Loading...
HomeMy WebLinkAboutSLAS5903_PERMIT_20200715 Facility Permit No.: SLAS-59-03 Robersonville Ice and Coal Inc. Permit to Operate July 15, 2020 Page 2 of 5 CONDITIONS OF OPERATING PERMIT 1. This permit shall become void if the soils fail to adequately assimilate the septage and shall be rescinded unless the site is maintained and operated in a manner which will protect the assigned water quality standards of both surface and ground waters. 2. This site shall be operated and maintained in accordance with the nutrient management plan submitted by C. Mort Hurst and approved by the Division of Waste Management. The 7.7 acre site is divided into 4 fields known as Field 1 (2.0 acres), Field 2A (1.9 acres), Field 2B (1.8 acres), and Field 3 (2.0 acres). Fields 1 is established in bermudagrass and fescue. Fields 2A and 2B are established in fescue. Field 3 is established in bermudagrass and is overseeded each year in September with a small grain. The planting and harvesting of the crops shall follow the approved nutrient management plan. Areas that fall below 80% in crop coverage shall be replanted as covered in the nutrient management plan. The 30-day waiting period between the last application of septage and the harvest of a crop shall be met by alternating septage applications between the active fields. All discharges shall be at locations on the site consistent with the crop rotation in the approved plan. 3. This site shall be operated and maintained in accordance with the erosion and runoff control plan submitted by C. Mort Hurst in such a manner as to prevent the migration of wastes off the designated waste receiving site. Any site improvements noted in the plan must be installed within 30 days of plan approval. The installation of groundwater monitoring wells shall be required as deemed necessary by the Division. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other local, state, and federal government agencies which have jurisdiction. It is the responsibility of the Permittee to be in compliance with the Federal Regulations listed in the Code of Federal Regulations, 40 CFR Part 503. 5. This permit may be modified or reissued at any time to incorporate any conditions, limitations and/or monitoring requirements the Division deems necessary to adequately protect the environment and public health. Facility Permit No.: SLAS-59-03 Robersonville Ice and Coal Inc. Permit to Operate July 15, 2020 Page 3 of 5 6. This site is only permitted for the land application of domestic septage (including portable toilet waste) and grease septage. The pH of domestic septage shall be raised to 12 or higher by alkali addition and, without the addition of additional alkali, shall remain at 12 or higher for 30 minutes prior to land application as per 15A NCAC 13B .0842(c)(1). The pH of grease septage or grease septage mixed with domestic septage shall be raised to 12 or higher by alkali addition and, without the addition of additional alkali, shall remain at 12 or higher for 2 hours prior to land application as per 15A NCAC 13B .0842(c)(2). Grease septage shall be diluted as required by 15A NCAC 13B .0842(a)(14) when applied over perennial vegetation. 7. This site contains approximately 7.7 acres that are available for land application of septage. The maximum annual application rate for Fields 1, 2A, and 3 shall be 50,000 gallons per acre per year, for a total maximum annual application of 295,000 gallons. The total, maximum annual application amount for this site may be increased up to 385,000 upon the opening of inactive Field 2B. Application rates to each approved disposal field shall not exceed the maximum annual application rate or the monthly application rates listed in the approved nutrient management plan. The maximum annual application rate assumes equal septage distribution, on an annual basis, over the entire permitted area. 8. An approved septage detention facility with a minimum design capacity of 7,500 gallons shall be available prior to operation of this site as per 15A NCAC 13B .0838(a) unless an approved wastewater treatment plant is available for use during periods of adverse weather. The storage capacity may be adjusted if it is demonstrated during the operation of the site that this volume of storage is inadequate. 9. Only the area designated on the attached site map shall be utilized for septage disposal. Each load of septage discharged at the site shall be distributed from a moving vehicle in such a manner that there is no standing water when the discharge is complete. 10. Septage shall not be applied during any precipitation event, or if there is standing water on the soil surface, if the soil surface is frozen, or if the soil surface is snow covered. The Permittee shall consider pending weather conditions when making the decision to land apply in order to prevent any discharge of septage outside of the permitted boundary. 11. Septage shall not be applied during periods of high soil moisture. Septage applications that will result in ruts greater than three inches in the soil surface are prohibited. Facility Permit No.: SLAS-59-03 Robersonville Ice and Coal Inc. Permit to Operate July 15, 2020 Page 4 of 5 12. Any discharge of septage outside of the permitted boundaries via runoff, aerial drift, etc. is prohibited. 13. This permit shall become void unless the land application activities are carried out in accordance with the conditions of this permit and in the manner approved by this Division. No one other than the Permittee or an employee of the firm named in this permit shall discharge septage at this site without prior appropriate notification and written approval from the Division. 14. Prior to any transfer of this land, a notice shall be given to the new owner that gives full details of the materials applied or incorporated at this site. The Division shall be notified prior to site closure. This permit is non-transferable. 15. This permit shall expire on July 15, 2025. An application for permit renewal shall be submitted at least ninety (90) days prior to the permit renewal date. When necessary, an application for permit modification shall be submitted for any proposed change listed in 15A NCAC 13B .0840(g). Along with the application for permit renewal or modification, septage application records for the time this permit was valid shall be submitted. 16. Records shall be kept in accordance with 15A NCAC 13B .0842(e)(1) and the Code of Federal Regulations, 40 CFR Part 503.17(b) to document all septage applications to the site. These records shall be made available to a representative of the Division upon request. 17. Any duly authorized officer, employee, or representative of the Division may, upon presentation of credentials, enter and inspect any property, premises, or place on or related to the disposal site and facility at any reasonable time for the purpose of determining compliance with this permit; may inspect or copy any records that must be kept under the conditions of this permit; or may obtain samples of groundwater, surface water, or leachate. 18. Field separations in the nutrient management plan and all pertinent setbacks shall be clearly located on the site. Boundaries of the permitted septage land application fields shall be clearly marked on the ground. Facility Permit No.: SLAS-59-03 Robersonville Ice and Coal Inc. Permit to Operate July 15, 2020 Page 5 of 5 19. The areas that can be used for land application of septage shall be maintained to meet the minimum setback distances as described in 15A NCAC 13B .0841(d) such as 500 feet from any existing wells, residences, places of business, or places of public assembly. Also, septage shall not be disposed of within 50 feet of any property line, within 100 feet of any ditch, or within 200 feet of any surface water unless specified otherwise. 20. Field 2B is considered inactive until further notice. Field 2B shall be inspected by the Division for crop coverage prior to use. Please notify the Division at least two (2) weeks prior to when you wish to reopen the field.