Loading...
HomeMy WebLinkAbout23008_500 W Trade St_SIR_20200625 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 06/26/2020 11:21 AM I. Inspection Information Date & Time: 06/25/2020 12:57 PM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Mr. Greg icenhour (Mid Atlantic Engineering and Environmental Solutions) Location: Lat: 35.23142, Long: -80.84682, Brownfields Inspection Report: Mecklenburg Hotel, 23008-19-060 06/25/2020 12:57 PM Page 2 of 6 II. Project Information Number: 23008-19-060 Name: 500 West Trade/Mecklenburg Hotel Address: 500 West Trade Street City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Mixed Use Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: Unknown Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Vapor Block 20 installed as VIMS barrier, with VIMS installed under ground contact areas that are not open-air parking. Sub-slab depressurization being installed in addition to VIMS barrier under occupied spaces. VIMS plan not approved to date. Summary: N/A Summary: New mixed-use retail/residential being constructed at time of site inspection as seen in attached photos. Summary: Soil exposed due to typical construction activities. No excavations or soil stockpiles observed during inspection. Brownfields Inspection Report: Mecklenburg Hotel, 23008-19-060 06/25/2020 12:57 PM Page 3 of 6 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A No current risk to public. Site fenced and access controlled during construction activities. Brownfields Inspection Report: Mecklenburg Hotel, 23008-19-060 06/25/2020 12:57 PM Page 4 of 6 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: View of site looking northeast. Met with Mr. Icenhour and reviewed VIMS installation progress. During site inspection, met with construction superintendent, discussed active and passive VIMS areas, slight relocation of one soil gas plenum and addition of third soil gas plenum in southern corner of future tenant space (not proposed in VIMS design). Discussed future tenant pour back areas and required repairs to VIMS barrier prior to enclosing building envelope. Brownfields Inspection Report: Mecklenburg Hotel, 23008-19-060 06/25/2020 12:57 PM Page 5 of 6 Photo 2: Photo of stubbed up 6" riser pipe in west corner of building. New riser label applied during visit with additional labels given to construction superintendent. Photo 3: View of future tenant "pour back areas", in south corner area of "high rise" portion of building. Small square concrete cut-out on right of photograph is where VIMS 6” PVC riser will be located Brownfields Inspection Report: Mecklenburg Hotel, 23008-19-060 06/25/2020 12:57 PM Page 6 of 6 Photo 4: Another pour back area in South corner of High Rise portion of building. Pour-back areas contain stockpiled materials and debris, and VaporBlock-20 VIMS barriers within these areas are in generally poor condition. Photo 5: Close-up of VIMS barrier (Vaporblock-20) in tenant pour-back area. Cuts, penetrations, and debris (including concrete block) can be seen in photo. Barriers to be replaced in these sections according to Mid Atlantic following construction activities.