Loading...
HomeMy WebLinkAbout4101_Guilford_HighPoint_MSWLF_Seaboard_RemedialProgressReport_FID1513273_20201130SEABOARD GROUP II AND THE CITY OF HIGH POINT November 30, 2020 Mr. Joe Ghiold, Project Manager North Carolina Department of Environmental Quality Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Re: Remedial Action Progress Report, 2020 Third Quarter Former Seaboard Chemical and Riverdale Drive Landfill Site Jamestown, Guilford County, North Carolina Dear Mr. Ghiold: The Seaboard Group II and the City of High Point are providing this 2020 Third Quarter Remedial Action Progress Report for the former Seaboard Chemical Corporation facility and the closed Riverdale Drive Landfill located in Jamestown, NC. During the third quarter of 2020 the mechanical and phytoremediation treatment systems processed 3,918,273 gallons of extracted groundwater and leachate. Also during the third quarter of 2020 the following shutdown exceeding one day in duration occurred: Date Duration Reason for Shutdown September 9, 2020 9.0 days Citric wash of treatment system, clean lime tank, replace pump impellers, and replace filter media During the third quarter of 2020, only one significant shutdown occurred, as noted above. This shutdown allowed for routine scheduled maintenance of the treatment system and related components. The attached figures provide the results of the full scale operation of the treatment system during the third quarter of 2020, including: Operating Data, Process Flow Data, Static Water Level Data, System Chemistry, Utility Use Data, and Contaminant Removal Efficiency. Please contact Mr. Gary D. Babb, P.G. (919/605-4719) or Craig Coslett (610/435-1151) if there are any questions or comments. Please direct correspondence related to this matter to: Mr. Craig Coslett de maximis, inc. 1550 Pond Road, Suite 120 Allentown, PA 18104 Communications via electronic mail should be directed to gdbabb@gmail.com and ccoslett@demaximis. com. Respectfully, Seaboard Group II and City of High Point -"'I '4�7 za-- Gary D. Babb, P.G. Babb & Associates, P.A. cc: Dave Nutt, Esq. - Seaboard Trustee Jim Schenker, Technical Committee Oversight Craig Coslett - Project Oversight Coordinator Terry Houk - City of High Point Trustee Amos Dawson, Seaboard Group II Counsel Hayes Finley, City of High Point Counsel Jackie Drummond - NCDEQ Division of Solid Waste SEABOARD GROUP II & THE CITY OF HIGH POINT Quarterly Units of QUARTERLY LOG -Q42020 INITIAL WEEK WEEK WEEK WEEK4 WEEKS WEEK WEEK WEEK WEEK WEEK 10 WEEK 11 WEEK 12 WEEK 13 Totals Measure METER READING LEACHATE (GALLONS) 4,180,641 4,278,650 4,396,163 4,516,203 4,622,644 4,751,093 4,876,090 5,017,353 5,148,056 5,263,340 5,387,081 5,387,081 5,497,230 5,630,146 1,449,505 GALLONS LSl-RWs (GALLONS) 4,623,901 4,689,655 4,766,132 4,845,648 4,916,694 4,990,515 5,061,720 5,130,161 5,206,168 5,269,437 5,339,078 5,339,078 5,398,701 5,474,863 850,962 GALLONS PWDR1(GALLONS) 5,522,446 5,628,627 5,736,203 5,835,788 5,935,842 6,042,139 6,143,730 6,245,257 6,354,153 6,466,649 6,600,873 6,600,873 6,716,368 6,834,783 1,312,337 GALLONS SIS-RWs(GALLONS) 2,176,621 2,196,886 2,219,280 2,238,154 2,261,039 2,284,818 2,305,933 2,329,848 2,354,613 2,375,243 2,397,146 2,397,146 2,418,411 2,442,670 266,049 GALLONS PHYTO DISCH. (GALLONS) 7,168,097 7,464,026 7,794,362 8,116,842 8,422,432 8,759,812 9,075,645 9,421,028 9,766,918 10,081,230 10,432,154 10,432,154 10,738,979 11,086,370 3,918,273 GALLONS AIR STRIP. RUNTIME (HRS) 5,822 5,990 6,149 6,305 6,457 6,625 6,792 6,952 7,120 7,271 7,436 7,436 7,575 7,743 1921 (88%) HOURS LSl COMP RUN (HOURS) 9,666 9,822 9,981 10,130 10,280 10,450 10,620 10,780 10,950 11,100 11,260 11,260 11,400 11,570 1,904 HOURS LSl COMP LOAD (HOURS) 5,133 5,194 5,262 5,325 5,381 5,449 5,521 5,592 5,678 5,753 5,834 5,834 5,894 5,986 853 HOURS LS2 COMP RUN (HOURS) 19,720 19,870 20,020 20,170 20,310 20,470 20,630 20,780 20,940 21,090 21,250 21,250 21,380 21,540 1,820 HOURS LS2 COMP LOAD (HOURS) 2,097 2,114 2,133 2,150 2,168 2,188 2,206 2,225 2,246 2,265 2,283 2,283 2,299 2,318 221 HOURS ELECT. UPPER (kW-Hr) 1,401 1,437 1,473 1,511 1,547 1,586 1,623 1,660 1,698 1,733 1,772 1,772 1,817 1,857 456 KW-HR WATER METER (CF) 448,173 448,716 448,821 449,900 450,651 451,689 452,532 453,791 454,932 455,893 456,878 456,878 458,821 459,430 84,202 GALLONS BACKWASH PUMP (GAL.) 359,571 363,229 369,634 376,950 381,519 387,919 393,408 401,646 408,963 415,351 421,914 421,914 423,751 427,423 67,852 GALLONS IRRIGATION ZONES (GALLONS): ZONE 1 99,248 121,363 143,478 164,965 185,293 206,673 226,491 247,859 268,191 287,094 308,571 308,571 326,183 346,833 247,585 GALLONS ZONE 2 132,246 152,738 173,230 193,682 212,591 233,674 253,597 275,202 296,103 315,518 337,577 337,577 355,447 375,222 242,976 GALLONS ZONE 3 130,741 151,934 173,127 194,049 213,871 235,729 256,446 278,184 299,707 319,835 342,557 342,557 361,501 383,091 252,350 GALLONS ZONE 106,372 125,155 143,938 162,150 179,314 198,322 216,594 236,251 255,052 272,314 292,052 292,052 308,529 326,722 220,350 GALLONS ZONE 5 125,299 146,340 167,381 188,057 207,568 228,577 248,458 270,224 291,417 310,953 332,776 332,776 351,316 371,680 246,381 GALLONS ZONE 6 128,099 149,925 171,751 192,730 212,692 234,756 255,924 278,658 301,147 321,330 344,473 344,473 363,967 385,998 257,899 GALLONS ZONE 7 133,158 154,360 175,562 196,467 216,660 238,545 259,349 281,950 303,991 324,054 347,265 347,265 366,299 387,113 253,955 GALLONS ZONE 8 133,235 155,516 177,797 199,518 220,063 242,006 262,696 286,344 309,185 330,080 353,367 353,367 372,957 394,457 261,222 GALLONS ZONE 9 133,189 155,647 178,105 200,420 222,155 245,694 267,992 292,537 316,379 338,541 363,466 363,466 384,843 408,228 275,039 GALLONS ZONE 10 133,887 157,350 180,813 203,687 225,115 248,943 270,833 295,213 321,315 343,666 368,595 368,595 392,703 421,688 287,801 GALLONS ZONE 11 77,916 89,658 101,400 113,611 122,794 135,437 147,647 160,072 172,660 184,358 197,276 197,276 208,379 218,316 140,400 GALLONS ZONE 12 127,201 149,230 171,259 193,074 213,540 235,836 257,250 280,545 304,033 325,112 348,769 348,769 369,062 391,180 263,979 GALLONS ZONE 13 117,559 135,766 153,973 172,470 190,113 209,503 227,737 247,606 266,922 284,441 304,568 304,568 321,320 340,068 222,509 GALLONS ZONE 14 115,269 132,913 150,557 168,276 184,963 203,066 220,368 239,337 257,671 274,444 293,600 293,600 309,627 327,551 212,282 GALLONS ZONE 15 117,156 138,405 159,654 180,997 200,747 222,907 243,379 265,699 288,201 309,135 332,494 332,494 357,839 373,612 256,456 GALLONS Zone 16 88,120 108,212 128,304 148,591 164,462 188,127 207,569 228,660 248,820 267,734 289,315 289,315 306,624 326,534 238,414 GALLONS DAILYAVERAGE Average Units AVERAGE RUNTIME 100% 95% 93% 90% 100% 99% 95% 100% 90% 86% 0% 97% 100% 88% Percent AVERAGE FLOW (GPM) 29.4 32.8 32.0 30.3 33.5 31.3 34.3 34.3 31.2 30.5 0.0 35.5 34.5 30.0 GPM EFF. DISCH. (GALLONS) 42,276 47,191 46,069 43,656 48,197 45,119 49,340 49,413 44,902 43,866 51,138 49,627 43,138 GPD TOTAL INFLUENT (GALLONS) 41,458 46,280 45,431 42,918 47,478 45,558 47,878 48,624 44,526 43,689 51,089 50,250 42,706 GPD INF. LEACHATE (GALLONS) 14,001 16,788 17,149 15,206 18,350 17,857 20,180 18,672 16,469 15,468 18,358 18,988 15,960 GPD INF. LS1-RWs (GALLONS) 9,393 10,925 11,359 10,149 10,546 10,172 9,777 10,858 9,038 8,705 9,937 10,880 9,365 GPD INF. PWDR) (GALLONS) 15,169 15,368 14,226 14,293 15,185 14,513 14,504 15,557 16,071 16,778 19,249 16,916 14,448 GPD INF. SIS-RWs (GALLONS) 2,895 3,199 2,696 3,269 3,397 3,016 3,416 3,538 2,947 2,738 3,544 3,466 2,932 GPD WEEKLY RUNTIME (DAYS) 7.0 6.6 6.5 6.3 7.0 7.0 6.7 7.0 6.3 6.9 5.8 7.0 6.2 DAYS/WK LSl COMP RUN (HOURS) 22.3 22.7 21.3 21.4 24.3 24.3 22.9 24.3 21.4 20.0 23.3 24.3 21.0 HRS/DAY LSl COMP LOAD (HOURS) 8.7 9.7 9.0 8.0 9.7 10.3 10.1 12.3 10.7 10.1 10.0 13.1 9.4 HRS/DAY LS2 COMP RUN (HOURS) 21.4 21.4 21.4 20.0 22.9 22.9 21.4 22.9 21.4 20.0 21.7 22.9 20.0 HRS/DAY LS2 COMP LOAD (HOURS) 2.4 2.7 2.4 2.6 2.9 2.6 2.7 3.0 2.7 2.3 2.7 2.7 2.4 HRS/DAY ELECTRICITY(kW-Hr) 5.1 5.1 5.4 5.1 5.6 5.3 5.3 5.4 5.0 4.9 7.5 5.7 5.0 kW-HR/DAY CITY WATER (GALLONS) 77.6 15.0 154.1 107.3 148 120 180 163 137 123 324 87 942 GPD BACKWASH PUMP (GAL.) 522.6 915.0 1,045.1 652.7 914 784 1,177 1,045 913 820 306 525 740 GPD EFFLUENT LABS Fe (mg/L) 0.08 0.31 0.20 0.27 0.35 0.76 0.23 0.25 0.5 0.6 0.72 0.53 0.48 0.4 mg/L pH 6.78 6.57 6.38 6.31 7.25 7.15 7.24 7 7.13 7 6.8 6.57 6 7 m/L ORP 57 71 83 68 53 87 52 72 61 85 122 79 107 78 mV COND 1183 1184 1150 1081 1455 1705 1132 1,051 1,166 1,225 1,743 1,235 1,237 1,280 uS/cm TDS(mg/L) 823.7 821 799 744.5 1016 1208 784.9 729 811 582 1237 872 869 872.8 mg/L TSS (mg/L) 0 5 1 4 2 8 0 8 12 8 3 1 4 mg/L COD (mg/L) 72 114 69 79 71 70 92 60 78 77 72 83 77 78.5 mg/L WELL LEVELS Elevation Change O W DR-4 682.16 OWDR-2 681.90 678.92 676.50 677.42 676.84 676.99 677.40 677.21 678.02 675.49 682.50 676.41 676.00 677.5 (4.42) PWDR-1 689.23 663.71 658.72 658.67 658.68 658.70 658.70 658.72 658.32 657.32 658.71 659.0 (30.21) OWDR-3 681.80 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.67 686.7 4.87 PW-6D (696.79) 680.37 684.78 684.78 684.78 684.78 684.78 684.78 684.78 684.78 684.78 684.78 684.8 4.41 OWLFS-2 680.00 PW-16D 680.52 PW-15D 683.12 682.88 681.73 682.21 681.88 681.72 681.95 682.05 681.55 683.10 681.35 682.0 (1.08) ESTIMATED LAKE LEVEL 682.6 681.4 681.2 681.3 681.7 681.8 681.5 681.4 681.2 682.30 682.00 681.6 (0.97) SOURCE WATER PWDR-1 YES YES YES YES YES YES YES YES YES YES No No YES YES LEACHATE(LCHT) YES YES YES YES YES YES YES YES YES YES No No YES YES LS-1 RECOVERY WELLS YES YES YES YES YES YES YES YES YES YES No No YES YES SIS RECOVERY WELLS YES YES YES YES YES YES YES YES YES YES No No YES YES SEABOARD Q3 2020 s 5 INF. LEACHATE (GALLONS) INF. LS1-RWs (GALLONS) 4 INF. PWDR1 (GALLONS) INF. SIS-RWs (GALLONS) 3 —W- EFF. DISCH. (GALLONS) WEEKLY RUNTIME (DAYS) 2 1 w SEABOARD Q3 2020 695.00 690.00 685.00 OWDR-4 680.00 OWDR-2 ,Jl, PWDR-1 > J 675.00 OWDR-3 J J "' PW-6D (696.79) tOWLFS-2 670.00 tPW-16D DPW-15D 665.00 ESTIMATED LAKE LEVEL 655.00 ' 0 1 2 3 4 5 6 7 8 9 10 11 12 13 WEEK SEABOARD Q3 2020 I A 2,000 1,800 1,600 1,400 1,200 p Fe (mg/L) o fpH 1,000 p --+—TSS (mg/L) z O U --X--ORP 800 -I-COND fTDS (mg/L) 600 COD (mg/L) 400 200 SEABOARD Q3 2020 m 7.0 6.0 W a ce W 5.0 a J_ a --$--LS1 COMP RUN (HOURS) 4.0 z fLS1 COMP LOAD (HOURS) a g fLS2 COMP RUN (HOURS) z LS2 COMP LOAD (HOURS) 3.0 uELECTRICITY (kW-Hr) W 0 a 2.0 1.0 Water Treatment System Dioxane Chlorinated ethenes Chlorinated ethanes Other organics Total Mass kg kg kg kg k Step 1 Influent' 10.38 42.0 18.1 17.5 88.0 Mechanical Effluent 1 9.44 0.16 0.088 0.088 9.8 Treatment System % Contaminant Removal 9.1 % 99.6% 99.5% 99.5% 88.9 Irrigation water 9,440 160 88 88 9,800 Drainage water 184 ND ND 4.0 188 Lys 2 (vol. scaling factor, 259) Lys 7 vol. scalin actor, 270 212 ND ND 7.8 220 Lys 8 vol. scalin actor, 428 ND ND ND ND ND Lys 9 vol. scalin actor, 250 -- -- -- -- -- Lys 10 vol. scalin actor, 403 318 ND ND ND 318 Step 2 Lys 11A vol. scalin actor, 277 -- -- -- -- -- Phytoremediation System Lys 11B vol. scalin actor, 683 204 ND ND ND 204 Lys 12E vol. scalin actor, 166 322 ND ND 13.1 335 Lys 12W vol. scalin actor, 346 33.5 ND ND ND 33.5 Lys 13E vol. scalin actor, 179 -- -- -- -- -- Lys 13W vol. scalin actor, 217 78.6 ND ND ND 78.6 Lys 14 vol. scalin actor, 208 ND ND ND ND ND Lys 15 vol. scalingfiactor, 1,009 9.9 ND ND 87.7 * 9.9 Averse (n=13) 104.8 100% 100% 1.9 106.7 Step 2 % Contaminant Removal 98.9% 100% 100% 97.8% 98.9% Overall Percent Contaminant Removal 99.0% 100% 100% 99.98% 99.9% 'Apparent variations in the influent and effluent mass are a result of variations related to residence time through the mechanical treatment system. Averages calculated from a greater number of samples show that influent and effluent mass are essentially equal, as expected.