Loading...
HomeMy WebLinkAbout2509_INSP_20201208FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost X SLAS COUNTY: Craven Closed MSWLF HHW White goods X Incin T&P FIRM PERMIT NO.: 2509-MSWLF-1999 CDLF Tire T&P / Collection X Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Inspection: 8 December 2020 Date of Last Inspection: 27 April 2020 FACILITY NAME AND ADDRESS: Coastal Environmental Partnership 7400 Old Hwy 70 New Bern, NC 28560 GPS COORDINATES: N:35.16748 E:-077.22647 FACILITY CONTACT NAME AND PHONE NUMBER: Bobby Darden 252.633.1564 FACILITY CONTACT ADDRESS: Coastal Environmental Partnership PO Box 128 Cove City, NC 28523 Attn: Executive Director E-mail: bdarden@crswma.com PARTICIPANTS: John Barrow; Coastal Environmental Partnership Ray Williams; DEQ-Solid Waste STATUS OF PERMIT: Active; Life of Site Permit to Operate (PTO) Tuscarora Long-term Regional MSW Landfill IRL, Phases I, II, and III and Large, Type 1 Solid Waste Composting Facility issued 20 January 2017. Pursuant to NCGS 130A-294(a2), this PTO shall expire 3 September 2032. PURPOSE OF SITE VISIT: Partial Facility Compliance Inspection without records review STATUS OF PAST NOTED VIOLATIONS: None applicable OBSERVED VIOLATIONS: No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS section below. ADDITIONAL COMMENTS: 1) This Facility is a Municipal Solid Waste Landfill and a Large, Type 1 Composting Facility. 2) This Facility is permitted to receive Municipal Solid Waste, Construction & Demolition Waste, Yard Waste, Land-clearing Debris, and Scrap Tires generated in Carteret, Craven, Jones, and Pamlico Counties and all municipalities and Federal facilities within the boundaries of these four counties. 3) This Facility is recorded with the Craven County Register of Deeds at Book: 2251; Pages: 957-963. 4) Proper signage including the Facility permit number, accepted waste types, banned or excluded items, hours FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 2509_INSP_20201208 Page 2 of 3 of operation, and the emergency contact number is posted at the Facility entrance. 5) The Facility is secured by means of a locked gate at the main Facility entrance and by a locked gate at the Ingenco Facility Entrance. 6) The security gates were open upon my arrival and Facility personnel were on site during this Facility Compliance Inspection. 7) The Facility access road is of all-weather construction and is being maintained in overall good condition. 8) The hours of operation are Monday through Friday 7:30 AM to 4:30 PM and Saturday 7:30 AM to 2:00 PM. Three Holidays are observed: New Year’s Day, Thanksgiving Day, and Christmas Day. 9) This Facility is currently operating in Phase IV. 10) This Facility is permitted to use leachate for dust control within the liner limits. 11) The Municipal Solid Waste Facility is currently operating in Phase III. 12) This Facility is currently receiving +/- 600 tons of waste per day. 13) This Facility is approved for the use of Posi-shell as an alternative daily cover system. 14) A residential waste management area is maintained off of the main landfill access road to reduce the amount of small vehicle/small load traffic at the landfill working face. Roll-off containers are staged in this area for the collection of residential waste. Full containers are transported to the landfill working face to dispose of the collected waste as needed. This element and the around the containers appears well-maintained at this time. 15) Landfill gas is collected and used in the generation of electricity at the on-site Ingenco Energy Plant. 16) The Ingneco plant was in operation during this Facility Compliance Inspection. 17) The leachate collection system cleanouts are highly visible, readily accessible, protected, and well maintained. 18) Leachate is treated and stored in on-site leachate containment lagoons until pumped by force main to the City of New Bern Wastewater Treatment Plant. 19) The stormwater/sedimentation control basins were clear of vegetation and wind-blown debris and appear well maintained at this time. 20) The surface water ditches and stormwater management basins have recently been mowed. 21) A cover crop of native warm season grasses has been well established and maintained on the IRL and Phase I. 22) No areas of differential settlement or ponding water were observed in the closed areas of the landfill during this Facility Compliance Inspection. 23) Work is ongoing to establish a cover crop suitable to prevent erosion in the recently closed areas of Phase II and Phase III. These areas have recently been graded and seeded. 24) The cover crop is mowed throughout the year as needed. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 2509_INSP_20201208 Page 3 of 3 25) No off-site erosion was observed during this Facility Compliance Inspection. 26) Soil is stockpiled adjacent to the working face for use as cover. 27) The working face is being maintained in a compact and manageable size. 28) The waste type in the landfill was reviewed; the waste type being disposed is MSW and no unpermitted wastes were observed during this Facility Compliance Inspection. 29) Some windblown debris was observed collected along the perimeter fence and the outside slopes of the landfill. All windblown debris should be collected and returned to the working face at the end of each workday or throughout the day as needed. 30) Facility monitoring wells were reviewed during this Facility Compliance Inspection. All reviewed wells were readily accessible, properly labeled, and secured with functioning locks. 31) Compost screening operations were underway during this Facility Compliance Inspection. 32) All composting activities are maintained on the concrete pad. 33) All unprocessed vegetative materials are maintained separate from the compost windrows. 34) All compost piles are maintained with adequate space around the piles for turning, maintenance, and fire suppression. 35) Finished compost is maintained in separate piles in an area away from the compost windrows to prevent contamination from un-composted materials. 36) All dimensional lumber is maintained separate from the vegetative debris piles. All dimensional lumber is ground for removal from the site and used as boiler fuel. 37) Compost operations were underway during this Facility Compliance Inspection. 38) Scrap tires are staged in a concrete bunker adjacent to the wood waste grinding area until placed into trailers for transport to the tire management facility. 39) No violations were observed during this Facility Compliance Inspection. Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report. Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative Delivered on: 11 December 2020 by X Electronic delivery US Mail Certified No. [ _] cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov C: \2020\Craven\Facilities\25-09\Inspections\2509_INSP_20201208 NCDEQ DWM Laserfiche Online Document Management System: https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=155&dbid=0&repo=WasteManagement   Go Green! Thank you for helping NCDEQ be environmentally responsible.