FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
X
I LCID
YW
Transfer
SLAS
COUNTY: Davidson
MSWLF
PERMIT NO.: 2906-MSWLF-2008
Closed
HHW
White
X
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
Tire T&P/
X
Tire
Industrial
DEMO
sDTF
Collection
Monofill
Landfill
Date of Site Inspection: April 22, 2021 Date of Last Inspection: March 11, 2021
FACILITY NAME AND ADDRESS:
Davidson County Integrated Solid Waste Management Facility
220 Davidson County Landfill Road
Lexington, NC 27292
GPS COORDINATES (decimal degrees): Lat: 35.85281' Long:-80.17620'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Charlie Brushwood
Telephone: 336-240-0303
Email address: charlie.brushwood@davidsoncoun . nc.gov
FACILITY CONTACT ADDRESS:
P. O. Box 1067
Lexington, NC 27293-1067
PARTICIPANTS:
Charlie Brushwood, Solid Waste Director — Davidson County Integrated Solid Waste
Tim Phelps, Landfill Supervisor — Davidson County Integrated Solid Waste Management
Susan Heim, Environmental Senior Specialist — Solid Waste Section
STATUS OF PERMIT:
2906-MSWLF-1994: Closed
2906-MSWLF-2008: Life of Site Permit Issued 03/12/2018; Expires 12/8/2068.
2906-HHW: Issued 03/12/2018; Expires 05/28/2023.
PURPOSE OF SITE VISIT:
Pre -operational Inspection — Phase 2 Cell 3
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
Page 1 of 5
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
NORTH CAROLINA
Solid Waste Section
ADDITIONAL COMMENTS:
1. This inspection was conducted to determine that the new Phase 2, Area 3, Cell 2 is ready to accept waste.
2. Photos included in this report were taken by Susan Heim on April 22, 2021 unless otherwise noted.
3. Facility access roadways were observed to be well -maintained.
4. Some ponding water was visible near the southern end of the new cell; however, the amount of water observed
was considerably less than that found during the previous inspection on March 11, 2021.
5. Windblown litter that had been noted in Cell 2 during the previous inspection had been collected and disposed
of properly. Windblown litter appeared to be well managed during this inspection, and litter collection was
taking place on the southeast side slope of the active landfill, which will serve as the tie-in slope, connecting the
new Cell 2 to the remainder of the active landfill.
6. The interior and exterior slopes of the new cell were found to be in good condition, with vegetative cover still in
place. The exception was the tie-in slope, where recurring heavy rain events had washed away portions of the
vegetative cover, and the stormwater flow had created large erosion rills leading downhill toward the new cell.
Several of these erosion rills had exposed waste, mainly in the vicinity of the two parallel rows of silt fence that
had been installed above the toe of the slope. However, the fencing still appeared to be intact and functioning
properly, blocking the sediment from reaching Cell 2.
7. Repairs were observed to be underway on the tie-in slope during the inspection. Clean soil cover had been
applied to the upper third, and trucks were observed staging soil piles along the top of the slope sufficient to
complete the remaining repairs in advance of seeding. Mr. Phelps provided photos of the tie-in slope following
the inspection to confirm that the repairs had been finished as planned. Additional grading work will continue to
prepare the slope for seeding.
8. Mr. Brushwood stated that plans were in the works for pumping out the remaining water from the bottom of the
new cell.
9. Please notify the Solid Waste Section prior to moving operations to the new Cell 2.
10. Ensure that the initial lift is composed of a fluff layer to afford some protection for the liner before other waste
is disposed of in the new cell.
11. Ensure that the pneumatic plug is removed prior to accepting waste in the new cell so that leachate can flow to
the sump as designed.
A view of the new Cell 2 from
the northern end. Some
ponding water can be seen
near the southern end of the
cell.
Page 2 of 5
NORTH CAROLINAD_E Q��
OepeNnenf of Envlronmmbl 0w1�
A view of the new Cell 2 from
the southern end includes the
leachate plug, gravel column,
and the remaining ponding
water.
Erosion rills containing
exposed waste can be seen on
an area of the tie-in slope. The
white material below the silt
fencing is the temporary plastic
cover placed over the exposed
waste during the new cell
construction.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The southern
end of the new
cell has well -
established
vegetative
cover, and the
interior slopes
in this area
remained
intact through
the rain events.
Page 3 of 5
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
NORTH CAROLINA
Solid Waste Section
Erosion rills had
been repaired and
all exposed waste `n" .�
covered on the tie-in s_s.
slope. (Photo _*
provided by Timm.._
Phelps, Davidson -
Co., following the -
inspection.) +"
Repairs were less
extensive at the
southern end of the
tie-in slope (left).
(Photo provided by
Tim Phelps,
Davidson Co.,
following the
inspection.)
Another view of the
tie-in slope after
repairs. Note the
working face and
soil stockpile at
right. (Photo
provided by Tim
Phelps, Davidson
Co., following the
inspection)
Page 4 of 5
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
NORTH CAROLINA
Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Susan
Heim
Susan Heim, l Solid Waste Section, ou=Field Operations Branch,
email=susan.heim@ncdenr.g
ov, c=US
Date: 2021.05.04 12:38:22
-04'00'
Phone: 336-776-9672
Susan Heim
Environmental Senior Specialist
Regional Representative
Sent on: May 4, 2021 to
X
Email
Hand delivery
US Mail
Certified No. [ ]
Charlie Brushwood, Davidson
Co.
Copies: Deb Aja, Western District Supervisor — Solid Waste Section
Ming-Tai Chao, Permitting Engineer — Solid Waste Section
Steven Sink — Davidson County Integrated Solid Waste Management
Tim Phelps — Davidson County Integrated Solid Waste Management
Page 5 of 5