering Project jl anager, Solid Waste .Section
Division of Waste zVanagoment
North CarolinaDepartment of En-,ironmental Quality
919.707.8255 Office)
Donna_W son, xcdenr_p!
Phv-sical Address: 2.17 West Jones Street, Raleigh SIC 27603
Mail' g address: 1 4 Mail entice Center, Rale- h ICI 7699 rk-
673ai careWcrdY)ce lc ad from ttvs addr s,s subject to Me Abli Cara Aubkc FL -cords, Law afYJ
Trey be cisdosW to IW pWea