HomeMy WebLinkAbout1607T_INSP_20200626FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer X Compost SLAS COUNTY: Carteret
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 1607-TRANSFER-2019
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 26 June 2020
FACILITY NAME AND ADDRESS:
Green Recycling Transfer Station @ Hibbs Road
812 Hibbs Road
Newport, NC
GPS COORDINATES: N: 34.7536639 E: -076.8779556
FACILITY CONTACT NAME AND PHONE NUMBER:
James E Maides
Green Recycling Solutions
910.938.5900
FACILITY CONTACT ADDRESS:
Green Recycling Solutions, LLC
166 Center Street
Jacksonville, NC 28546
E-mail: jamesmaides@csbenc.com
PARTICIPANTS:
James Maides; Green Recycling Solutions
Dave Wasiela; Wasiela Consulting LLC
Ray Williams; NCDEQ/Solid Waste
STATUS OF PERMIT:
Active; Permit to Construct (PTC) issued 28 October 2019. This permit shall expire 28 May 2021.
PURPOSE OF SITE VISIT:
Pre-operative Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
There were no violations observed during this Facility Compliance Inspection. Please see the ADDITIONAL
COMMENTS section below for details concerning this inspection.
ADDITIONAL COMMENTS:
1) This is a Solid Waste Transfer Facility and is permitted to receive Solid Waste as defined in NCGS 130A-
290(a)(4); (14); (15); and NCGS 130A-294 (m).
2) This Facility is permitted to receive Construction & Demolition Waste generated in Brunswick, Carteret,
Craven, Duplin, Jones, Lenoir, New Hanover, Onslow, Pamlico, Pender, Pitt, and Wayne Counties.
3) Construction and Demolition Waste must be transported for disposal to the Maysville Construction and
Demolition Landfill in Jones County, permit #52-03.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
1607T_INSP_20200624
Page 2 of 3
4) Proper signage including the Facility permit number, accepted waste types, banned or excluded items, and the
emergency contact number is posted at the Facility entrance.
5) Erosion control devices are in place and appear to be functioning properly. No off-site erosion was observed
during this Facility Compliance Inspection.
6) The Facility is secured by means of a locked gate at the Facility entrance.
7) The Facility access road is of all-weather construction and is being maintained in overall good condition.
8) Construction of the Facility has been completed and appears to be incompliance with the approved
construction plan.
9) *This Facility may not begin solid waste management operations until the Permit to Operate has been issued.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
1607T_INSP_20200624
Page 3 of 3
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 13 July 2020 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern Area Supervisor/SWS: andrew.hammonds@ncdenr.gov
Ethan J Caldwell; Permitting Engineer/SWS: ethan.caldwell@ncdenr.gov
C: \2020\Carteret\Facilities\16-07T\Inspections\1607T_INSP_20200626
NCDEQ DWM Laserfiche Online Document Management System:
https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=1357787&dbid=0&repo=WasteManagement
Go Green! Thank you for helping NCDEQ be environmentally responsible.