HomeMy WebLinkAbout3506_INSP_20201022NORTH CARnLINAD_E Q�/��
oenammem m c.wm.mnnai Wei
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
X
SLAS
COUNTY: FRANKLIN
MSWLF
PERMIT NO.: 3506-COMPOST-2012
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: October 22, 2020
FACILITY NAME AND ADDRESS:
David Brantley & Sons, Inc.
37 Pine Ridge Road
Zebulon, NC 27597
GPS COORDINATES: N: 35.92656' E:-78.25294 0
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Shane Brantley, Owner
Telephone: 888.817.1904, Cell 919.669.5187
Email address: dbsonslkamail.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Amanda Thompson, NCDEQ Solid Waste
Davy Conners, NCDEQ Solid Waste
Date of Last Inspection: June 16, 2017
STATUS OF PERMIT:
The Large Type 3 Permit was issued on February 14, 2019. The permit will expire on February 14, 2024.
Wind River Environmental is identified as the operator in the permit.
PURPOSE OF SITE VISIT:
Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS
None.
OBSERVED VIOLATIONS
A. 15A NCAC 13B .1406 (3), "Stormwater shall be diverted from the operations area."
And February 14, 2019 Permit to Operate, Attachment 3 (18), "An appropriate Division of Energy, Mineral
and Land Resources (DEMLR) permit for managing any stormwater and/or wastewater at the facility
must be maintained as required. Any leachate generated at the facility and any runoff from the facility
must be managed to prevent containment of groundwater and surface water. The facility must be
maintained to prevent the accumulation of stormwater and leachate on composting areas, storage areas,
and roads."
Page 1 of 4
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
o"' t0E!�'m"""°"""' Solid Waste Section
At the time of this inspection, areas of standing water were observed within the access areas between the
windrows. Depressions with algae growth on the soil were observed near the final product stockpiles. The site
needs to be properly graded to promote drainage of surface water away from the windrows and stockpiles.
B. February 14, 2019 Permit to Operate, Attachment 3 (10), "All sides of storage and compost areas for
flammable materials must be clear and drivable, to provide vehicular access in the event of a fire."
During the inspection, the final product windrow near the southeastern corner of the Site, was not accessible on
all sides. Adequate distance around the windrow must be maintained for fire suppression and proper mixing.
C. February 14, 2019 Permit to Operate, Attachment 3 (15), "The operator must monitor the compost for
process indicators, including moisture content, aeration/turning, porosity, and particle size, and make
adjustments as necessary to minimize odors and to ensure composting best management practices."
During this inspection, we spoke with a driver, David, for Wind River. He stated that the attendant for the site
had quit approximately 3 weeks ago. David reportedly took the temperatures of the compost for a about a week,
then told Wind River that he would not be taking the temperatures anymore. David stated that he only parks his
truck at the site. No waste is currently being delivered to the site. David also stated that the loads of grease he
hauls are taken to Brooks in Sanford. Wind River needs to have an attendant at the site to properly manage the
composting process.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS:
1. This facility is a Large Type III Solid Waste Compost facility.
2. The facility is permitted to accept dewatered septage and grease, food waste, manure, yard waste, vegetative
material, and clean wood material.
3. Signage has been posted at the entrance to the facility listing the permit number, and emergency contact number
as well as materials accepted at the facility. The facility is not open to the public.
4. Then site is secured by a locking gate at the facility entrance.
5. The facility access road is of all-weather construction and is well maintained at this time.
6. Access around the facility is stable, and no areas of erosion were noted during this compliance inspection.
7. Per the February 14, 2019 Permit to Operate, Attachment 3 (22), "Trash and unacceptable wastes received
at the site must be stored in containers and promptly removed from the site for proper disposal." A few
unacceptable waste materials including plastic tubing were identified within the final product windrow. The waste
must be removed and disposed of properly.
8. No fugitive dust was observed during the facility compliance inspection.
9. Odors were minimal in the composting area and none were noted at the permitted facility boundaries.
10. No windblown debris was observed during this facility compliance inspection.
11. Corrective measures are required as a result of this inspection and should be completed within 30 days'
receipt of this inspection.
12. Photographs were taken during the inspection.
Page 2 of 4
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by
Amanda Thompson
Date: 2020.11.13
13:23:27-05'00' Phone: (910) 433-3353
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: November 13, 2020 X Email Hand delivery US Mail Certified No. Lj
Copies: Jason Watkins, Field Operations Branch Head — Solid Waste Section
Andrew Hammonds, Eastern District Supervisor — Solid Waste Section
Davy Conners, Environmental Senior Specialist — Solid Waste Section
Chester Cobb, Soil Scientist — Solid Waste Section
Amanda Freeman, Compliance Officer — Solid Waste Section
Jessica Montie, Compliance Officer — Solid Waste Section
View of the si2na2e at the front of the site.
View of the site. F
southwest.
View of standing water within the access road
windrow.
between the windrows.
Page 3 of 4
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
View of algae within a depression.
F.
r 1-
View of unacceptable plastic tubing within the final
View of the mixing pad.
No vehicle access to the west of the southwestern
final product stockpile.
Page 4 of 4