Loading...
HomeMy WebLinkAbout49_N1085_INSP_20201202FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID X YW Transfer Compost SLAS COUNTY: N1085 MSWLF PERMIT NO.: Iredell Closed HHW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: 11/23/2020 & 12/2/2020 FACILITY NAME AND ADDRESS: Checkered Flag Land & Cattle 149 Buckin Ln. Troutman, NC 28166 GPS COORDINATES (decimal degrees): Lat.: 35.67694 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Bryce Hildebrand Telephone: (704) 677-8839 Email address: Bo ce.hildebrandgme.com FACILITY CONTACT ADDRESS: Same as above Date of Last Inspection: 11/28/2016 Long.:-80.80791 PARTICIPANTS: Bryce Hildebrand, Operator - Checkered Flag Land & Cattle Kim Sue, NCDEQ — Environmental Senior Specialist — Solid Waste Section STATUS OF PERMIT: A Land Clearing and Inert Debris Landfill Notification was recorded with the Iredell County Register of Deeds on July 28, 2016 by Shane and Melody Hildebrand, property owners. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: 1. RESOLVED: 15A NCAC 13B .0566(2) states: "The facility shall only accept those solid wastes which it is permitted to receive. " During the inspection conducted on November 23, 2020, municipal solid waste was observed at the facility. As a result, Checkered Flag Land & Cattle is in violation of 15A NCAC 13B .0566(2). To achieve compliance, Checkered Flag Land & Cattle, must remove all unacceptable solid waste from the site, including any that may be buried, and properly dispose of it in a facility permitted by the Division of Waste Management. Proof of disposal must be submitted to the Solid Waste Section in the form of disposal receipts indicating the facility where the waste was disposed. Receipts for disposal of all the waste should be sent to: Page 1 of 5 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management PW- Solid Waste Section Kim Sue, Environmental Senior Specialist Division of Waste Management/Solid Waste Section 610 E. Center Avenue Mooresville, NC 28115 (704) 235-2163 Kim.sue&ncdenr.gov 4. Municipal solid waste observed at the facility. Photos taken by Kim Sue 11/23/2020. During the inspection conducted on December 2, 2020, facility staff had removed all the municipal solid waste observed on November 23, 2020. The solid waste was disposed at Iredell County Landfill on November 25, 2020 and facility staff provided the disposal ticket. Therefore, this violation is considered resolved. Municipal solid waste removed. Photo taken by Kim Sue 12-2-2020. Page 2 of 5 FACILITY COMPLIANCE INSPECTION REPORT e::5f Division of Waste Management ."" Solid Waste Section 2. RESOLVED: 15A NCAC 13B .0563(1)(b) states: "The total disposal area is under two acres in size. " During the inspection conducted on November 23, 2020, land clearing waste was observed in an area Southwest of the active landfill and outside of the two -acre boundary. As a result, Checkered Flag Land & Cattle is in violation of 15A NCAC 13B .0563(1)(b). To achieve compliance, Checkered Flag Land & Cattle, must remove all land clearing waste in this area and properly dispose it in the approved land clearing landfill area. During the inspection on November 23, 2020, land clearing waste was observed being buried outside the landfill footprint. Photos taken by Kim Sue 11/23/2020. Photo showing land clearing waste being removed from hole. Photo taken by Bryce Hildebrand 11 /23/2020. Page 3 of 5 FACILITY COMPLIANCE INSPECTION REPORT P-W. Division of Waste Management Solid Waste Section During the inspection conducted on December 2, 2020, facility staff had removed all the land clearing waste observed in this area on November 23, 2020. Therefore, this violation is considered resolved. 3. CORRECTIVE ACTION IN PROGRESS: 15A NCAC 13B .0566(4) states: `Adequate soil cover shall be applied monthly, or when the active area reaches one acre in size, whichever occurs first. " During the inspection conducted on November 23, 2020, waste was exposed along the northern slope of the landfill and at toe of the slope south of the erosion control pond. As a result, Checkered Flag Land & Cattle is in violation of 15A NCAC 13B .0566(4). During the inspection conducted on December 2, 2020, facility staff had relocated some of the exposed land clearing debris to the top of the slope and adequate cover was applied. Due to the recent wet weather facility staff is in the process of relocating the exposed land clearing debris to the top of the slope and covering with adequate soil cover. To achieve compliance, by December 18, 2020, Checkered Flag Land & Cattle, must apply adequate soil to all waste including side slopes. During the inspection conducted on November 23, 2020, waste was exposed along the northern slope of the landfill and at toe of the slope south of the erosion control pond. Photo taken by Kim Sue 11/23/2020. Page 4 of 5 FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. The facility is a Land Clearing and Inert Debris Landfill Notification site which is permitted to accept only land clearing waste, inert debris, untreated wood and yard trash. 2. Proper signage was observed at the entrance of the facility. 3. Access roads are of all-weather construction and in good condition. 4. Access to the site is secured by a gate to prevent unauthorized access except when an operator is on duty. 5. No surface water was observed ponded around waste. 6. All timber stock piled for personal milling on the landfill should be relocated to an area outside the foot print of the active landfill. 7. Ensure permanent edge of waste markers that accurately designate the waste disposal boundary are installed and maintained at the facility. Please contact me if you have any questions or concerns regarding this inspection report. n Digitally signed by Kim Sue DN: cn=Kim Sue, —Division of Waste ` Management, ou=Solid Waste Section, ..4(,,,� email=kimsue@ncdenr.gov, c=US Date: 2020.12.041023:35-05'00' Phone: (704) 235-2163 Kim Sue Environmental Senior Specialist Regional Representative Sent to: Bryce Hildebrand X Email Hand delivery US Mail Certified No. 11 12/4/2020 Copies: Deb Aja, Western District Supervisor - Solid Waste Section Page 5 of 5