Loading...
HomeMy WebLinkAbout1107_Buncombe_CDLF_Permit_Phase7_MonitoringWellRequest_FID1441221_20200805Environmental Consultants & Contractors August 5, 2020 Ms. Jaclynne Drummond North Carolina Department of Environmental Quality Division of Waste Management - Solid Waste Section Asheville Regional Office 2090 US Highway 70 Swannanoa, North Carolina 28778-8211 Subject: Buncombe County, North Carolina Permit No. 11-07 Buncombe County Landfill - C&D Landfill Expansion Request to Re -Locate Groundwater and Landfill Gas Monitoring Wells Dear Ms. Drummond: In an effort to expand the existing C&D landfill, SCS Engineers, PC (SCS), on behalf of Buncombe County, hereby submits this request to re -locate two groundwater monitoring wells (MW-17 and MW- 17D) and one landfill gas monitoring well (M-12). The relocation of this well cluster will help maximize C&D landfill airspace volume, minimize landfill operational risks due to filling sequences and eliminates the risk of potential well cluster damage in its current location due to filling operations. The last benefit to the relocation is due to the current cluster location at the toe of next landfill expansion slope. The existing and proposed location of the new well cluster are shown on the attached Figure 1. The monitoring wells will be abandoned in accordance with 15A NCAC 02C (.0113) standards for abandonment. The monitoring wells will be abandoned by over -drilling with grouting of open boreholes. The wells will be re -installed at the approved location and constructed in a similar manner to the original installations. Should you have questions, please do not hesitate to contact either of the undersigned at (704) 504- 3107. Sincerely, Jared T. Hamela, PG Senior Project Geologist SCS ENGINEERS, PC jth/scl CC: A. Gaither/SWS Attachments: Figure 1 Steve C. Lamb, PE Project Director/Vice President SCS ENGINEERS, PC 2520 Whitehall Park Drive, Suite 450, Charlotte, NC 28273 1 704-504-3107 iJ )RAWN BY: JCT DATE: 1.8.2020 FILE NAME: 09218197.01 LEGEND 2095- 10-FOOT EL. CONTOUR PROPOSED MONITORING WELL LOCATION - — — — — — — — — — - - C&D WASTE PHASE LIMIT - — — — — — - - PREVIOUSLY PROPOSED WASTE LIMIT _ -_ --- ACCESS ROAD SEDIMENT BASIN 13 — Q MW-# - GROUNDWATER MONITORING WELL / •N I I M-12 - LANDFILL GAS MONITORING WELL \\ I I \\ I I PREVIOUSLY PROPOSED EDGE OF WASTE LIMIT FROM CDM SMITH I II I\ II II \o co a°' 00 2p50 \\ I 1 \\\\\ \ 204 \\\\\\ 1971 I/ l� N� 0 200 400 600 SCALE IN FEET / FUTURE I/ PHASE 6B I io' / / EXISTING PHASE 6A \ cy V \\\ 2o6o Q 1,10 I ' 209 2070 / 206 / 1 SEDIMENT BASIN 11 \� I I I I EXISTING y PHASE 5 �rytiio� � 1�i 111i 00 I I �Tioog � 1 I 1 1 I%ZI P ,LO\0 00 20 \g9 198 \ 1970 SCS ENGINEERS. PC FIGURE 1 - PHASE 6 EXISTING MONITORING WELLS