Loading...
HomeMy WebLinkAbout4101_Guilford_HighPoint_Seaboard_MSWLF_RemedialProgressReport_FID1529840_20210215SEABOARD GROUP II AND THE CITY OF HIGH POINT February 15, 2021 Eric B. Aufderhaar, P.G., Environmental Program Consultant North Carolina Department of Environmental Quality Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Re: Remedial Action Progress Report, 2020 Fourth Quarter Former Seaboard Chemical and Riverdale Drive Landfill Site Jamestown, Guilford County, North Carolina Dear Mr. Aufderhaar: The Seaboard Group II and the City of High Point are providing this 2020 Fourth Quarter Remedial Action Progress Report for the former Seaboard Chemical Corporation facility and the closed Riverdale Drive Landfill located in Jamestown, NC. During the fourth quarter of 2020 the mechanical and phytoremediation treatment systems processed 4,159,898 gallons of extracted groundwater and leachate. Also during the fourth quarter of 2020 the following shutdown exceeding one day in duration occurred: Date Duration Reason for Shutdown October 18, 2020 1.3 days Automatic, high voltage October 29, 2020 1.1 days Automatic, power failure Hurricane Zeta November 7, 2020 1.7 days Automatic, bad sensor in lime tank December 13, 2020 1.5 days Automatic, VFD failure, part replaced December 25, 2020 3.0 days Automatic, low level T-121 — PID loop error No extended shutdowns occurred during the fourth quarter of 2020 due to system operations. The attached figures provide the results of the full scale operation of the treatment system during the fourth quarter of 2020, including: Operating Data, Process Flow Data, Static Water Level Data, System Chemistry, Utility Use Data, and Contaminant Removal Efficiency. Please contact Mr. Gary D. Babb, P.G. (919/605-4719) or Craig Coslett (610/435-1151) if there are any questions or comments. Please direct correspondence related to this matter to: Mr. Craig Coslett de maximis, inc. 1550 Pond Road, Suite 120 Allentown, PA 18104 Communications via electronic mail should be directed to gdbabb@gmail.com and ccoslett@demaximis. com. Respectfully, Seaboard Group II and City of High Point -"'I '4�7 za-- Gary D. Babb, P.G. Babb & Associates, P.A. cc: Dave Nutt, Esq. - Seaboard Trustee Jim Schenker, Technical Committee Oversight Craig Coslett - Project Oversight Coordinator Terry Houk - City of High Point Trustee Amos Dawson, Seaboard Group II Counsel Hayes Finley, City of High Point Counsel Jackie Drummond - NCDEQ Division of Solid Waste SEABOARD GROUP II & THE CITY OF HIGH POINT Quarterly Units of QUARTERLY LOG -Q42020 INITIAL WEEK WEEK WEEK WEEK4 WEEKS WEEK WEEK WEEK WEEK WEEK 10 WEEK 11 WEEK 12 WEEK 13 Totals Measure METER READING LEACHATE (GALLONS) 5,630,146 5,754,888 5,876,097 6,005,811 6,130,419 6,243,393 6,350,049 6,504,215 6,672,000 6,861,229 6,968,117 7,096,065 7,292,300 7,401,221 1,771,075 GALLONS LSl-RWs (GALLONS) 5,474,863 5,538,895 5,607,203 5,672,914 5,734,248 5,753,857 5,812,379 5,881,689 5,964,977 6,058,129 6,107,391 6,171,752 6,251,043 6,298,999 824,136 GALLONS PWDR1(GALLONS) 6,834,783 6,944,138 7,048,906 7,150,935 7,245,935 7,347,086 7,432,096 7,536,348 7,649,066 7,776,644 7,845,326 7,936,393 8,043,867 8,112,008 1,277,225 GALLONS SIS-RWs(GALLONS) 2,442,670 2,468,142 2,489,912 2,515,520 2,538,120 2,550,134 2,570,686 2,597,733 2,628,716 2,662,776 2,681,991 2,707,829 2,740,576 2,760,906 318,236 GALLONS PHYTO DISCH. (GALLONS) 1,086,370 1,412,143 1,725,107 2,043,119 2,345,390 2,592,586 2,870,387 3,230,851 3,624,336 4,062,686 4,298,770 4,605,367 5,010,331 5,246,268 4,159,898 GALLONS AIR STRIP. RUNTIME (HRS) 7,743 7,893 8,040 8,178 8,305 8,443 8,562 8,702 8,869 9,061 9,166 9,304 9,466 9,572 1829 (83.7%) HOURS LSl COMP RUN (HOURS) 11,570 11,720 11,870 12,010 12,130 12,270 12,390 12,530 12,700 12,900 13,000 13,140 13,300 13,400 1,830 HOURS LSl COMP LOAD (HOURS) 5,986 6,045 6,101 6,157 6,211 6,257 6,307 6,373 6,448 6,534 6,580 6,638 6,715 6,759 773 HOURS LS2 COMP RUN (HOURS) 21,540 21,680 21,820 21,960 22,080 22,140 22,240 22,370 22,530 22,720 22,820 22,950 23,100 23,210 1,670 HOURS LS2 COMP LOAD (HOURS) 2,318 2,334 2,354 2,372 2,388 2,396 2,410 2,427 2,448 2,472 2,485 2,502 2,523 2,536 218 HOURS ELECT. UPPER (kW-Hr) 1,857 1,898 1,936 1,981 2,019 2,057 2,118 2,165 2,245 2,343 2,405 2,488 2,590 2,687 830 KW-HR WATER METER (CF) 459,430 460,162 460,877 461,587 462,441 462,938 463,398 464,124 465,113 465,947 466,308 466,910 467,832 468,754 69,744 GALLONS BACKWASH PUMP (GAL.) 427,423 432,016 436,602 441,190 446,689 449,436 452,184 456,762 462,248 467,734 469,559 473,208 477,769 480,499 53,076 GALLONS IRRIGATION ZONES (GALLONS): ZONE 1 346,833 366,406 385,625 404,223 421,774 436,688 453,087 474,034 496,823 521,360 534,558 551,759 574,555 588,190 241,357 GALLONS ZONE 2 375,222 394,389 413,220 431,510 449,113 463,907 480,257 501,470 524,624 550,819 564,822 582,760 606,720 620,484 245,262 GALLONS ZONE 3 383,091 403,960 424,619 444,806 463,921 480,025 497,647 520,827 546,181 574,005 289,220 608,912 635,083 649,807 266,716 GALLONS ZONE 326,722 344,387 361,870 378,630 394,423 407,942 422,577 442,078 463,212 487,239 500,151 516,725 538,630 551,304 224,582 GALLONS ZONE 5 371,680 391,756 411,555 430,884 449,325 464,510 481,316 503,459 528,360 555,769 570,561 589,468 614,698 629,233 257,553 GALLONS ZONE 6 385,998 407,141 427,908 448,122 467,582 483,290 501,275 524,432 550,611 579,526 594,862 614,573 640,405 655,523 269,525 GALLONS ZONE 7 387,113 407,627 427,134 447,336 465,938 481,435 498,836 521,205 546,410 573,977 589,418 608,283 633,884 648,952 261,839 GALLONS ZONE 8 394,457 415,479 436,327 457,007 476,741 492,510 510,749 534,271 560,499 589,368 605,170 625,595 652,264 668,139 273,682 GALLONS ZONE 9 408,228 428,716 449,020 468,820 487,653 503,428 527,739 543,156 567,745 593,800 607,891 626,869 651,680 666,883 258,655 GALLONS ZONE 10 421,688 445,093 467,830 491,118 512,216 529,955 549,849 575,706 604,241 635,550 652,740 675,144 704,065 721,393 299,705 GALLONS ZONE 11 218,316 228,953 239,684 250,110 259,895 267,883 276,801 288,530 301,603 315,368 322,684 332,434 345,420 353,063 134,747 GALLONS ZONE 12 391,180 413,227 434,801 456,112 476,327 492,745 511,540 536,104 562,811 591,630 607,586 628,383 655,598 671,607 280,427 GALLONS ZONE 13 340,068 357,808 375,375 392,889 409,170 422,939 438,389 458,235 480,497 504,712 518,093 535,178 557,320 570,600 230,532 GALLONS ZONE 14 327,551 344,948 361,908 378,523 394,206 407,363 422,085 441,185 462,299 485,505 498,130 514,568 536,131 549,008 221,457 GALLONS ZONE 15 373,612 394,669 415,010 435,241 454,254 469,912 487,193 510,291 535,528 563,970 579,356 599,297 624,941 640,581 266,969 GALLONS Zone 16 326,534 345,945 364,947 383,062 400,736 415,217 431,561 452,490 475,626 500,906 515,055 533,308 557,102 571,492 244,958 GALLONS DAILYAVERAGE Average Units AVERAGE RUNTIME 89% 88% 82% 76% 82% 71% 83% 99% 100% 73% 82% 96% 55% 83% Percent AVERAGE FLOW (GPM) 32.3 31.0 31.5 30.0 24.5 27.6 35.8 39.0 38.1 27.3 30.4 40.2 20.5 31.4 GPM EFF. DISCH. (GALLONS) 46,539 44,709 45,430 43, 182 35,314 39,686 51,495 56,212 54,794 39,347 43,800 57,852 29,492 45,219 GPD TOTAL INFLUENT (GALLONS) 46,229 45,151 46,152 43,363 35,107 38,677 50,682 56,396 55,502 40,675 44,173 59,392 30,669 45,551 GPD INF. LEACHATE (GALLONS) 17,820 17,316 18,531 17,801 16,139 15,237 22,024 23,969 23,654 17,815 18,278 28,034 13,615 19,249 GPD INF. LS1-RWs (GALLONS) 9,147 9,758 9,387 8,762 2,801 8,360 9,901 11,898 11,644 8,210 9,194 11,327 5,995 8,953 GPD INF. PWDR) (GALLONS) 15,622 14,967 14,576 13,571 14,450 12,144 14,893 16,103 15,947 11,447 13,010 15,353 8,518 13,892 GPD INF. SIS-RWs (GALLONS) 3,639 3,110 3,658 3,229 1,716 2,936 3,864 4,426 4,258 3,203 3,691 4,678 2,541 3,458 GPD WEEKLY RUNTIME (DAYS) 6.3 6.1 5.8 5.3 5.8 5.0 5.8 7.0 8.0 4.4 5.8 6.8 4.4 5.9 DAYS/WK LSl COMP RUN (HOURS) 21.4 21.4 20.0 17.1 20.0 17.1 20.0 24.3 25.0 16.7 20.0 22.9 12.5 19.9 HRS/DAY LSl COMP LOAD (HOURS) 8.4 8.0 8.0 7.7 6.6 7.1 9.4 10.7 10.8 7.7 8.3 11.0 5.5 8.4 HRS/DAY LS2 COMP RUN (HOURS) 20.0 20.0 20.0 17.1 8.6 14.3 18.6 22.9 23.8 16.7 18.6 21.4 13.8 18.1 HRS/DAY LS2 COMP LOAD (HOURS) 2.3 2.9 2.6 2.3 1.1 2.0 2.4 3.0 3.0 2.2 2.4 3.0 1.6 2.4 HRS/DAY ELECTRICITY(kW-Hr) 5.9 5.4 6.4 5.4 5.4 8.7 6.7 11.4 12.3 10.3 11.9 14.6 12.1 9.0 kW-HR/DAY CITY WATER (GALLONS) 105.0 102.0 101.0 122.0 71 66 104 141 104 60 86 132 115 753 GPD BACKWASH PUMP (GAL.) 656.0 655.0 655.0 786.0 392 393 654 784 686 304 521 652 341 575 GPD EFFLUENT LABS Fe (mg/L) 0.48 0.68 0.36 0.58 0.55 0.85 0.83 0.54 1.1 1.5 1.2 0.55 0.68 1.52 0.8 mg/L pH 6.28 6.71 6.75 6.21 6.17 6.12 6.26 6 6.39 6 6.45 6 6.07 6 6 m/L ORP 107 92 87 97 110 207 74 152 119 237 240 238 144 128 148 mV COND 1,237 1,584 1160 1170 1287 1192 1644 1,212 1,816 3,454 1,640 1,285 1,310 1,430 1,553 uS/cm TDS (mg/L) 869 1,131 811.8 826.2 909.8 846.1 1168 857 1,346 1,309 1,147 912 934 1,029 1,017.0 mg/L TSS (mg/L) 1 3 3 3 1 5 2 3 1 4 5 8 18 4 mg/L COD (mg/L) 77 60 59 61 77 65 72 51 101 411 65 74 83 123 100 mg/L WELL LEVELS Elevation Change O W DR-4 682.16 OWDR-2 681.90 675.92 677.90 677.14 676.57 677.72 676.97 677.02 677.54 678.75 679.82 677.79 677.37 677.5 (4.36) PWDR-1 689.23 658.66 658.62 658.74 658.75 658.73 658.73 658.71 658.69 658.67 658.72 658.78 659.02 658.7 (30.49) OWDR-3 681.80 PW-6D (696.79) 680.37 OWLFS-2 680.00 PW-16D 680.52 PW-15D 683.12 682.41 682.53 682.28 681.86 682.60 682.41 682.3 (0.77) ESTIMATED LAKE LEVEL 682.6 682.1 681.4 681.4 681.4 681.81 681.61 681.8 (0.78) SOURCE WATER PWDR-1 YES YES YES YES YES YES YES YES YES YES YES YES YES YES LEACHATE(LCHT) YES YES YES YES YES YES YES YES YES YES YES YES YES YES ECOVERY WELLS YES YES YES YES YES YES YES YES YES YES YES YES YES YES USRECOVERY WELLS YES YES YES YES YES YES YES YES YES YES YES YES YES YES 70000 50000 LA z O J J Q 40000 O J LL } J_ Q 30000 LU C7 a w a 20000 10000 C�7 SEABOARD Q4 2020 0 1 2 3 4 5 6 7 8 9 10 11 12 13 WEEK 8 7 R, 5 - INF. LEACHATE (GALLONS) —M— INF. LS1-RWs (GALLONS) —* INF. PWDR1 (GALLONS) 4 --X— INF. SIS-RWs (GALLONS) EFF. DISCH. (GALLONS) 3 WEEKLY RUNTIME (DAYS) 2 1 w 695.00 J W J 675.00 J J W I-10 1111 665.00 655.00 SEABOARD Q4 2020 0 1 2 3 4 5 6 7 WEEK 8 9 10 11 12 13 OWDR-4 OWDR-2 PWDR-1 OWDR-3 PW-6D (696.79) tOWLFS-2 tPW-16D DPW-15D ESTIMATED LAKE LEVEL SEABOARD Q4 2020 4,000 3,500 3,000 2,500 O Fe (mg/L) o fpH 2,000 p --+—TSS (mg/L) z O U --X--ORP oac -I-COND 1,500 O fTDS (mg/L) COD (mg/L) 1,000 500 16.0 14.0 12.0 W a ce W 10.0 a J_ Q --$--LS1 COMP RUN (HOURS) 8.0 z 2 fLS1 COMP LOAD (HOURS) a g fLS2 COMP RUN (HOURS) z LS2 COMP LOAD (HOURS) 6.0 uELECTRICITY (kW-Hr) W 0 a 4.0 2.0 Water Treatment System Dioxane Chlorinated ethenes Chlorinated ethanes Other organics Total Mass kg kg k k k Step 1 Influent' 7.55 27.0 11.2 13.7 59.5 Mechanical Effluent' 7.08 0.33 0.18 0.24 7.83 Treatment System o Contaminant Removal 0 6./2 98.8% 98.4. 98.2 86.8 Irrigation water 7,080 330 180 240 7,830 Drainage water 209 ND ND ND 209 Lys 2 (vol. scaling factor,296) Lys 7 (vol. scalingfactor,257) 1,063 ND ND 95.6 1,158 Lys 8 vol. scalin actor,366 ND ND ND ND ND Lys 9 vol. scalin actor, 251 99 ND ND 36.4 135 Step 2 Lys 10 (vol. scalin actor, 230) 262 ND ND ND 262 Phyto- Lys 11A vol. scalin actor; 306 51 ND ND ND 51 remediation Lys 11B vol. scalin actor, 594) 324 ND ND ND 324 System Lys 12E vol. scalin actor, 169) 259 ND ND ND 259 Lys 12W vol. scalin actor, 271 17.6 ND ND ND 17.6 Lys 13E vol. scalin actor, 180) 33.1 ND ND 0.54 33.6 Lys 13W vol. scalin actor, 186 48.4 ND ND ND 48.4 Lys 14 (vol. scalin actor, 199) -- -- -- -- -- Lys 15 (vol. scalin actor, 893) 45.8 ND ND (1,196)* 45.8 Average (n=13) 185 ND ND 10.2 195.6 Step 2 Contaminant Removal 97.4% 100% 100% 95.7% 97.5% Overall Percent Contaminant Removal 97.5% 100% 100% 99.92% 99.67% Apparent variations in the influent and effluent mass are a result of variations related to residence time through the mechanical treatment system. Averages calculated from a greater number of samples show that influent and effluent mass are essentially equal, as expected.