No preview available
HomeMy WebLinkAbout24XX_CarolinaCompost_Applic-JonathanCox_2020FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMI7 WHITEVILLE NORTH CAROLINA APPLICATION NARRATIVE Facility Application for Type 4 Solid. Waste Composting Permit, Whiteville, North Carolina Prepared for: Carolina Composting, LLC. Prepared by: Leonhardt Environmental, PC Date: December 26, 2019 Carolina Composting is herein requesting the issuance of a permit for a Type 4 Composting Facility in Columbus County, North Carolina. If you have any questions regarding this application, please contact Mr. Jonathan Cox at (910) 653-6600 (office) or (910) 234-1407 (cell). The following information is specifically attached as required for an application for a permit to construct a proposed Large Type 4 solid waste compost facility: An aerial photograph or scaled drawing showing the area within one-fourth of the mile of the proposed site's boundaries with the following specifically identified: Entire property owned or leased by the person proposing the site; Location of all homes, wells, industrial buildings, public or private utilities and roads, watercourses, dry runs, and other applicable information regarding the general topography within one-fourth mile; and land use and zoning of the proposed site. All requirements a r e shown on Figure 1 attached to this narrative. A letter from the unit of government leaving zoning jurisdiction over the site which states that the proposed use is allowed within the existing zoning, if any, and that any necessary zoning approval or permit has been obtained. Letter from Mrs. Samantha Alsup, Senior Planner of Columbus County is contained within Appendix A of Application Narrative. A composting facility is an appropriate use of the proposed site. An explanation of how the site complies with siting and design standards in Rule .1404 of this Section. 1 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA All requirements of 15A NCAC 13B Section .1404 have been met. A visual representation of these requirements is included in the drawing package. • The site is not located within the 100-year floodplain. • There is a distance of 220 feet to the closest property line (minimum requirement 100 feet). • The distance to the closest resident is 750 feet (minimum requirement 500 feet). • The distance to the closest well is 750 feet (minimum requirement of 100 feet). • The distance from the closest perennial stream is 950 feet (minimum requirement 50 feet). • Facility is located in accordance with 15A NCAC 2B .0200 • The site has met the surface water and groundwater requirements outlined in 15A NCAC 13B .1404 (9) and (10). Additional requirements net include the following: • The site does not allow uncontrolled public access • The site meets the requirements of the Sedimentation Pollution Control Law • The site meets the requirements of the Air Pollution Control Requirements (15A NCAC 2D) to minimize fugitive emissions and odors. • The active composting pad is not located near the boundaries of the site which minimizes odors at the property boundary. • A detailed report indicating the following: • Waste type(s), source and quantity of the solid waste to be composted, including the source and expected quantity of any bulking agent or amendment (if applicable), any expected recycle of bulking agent or compost, and any seasonal variations in the solid waste type or quantity; This information is contained within the design report. The current primary waste stream includes: Projected Primary Waste Stream includes: • Shampoo, body wash mixed with wood flour • Tank bottoms mixed with wood flour • Wood waste (pallets and other wood debris) • Ammonium Chloride mixed with wood flour • Activated lime dust • Bio Solids ( from local Wastewater treatment plants) 2 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Potential Waste Stream • Non -Hazardous sludges mixed with wood flour • Petroleum contact waters );nixed • Food waste • Carbon black • Waste treatment residuals • Yard waste • Paper • Manure bedding • Peptone Site plans at a scale where one inch is less than or equal to tOO feet to the inch that delineates the following: • Existing and proposed contours, at intervals appropriate to the topography; • Location and elevations of dikes, trenches, and other water control devices and structures for the diversion and controlled removal of surface water; • Designated setbacks, buffer zones and property lines; • Access roads; • Areas for unloading, processing, active co>Inposting, curing, and storage of material; Flood plains and wetlands and benchmarks, A visual representation of these requirements is included in Appendix B. A description of the operation of the facility, which must include at a minimum: • Name, address, and phone number for the person responsible for the operation of the facility; Person responsible for operation of facility is; Carolina Composting, LLC William Clark P.O. Box 1981 Whiteville, North Carolina 28472 3 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEV[LLE NORTH CAROLINA Email:cox a coastalfirstre.com Office '� (9 ) 234-1407 Fax # 1-(910) 640-2609 The landowner of the site is Kyle Cox. The facility is owned by Carolina Composting, LLC. Jonathan Cox is the person responsible for receiving fee invoices. Until this time, the site has existed as undeveloped land. Operation Plan for the facility; See operations plan for high level procedures and operations manual for detailed procedures. • List of personnel required and the responsibilities of each position; Jonathan Cox - Facility Manager William Clark -- Operations Manager All personnel are required to attend the Carolina Composting facility's annual in-house training program. The program covers the importance of maintenance; how to carry out a walk around inspection; how to perform maintenance checks and inspections to identify potential problems and safety procedures. To ensure the safety of the public when on site, quarterly traffic flow meetings are also required. All personnel are required to complete 6 hours of continuing education through a certified compost program. A schedule for operation, including days and hours that the facility will be open, preparations before opening, and procedures to be followed after closing for the day; The normal hours are: Monday through Friday Saturday Sunday 8:00 A.M. until 5:00 P.M. 8:OOA.M. until Noon, Saturday Closed Preparations before opening will include visually inspect facility and daily preventative maintenance of all equipnhent prior to use. Closing procedures will include malting sure all windrow data has been properly recorded and any unblended or raw material is properly covered/stored to prevent any adverse environmental effects. • For mixed waste processing facilities, a plan for removing and disposal of household hazardous waste from the waste stream; All household hazardous waste will be identified, stockpiled and disposed of properly. • Special precautions or procedures for operating during wind, heavy rain, snow, freezing or other adverse conditions; When wind becomes greater than 25 miles an hour the facility will be closed to dumping to all dry material that may create problem dust. During periods of heavy rain windrows 4 FACILITY APPLICATION FOR TYPE A SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA will not be turned to allow the external fori.ned shell to shed water. Unblended or raw materials will be berined to help prevent excessive runoff during periods of heavy rain. During snow events snow will be plowed outside of the leachate control area. Snow on the windrows will be incorporated with the windrow turner. Odor and vectors at the site are monitored daily and controlled by proper site sanitation and following established composting procedures. Background information on all raw feedstocks will be assessed prior to shipment to the Carolina Composting facility in order to help minimize vectors and odors. Feed stocks with excessive dryness will be mixed with excess leachate water to help control airborne particulates. Leachate will only be applied prior to the beginning of PFRP requirements. Water will be applied to help control airborne particulates in active windrows. The location of our composting pad is situated on the property in an area that will facilitate the reduction in noise, airborne particulates, and odors from leaving the core area. • A description of actions to be taken to minimize noise, vectors, airborne particles, and odors; Through limiting the hours of operations, the time of day when windrow turning occurs based on weather conditions and cloud inversion, along with covering raw feedstocks that are putrescible with inorganic material noise, vectors, air borne particulates and odors will be minimized. ® A description of the ultimate use for the finished compost, method for removal from the site, and a contingency plan for disposal or alternative usage of residues Or finished compost that cannot be used in the expected manner due to poor quality or change in market conditions. All compost produced at the Carolina Composting facility is not marketed. Instead, it is retained onsite and reapplied. Finished compost that cannot be used in tile expected manner due to poor quality or change in market conditions will be land applied. • A report on the design of the facility, including; • Design capacity of the facility; • A process flow diagram of the entire facility, including the type, size, and location of all major equipment, and feed stock flow streams. The flow streams shall indicate the quantity of material on a wet weight and volumetric basis; • A description and sizing of the storage facilities for amendment, bulking agent, solid waste, recyclables, household hazardous waste and finished compost; • The means for measuring, shredding, mixing, and proportioning input materials; • Anticipated process duration, including receiving, preparation, composting, curing, and distribution; • The separation, processing, storage, and ultimate disposal of non-compostable materials, if applicable; • A d e s c r i p t i o n o f t h e location of all temperature, air and any other type of monitoring points, and the frequency of monitoring; FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT W HITEVILLE NORTH CAROLINA • A description of how the temperature control and monitoring equipment will demonstrate that the facility meets the requirements in Rule .1406 Items (10), (11), or (12) of this Section, as appropriate for the feedstock; • The method of aeration, including turning frequency or mechanical aeration equipment and aeration capacity; • A description of the air emission and control technologies; • A description of the method to control surface water run-off; and the method to control, collect, treat, and dispose of leachate generated; and • A description of any recycling or other material handling processes used at the facility. All items are addressed in the Design Report and Operations Manual. • A description of the label or other information source that meets the requirements of Rule .1407(k) of this Section. • An information sheet accompanies the product that contains the classification grade, recommended uses, application rates, restrictions on usage and Total N. • Engineering plans and specifications for the facility, including performance data for all equipment selected. • Information contained within the design drawing package and operations manual. • The following information is required for reviewing an application for a permit to operate a Type 4 or Large Type 2 or 3 solid waste composting facility: • Contingency plans detailing corrective or remedial action to be taken in the event of equipment breakdown; air pollution; non -conforming waste delivered to the facility; spills, and undesirable conditions such as fires, particulates, noise, vectors, odors, and unusual traffic conditions; Details provided in the Operation manual. PROBLEM CORRECTIVE ACTION Compost pile temperatures too high I . Mix more frequently. (>70 degrees) 2. Poor Air flow through pile. Poor mixing would most likely cause this. Check moisture content and teardown pile and rernix, if needed. Compost pile temperatures too low l . Insufficient arnount of new bulking agent; remove pile, re -mix and replace. Blinding/clogging of screen l . Solids content too low; pile material in drying space and aerate until solids content is >55 percent. 6 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT. W HITEVILLE, NORTH CAROLINA Odors coming from paved area 1. Possible ponding of leachate around debris; clean paved surface. 2. Possible collection of debris in catch basins; remove and clean catch basin debris. Rain run-off ponding around catch 1. Possible ponding may occur during periods of basins short -duration, heavy rain; however, if this remains, check catch basins for clogging debris. Blowing dust 1. Clean area around screen. 2. If coming from finished compost stockpiles, wet piles. Equipment breakdown 1) All preventative maintenance, minor repair, and replacement of ware parts will be done on site by our personnel. Rental equipment will be obtained if necessary. 2) All major repairs will be done by a certified service technician. Fire 1) Use fire extinguisher on -site. 2) Contact local fire department. Unusual traffic conditions 1) Modify schedule of operation to avoid. A detailed operation and maintenance manual. The manual must contain general design information, a discussion of compliance with operational requirements as outlined in Rule .140b of this Section, detailed operational information and instruction, equipment maintenance, list of personnel, required personnel training, outline of reports to be submitted in compliance with this Section, and safety instructions; Details provided in the operation manual. • A quality assurance plan for the process and final product which lists the procedures used in inspecting incoming materials; monitoring, sampling and analyzing the compost process and final product, testing schedule, and record keeping requirements; Details provided in chapter seven of the operational manual. • A fact sheet and process flow diagram that summarizes actual equipment sizing, aeration capacity, detention times, storage capacity, and flow rates (wet weight and volumetric) for the system and equipment chosen; Details provided in the design manual. • As -built drawings; Provided in Appendix B • Calculations This product will not be marketed or distributed to any other entities. The product will be re -applied on site. FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA GENERAL Prior to distribution of the compost product, several key regulatory and quality control parameters must be met during the composting process. Records containing the information required to show these parameters have been met must be met during the composting process. Records containing the information required to show these parameters have Y of compost in any 24-hour period must be kept at the facility. This information should also include the date and quantity of compost distributed and the intended use. A flyer or information sheet with a description of the product and recommended usages must be available at the point of distribution. In order to be considered safe for distribution, the compost product must fulfill the following criteria: The compost product must have been brought to a minimum temperature of 55 degrees C (131- degree F) for fifteen (15) consecutive days in order to fulfill the requirements ofUSEPA biosolids stabilization process to further reduce pathogens (PFRP) or Class I according to 15A NCAC 13B .140. The compost product must have been brought to a minimum average temperature of 113 degrees F (45degrees C), with no readings below 104degrees F (40 degrees C), for 14 days to fulfill the requirements of USEPA vector attraction reduction (VAR) requirements. Monitoring of the compost product for pH, percent total solids, nutrients, and heavy metals concentrations must be done on a regular basis with data available for state inspection at any time. CONTROL QUALITY Compost quality is measured by the following criteria. These are: • Moisture content • Nutrient content • Particle size distribution • Stability • Concentration of trace elements and heavy metals • Product consistency over time • Pathogens • pH • Soluble salts • Water holding capacity • Bulk density • Organic )matter content FACILITY APPLICATION FOR TYPE 4 SOL10 WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA MOISTURE CONTENT The moisture content of the compost product is affected by drying during the composting process and storage method; covered storage can prevent moisture addition by rainfall. The product must be dry enough to allow handling with conventional loading, hauling and spreading equipment/methods. The SS % TS criterion for efficient screening also provides a dry enough product to meet these needs. Care must also be taken not to over -dry the product as well. When compost is too dry, it will generate dust when handled, and it is difficult to re -wet. NUTRIENT CONTENT The nutrient content of compost is also a quality component. The major plant nutrients supplied by compost are nitrogen, phosphorus, potassium (N-P-K). Most minor plant nutrients are also contained in compost, and these also contribute to its quality and value. The level of nutrients in compost is controlled by the chemical composition of the input biosolids, the bulking agent used, and the extent to which the bulking agent is contained in the final screened product. Thus, the way in which operators can this quality parameter is to assure efficient screening and minimum carryover of the bulking agent into the compost product. The content of these nutrients should be known to allow end users to make correct decisions regarding the addition of supplemental nutrition. Particle Size This quality parameter is primarily a function of the screen size used. Different end - users of compost will have different requirements as far as particle size distribution of the compost. The most demanding user in this regard will be horticulturists who will use the material in potting mixtures, or landscapers who will use it in turf topdressing Those who will incorporate the compost into the soils, e.g. landscapers, field crop growers, will have less stringent requirements. End users can identify the requirements for particle size. A 3/8-inch screen size is the most common size in biosolids composting facilities and has shown to provide a good quality, versatile compost suitable for several users. If a potentially large user in the area requires a different screen size, the screens can be interchanged. Stability The term stability, as used here, is defined as a product that will not undergo rapid decomposition or produce nuisance odors when applied by users. Unstable compost consumes nitrogen and oxygen in significant quantities to support biological activity, which generates significant heat, carbon dioxide, and water vapor. Stable compost consumes almost no nitrogen and oxygen and generates almost no carbon dioxide or heat. Unstable compost demands nitrogen and can cause nitrogen deficiency in soils and be detrimental to undergo the prescribed composting and curing, there should be no problem in achieving a stable product. Critical to achieving stability is assuring that a minimum of 30 days curing provided. 9 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Concentration of Trace Elements and Heavy Metals The content of undesirable elements in compost, such as heavy metals and certain organic substances will be a direct result of the levels of these elements in the input biosolids and, to a lesser extent, the bulking agents. Many of the contaminants, referred to as heavy metals, are actually needed by plants for normal growth. Therefore, measuring the concentration of these elements will provide valuable management data relevant to the fertilizer requirements of plants, and subsequent fertilizer application rates. Also, certain heavy metals can be phytotoxic to plants in S FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Bulk Density Bulls density is used to convert compost application rates from tonnage to cubic yards. Bulk density is also used to determine the volurue of compost that may be transported at a given time, taking into consideration that most vehicles have a specified maximum gross weight limit. It may also affect other handling issues such as front- end loader size and bucket capacity. Bulk density is greatly influenced by the moisture content of the compost. Organic Matter Content Organic shatter content is the measure of carbon -based materials in compost. Being aware of a product's organic matter content is necessary for determining compost application rates for specific situations such as soil incorporation and topsoil production, and it is used as a means to measure the value of some products. State Departments of Transportation (DOT) include organic matter content in their specifications. Product Consistency over Time This quality parameter is one of the most important to end users. hi order to incorporate compost into their operating practices, users must be certain that, within narrow limits, each batch of material has the same properties. Without product consistency, end users cannot be assured of consistent field results. The operators must work toward the production of a consistent product, which is vital to the long-- term success of the distribution program. FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLf NORTH CAROLINA Appendix A_ 12 FACILITY APPLICATION FOR TYPE A SOLID WASTE COMPOSTING PERMIT, W HITEVILLE, NORTH CAROLINA 13 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA 14 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHi7MUE NORTH CAROLINA SECTION I The Carolina Composting facility located in Whiteville, North Carolina is designed to process approximately 32,160 tons/year of feedstock for composting. At present time a barn located on the properly will serve as the service building for the facility. Analytical Results regarding the feedstocks can be found in Appendix A. These calculations can be found in Appendix B. If feedstock materials are changed, the production numbers would change based on the bulk density of the feedstock materials. The equipment maintained on site includes: uinment Loader 1 1 Truck- 17 cubic yard bed Scales 15 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION 2 Process Flow Diagram Inspection & a a Contaminant Waste &Bulking Agent Removal 437 cy/day 95 cylday 532 cylday Recycled Screening -I 221 cylday ; - rl - 21 cylday Finished Compost & Storage FIGURE 2.1 Process Flow Diagram (Based on 5 Days per Week Daily Design Volumes) To. Market 16 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PFRMIT WHITEVILLE NORTH CAROLINA SECTION 3 Shredding, Mixing, and Proportioning of Inpw'_i Waterials A barn located on the property of the Carolina Composting's site provides storage for pallets and similar bulking agents received. A storage area is approximately 5 acres and provides up to 340 days storage of bullring material. Appendix C contains the analytical results for various feedstocks and finished products. 3.1 Shampoo/body wash Approximately 700 tons of Shampoo/body wash will be transported to the Carolina Composting site on a monthly basis. 3.2 Biosolids Dewatered, stabilized biosolids from the local wastewater treatment facilities are transported to the Carolina Composting site. The biosolids design criteria are summarized as follows in Table 3-2, Table 3-2 Biosolids Design Criteria Summary Item Quantity Annual Tonnage of Biosolids Cake Approx. 1200 Daily Tonnage, TPD, 5-Day-per-Week Basis Approx, 5 Annual Tonnage, Dry -Tons per -Year Approx.984 Daily Tonnage, DTPD, 5-Day-per—Week Basis Approx. 5 Solids Content, Percent Total Solids 18 Bulk Density, pounds per cubic feet 1465 3.3 Bulking Agent/Pallets/Yard Waste/Manure bedding Waste from various agricultural operations is used as a bulking material at the Carolina Composting facility site. The quantities and types available are summarized in Table 3. 17 FACILITY APPLICATION FOR TYPE 4 SOLIO WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Table 3-3 Quantities of Bulking Materials Available Item Quantity Annual wood waste quantity (pallets, etc.) 2400 Tons Annual yard debris quantity requiring grinding 240 Tons Paper 120 Tons Total bulking agent available, average 3640 Tons 18 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Current Primary Waste Stream. Volume per month Ammonium Chloride mixed with wood flour 400 tons/nio. Shampoo, body wash mixed with wood flour 700 tons/nio. Non -hazardous sludges mixed with wood flour 160 tonshno. Petroleum contact waters mixed 160 tonshno. Tank bottoms mixed with wood flout• 640 tons/mo. Food waste 10 tons/mo. Carbon black 10 tons/mo. Activated lime dust 200 tons/mo. Wood waste (pallets, etc.) 200 tonshno. Waste treatment residuals 20 tons/mo. Yard waste 20 tons/mo. Paper 10 tons/mo. Manure bedding 10 tons/mo. Peptone 20 tons/mo. Bio Solids (local Wastewater Treatment Plants) 100 tons/mo. 19 FACILITY APPLICATION FOR TYPE 4 SOLIa WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA 3.4 Recycle The finished compost is screened through 3/8-inch screens depending upon the intended usage. Material retained by the screen (overs) is recycled back into the compost mix. 20 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PFRMIT WHITEVILLE NORTH CAROLINA SECTION 4 Process Duration Biosolids received is processed as soon as possible after receiving. It is anticipated that active composting will occur for 28 days. The maturation and storage duration will be between 30 and 90 days depending upon demands. PA FACILITY APPLICATION FOR TYPE 4 SOLID WAS7E COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA SECTION 5 Monitoring Temperatures in the piles are monitored during daily operation. Temperatures are monitored using portable thermometers (i.e, no in -line or continuous monitoring). Daily operating parameters are recorded in the logbooks. The logb o o k s will record the day the windrow was built, daily temperatures, and turning events. The logb o o k s will be used to show that the windrows -maintained temperatures of 131 degrees or greater for at least 15 days during which the windrows were turned multiple times. 22 FACILITY APPLICATION FOR TYPE 4 SOLIDWASTE COMPOSTING PERMIT WHITEVILLE NORTHCAROLINA SECTION 6 Aeration Method The composting process used at the Carolina Co>nposting facility is windrow composting. Aeration is achieved through using the proper proportion of bulking agent to compost materials and through windrow turning. Windrows are turned during the active composting phase. 23 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION 7 Air Emissions and Control 'Technologies When wind becomes greater than 25 miles an hour the facility will be closed to dumping to all dry material that may create problem dust. During periods of heavy rain windrows will not be turned to allow the external formed shell to shed water. Unblended or raw materials will be bernied to help prevent excessive runoff during periods of heavy rain. During snow events snow will be plowed outside of the leacbate control area. Odor and vectors at the site are monitored daily and controlled by proper• site sanitation and following established composting procedures. Background information on all raw feedstocks will be assessed prior to shipment to the Carolina Composting facility in order to help minimize vectors and odors. Feedstock materials with excessive dryness will be mixed with excess leachate water to help control airborne particulates. Leachate will only be applied prior to the beginning of PFRP requirernents. Water will be applied to help control airborne particulates in active windrows. The location of our cornposting pad is situated in a natural pine tree buffer. This buffer- will help facilitate the reduction in noise, airborne particulates, and odors fronn leaving the core area. 24 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION S Surface Water Control Operating under the memorandum of agreernent for permitting of composting and mulching facilities, a non -discharge design has been prepared. This design allows for onsite storage of runoff from all active parts of the composting process, including unloading and processing areas of biosolids and active compost areas. Curing and storage areas do not contain stormwater ponds. Collected stormwater and leachate is recycled in the composting process prior to the beginning of PFRP requirements, land applied, or pumped and treated to maintain a minimum of 2 feet of freeboard at all times, and ensure enough volume is available in the basin to capture runoff from the 25 year, 24 hour storm. 25 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION9 General Design Criteria The materials balance is necessary to define the equipment size, space requirements, materials handling, and manpower needs for the composting facility. There is variability according to the feedstock materials available. 9.1 General Design Criteria Table 9-2 indicates the sizing and storage capacity at the Carolina Composting facility. Table 9-3 presents the capacity of the facility. Detailed calculations can be found in Appendix B. Solids and density information for the biosolids, bullring agents, initial mix and finished compost are based on the results from samples taken by Carolina Composting. Operating days are assumed to be 5 days per -week in the design criteria and the materials balance. TABLE 9-2 General Design Information Process Area (ydzPile height (ft) Unloading and Processing 40.000 8 Biosolids 1,620 5 Active Composting 5,868 8 Maturation and Storage 28,960 12 TABLE 9-3 Facility Capacity (Approx.) Process Volume (CYlday) Bulk Density (lb/CY) Tons/yr. Active Composting 129 790 32,160 Maturation and Storage 116 950 28960 Finished Compost 104 950 26074 Wt FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMtT WHITEVILLE NORTH CAROLINA No chemical analyses have been performed. Appendix A Analytical Results 27 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT W HITEVILLE, NORTH CAROLINA Appendix Calculations 28 FACILITY APPLICATIONAPPL[CATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE-NORTHCAROLINA Volume and Throughput Calculations I q'I t!A tLA �.A I LQ yy 29 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT W HITEVILLE NORTH CAROLINA Operation Plan The normal hours of operation are S:OOAM to 5:OOPM, Monday through Friday and 8:00 AM to 12:00 AM Saturday. Company employees will have unlimited access to the facility when scheduled activities dictate. The facility will be locked at all other times. Pre - Open Preparations before opening will visually inspect facility and daily preventative maintenance of all equipment prior to use. Any issues found that might create poor compost, fugitive dust, offensive odors, runoff or any noncompliance issues will be addressed immediately. Minute equipment problems will be fixed on site as soon as possible. Major problems will be scheduled for outside repair as soon as possible. Equipment with problems deemed unsafe to operate will be shut down until repairs are made. Facility safety is paramount. If the facility conditions are deemed unsafe by staff, the site will be closed to all activities. Equipment and Training All preventative maintenance, minor repair, and replacement of worn parts will be done on site by personnel or at local repair shops. All major repairs will be done by a certified service technician. All equipment will have an inspection record and a maintenance record to ensure all required periodic inspections and preventive maintenance services ate completed. These records will be reviewed on a monthly basis. All personnel are required to attend the annual in-house training program. The Carolina Composting program covers the importance of maintenance; how to carry out a walk around inspection; how to perform maintenance checks and inspections to identify potential problems and safety procedures. To ensure the safety of the public when on site, quarterly traffic flow meetings ate also required. All personnel ate required to complete 6 hours of continuing education through a certified compost program. 30 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Material Handling Incoming materials are deposited at designated areas and stockpiled within the corupost yard until rows are built. 1. Determine the volume of biosolids to be mixed. This is estimated from the volume of the FEL bucket and the number of buckets to be mixed at one time, typically one (1) to two (2). 2. Check and log solids content for the biosolids. This information should be provided by the staff of the dewatering operations at the WWTP. 3. Determine the volumetrie mix ratio of each constituent using the mix solids calculation sheet in Appendix A in the Design Report and the bulk density of the constituents as estimated in the materials balance or measured in the field. 4. Using the FEL place a bed of one (1) of the bulking agents one (1) to two (2) feet high and approximately one (1) FEL bucket width wide. 5. Place biosolids on top of the bulking agent bed with the FEL. 6. Place the remainder of the needed bulking agent over the top of the biosolids. 7. Pick up and drop the constituents several times with the FEL bucket. S. Continue mixing until a thorough blend is achieved. The row should be turned from 3 to 5 times to help thoroughly blend the different feedstocks. 9. Visually inspect the mix for thorough blending. A good mix will be uniform in color, have all the bulking agent coated with biosolids and should have no balls or clumps larger than 4" in diameter. 10. Place the mixture into the compost pile and repeat the process. A front-end loader is used to build approximately two rows each week depending on the volume of incoming material. The row is turned 3 to 5 times to help thoroughly blend the different feedstocks and initiate the compost process. FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMiT WHITEVILLE NOR7H CAROLINA Windrow temperatures, moisture levels and weather conditions are monitored and recorded daily. These criteria help establish when subsequent turnings will occur. These records will ensure that compliance with PFRP, which is a minimum temperature of 131F for 15 days, turned 5 times, is completed. After these requirements are met, windrows are turned periodically to help maintain temperatures. When a compost test fails to meet Federal pathogen and vector requirements (40 CFR), which imposes a potential threat to the public health and the environment, the facility shall report the failed testing result to the division within 72 hours after receiving the testing result(s). Distribution of the compost products must stop until a further test confirms that the batch of re -composted products have met the federal safety standard. As space is needed or when the active composting is finished, rows are moved from the asphalt pads to the clay pad for further curing. Screened compost volumes will be determined by the end use demand. Agricultural land application will sometimes be done immediately after composting is completed without screening. When wind becomes greater than 25 miles an hour the facility will be closed to durnping to all dry material that may create problem dust. During periods of heavy rain windrows will not be turned to allow the external formed shell to shed water. Unblended or raw materials will be bermed to help prevent excessive runoff during periods of heavy rain. During snow events snow will be plowed outside of the leachate control area. Odor and vectors at the site are monitored daily and controlled by proper site sanitation and following established composting procedures. Background information on all raw feedstocks will be assessed prior to shipment to the Carolina Composting facility in order to help minimize vectors odors. Feedstocks with excessive dryness will be mixed with excess leachate water to help control airborne particulates. Leachate will only be applied prior to the beginning of PFRP requirements. Water will be applied to help control airborne particulates in active windrows. The location of our pad is situated in a natural pine buffer. This buffer will help facilitate the reduction in noise, airborne particulates, and odors leaving the core area. Feedstocks Incoming feedstocks are recorded by volume (cubic yard) and by weight (tons). Food -by- products, industrial waste, agribusiness' waste, municipals wastewater treatment plant and water treatment plant residuals, pallets, will all be recorded in tons. Carbon material used for bulking agents will be recorded as cubic yards. Shampoo, body wash mixed with wood flour and tank bottoms mixed with flour are the main feedstocks. Other feedstocks are added based on availability and ratios to ensure proper composting within each windrow. Feedstocks are delivered and stored in the raw product storage area of the pad. 32 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Active Composting - Windrows Windrows are constructed from the SW to side of the asphalt pad. Temperatures are taken daily at 4 places along the windrow with a Res -temp thermometer. Moisture will be checked as needed by the squeegee test. Each row position is numbered one thru eleven. Subsequent rows built in a position will receive a letter footnote (1, 1A, 1B, etc.) This identification will help with sampling and testing results. Maturation and Storage- Finished Product Screening may occur prior to placement in finished product storage area. Curing will occur for an additional 30 to 90 days. Delivery and Distribution All waste materials will be delivered by Carolina Composting personnel. Any deliveries made other than Carolina Composting employees will be scheduled through the Controller. Likewise, all distribution actives are monitored compost personnel. Finished compost will be transported in clean trucks and loaded with a dedicated wheel loader to help prevent cross contamination. Some compost destined land application will be hauled off site in spreaders. There will be no unauthorized dumping of any material at any time. Testing Compost samples of furnished compost products are periodically tested for nutrients availability. Based on the permit requirements a complete compost analysis is done by a certified lab at the required frequency. Safety All safety procedures outlined in the operations manual must be followed. The following personal hygiene recommendations are stressed as common practices to all compost facility employees. • Wash hands before eating, drinking, or smoking. • Food should not be eaten or stored near biosolids. Do not drink from plant hoses. • if heavily contacted with biosolids, invrrediately take a hot shower and put on clean clothing. The supervisor should be notified. • It is recommended that showers be taken each day and hair be washed prior to leaving the plant site. • All employees working at the compost facility must wear protective clothing, i.e. uniforms and/ or coveralls, and safety shoes. • Change from protective clothing to street clothing at the end of each day. Soiled, protective clothing should not leave the premises. • Goggles, dust masks, and hard hats must be available and should be worn by employees working in the mixing and screening areas. Wash, disinfect, and bandage ANY cut, no matter how small. Any break in the skin can become a source of infection. Change bandages frequently and wear protective clothing over the wound. • Keep fingernails closely trimmed and clean (dirty nails can harbor pathogens). 33 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Corrective Action PROBLEM CORRECTIVE ACTION Compost pile temperatures 1. Mix snore frequently. too high (>70'C) 2. Poor air flow through pile. Poor mixing would most likely cause this. Check moisture content and teardown pile and remix, if needed. Compost pile temperatures 1. Insufficient amount of new bulking agent; remove pile, re -mix and too low replace. Blinding/clogging of screen 1. Solids content too low; pile material in drying space and aerate until solids content is >55 percent. Odors coming from paved 1. Possible ponding of leachate around debris; clean paved surface. area 2. Possible collection of debris in catch basins; remove and clean catch basin debris. Rain run-off ponding around 1. Possible ponding may occur during periods of short -duration, heavy catch basins rain; however, if this remains, check catch basins for clogging debris. Blowing dust 1. Clean area around screen. 2, if coming from finished compost stockpiles, wet piles. Equipment Breakdown 1. All preventative Rnaintenance, minor repair, and replacement of ware parts will be done on site by our personnel. 2. Rental equipment will be obtained if necessary. 3. All major repairs will be done by a certified service technician. Fire 1. Use fire extinguisher on -site. 2. Contact local fire department. Unusual traffic conditions 1. Modify schedule of operation to avoid. 34 FACILITY APPLICATION FOR TYPE 4 SOLfd WASTE COMP0571NG PERMIT WHITEVILLE NORTH CAROLINA Carolina Composting Operations & Maintenance Plan 35 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA TABLE OF CONTENTS Section1- Introduction..................................................................................... ...................38 Section 2 - Composting Process................................................................... ......41 2.1 Introduction........................................................................................................................................41 2.2 Material Balance...................................................................................................................................... 42 2.3 Solids Content..................................................................................................... .......45 2.4 Process Flow Diagram............................................................................................................................46 2.5 Teniperature........................................................................................................................................48 2.6 Oxygen Content.................................................................................................................................. 49 2.7 Carbon to Nitrogen Ratio (C:N)..................................................................................................... Section 3- Materials Handling and Mixing Procedures.................................................................. 51 3.1 Introduction..................................................................................................................................51 3.2 Shampoo/Body wash................................................................................................ 5 3.3 Biosolids Receiving.............................................................................................. 51 3.4 Bulking Agent Storage............................................................................................................................51 3.5 Mixing.....................................................................................................................................52 3.5.1 Mix Solids Content............................................................................................................52 3.5.2 Mixing Process Description........................................................................................................... 53 3.5.3 Mixing Methods- Manual Mixing with Front End...................................................53 Section4-Conlposting............................................................................................................................55 4.1 Introduction........................................................................................................................................55 4.2 Compost Pile Building....................................................................................... ................................ .....55 4.3 Turning.................................................................................................................................. 55 4.4 Pile Monitoring & Data Recording.................................................................................................. 55 4.5 Maturation and Storage........................................................................................................... .. 56 Section 5- Screening Procedures......................................................................................................... 57 Section 6 -Maturation and Storage..................................................................................................... 58 6.1 Introduction..................................................................................................................................59 6.2 Maturation and Storage Pile Building... .............................................................. ........................... 58 Section 7- Sampling, Testing and Record Keeping for Quality Assurance...................................59 7.1 General..................................................................................................................................59 7.2 Sampling and Testing Schedule...........................................................................................................59 7.3 Grab Sampling............................................................................................................. ...60 ........................ 7.3.1 Grab Sample Definition........................................................................................................................60 7.3.2Grab Sampling Procedure... ........................................................................................ ................... 60 36 FACILITY APPLICATION FOR TYPE 4 SOUP WASTE COMPOSTING PERMIT WFIITEVILLE NORTH CAROLINA 7.4 Composite Sampling.......................................................................................................................... 61 7.4.1 Composite Definition.......................................................................................................................61 7.4.2 Composite Sampling Procedure....................................................................................................... 61 7.5 Sample Testing Procedures............................................................................................................... 61 7.5.1 Transfer of Samples.................................................................................................................... 61 7.5.2 Total Solids Content.................................................................................................................... 61 7.5.3 Volatile Solids Content.................................................................................................................... 62 7.5.4 Coliform, Salmonella, and Metals................................................................................................... 62 7.6 Operational Record Keeping Procedures..........................................................................................63 7.6.1 Types of Records...........................................................................................................................64 7.7 Annual Reporting Record Keeping Procedures..............................................................................65 Section 8- Troubleshooting Procedures........................................................................................ 8.1 General. . . . . . . . . . . . . . . . . ............................................................................................................................. 66 Section9- Health and Safety.................................................................................................................67 9.1 General .... ............................ ............... -...... .............................. .... ..................... I ......................... 67 9.2 Personal Hygiene...................................................................................................................... 9.3 Personal Protective Equipment.............................................................................................................68 9.4 Electrical and Mechanical Equipment Hazard Prevention............................................................ 68 9.5 Employee Health and Safety Training................................................................................................ 68 9.5.1 First Aid.................................................................................-....................................... 70 9.5.2 Fire Extinguisher..................................................................................................................I........70 9.5.3 Physical Exposure.......................................................................................................................... 70 9.5.3.1 Biosolids.................................................................................................70 9.5.3.2 Bioaerosols..............................................................................................71 9.5.3.3 Dust..............................................................................................................71 List of Figures 1-1 Partial Site Plan.................................................................................................................................40 2-2 Process Flow Diagram.......................................................................................................................47 List of Tables 2-1 Compost Mix Calculations.................................................................................................43 8-1 Common Problems and Corrective Actions....................................................................66 37 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION This O&M manual provides information regarding the proper operation of the composting facility, record keeping and product testing/utilization recommendations. The personnel on -site are the following: Personnel Title Duties Jonathan Cox Facility Manager Manage all aspects of the compost facility operations William Clark Facility Manager Responsible for all daily on -site operations All personnel are required to attend the Carolina Composting's annual in-house training program. The program covers the importance of maintenance; how to carry out a walk around inspection; how to perform maintenance checks and inspections to identify potential problems and safety procedures. To ensure the safety of the public when on site, quarterly traffic flow meetings are also required. All personnel are required to complete 6 hours of continuing education through a certified compost program. 38 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION i -INTRODUCTION The equipment maintained on site includes: 1 Wheel Loader {approximately 3.5 cubic yard bucket ® 1 Excavator ® Dump Truck — 17 cubic yard bed All preventative ►maintenance, minor repair, and replacement of ware parts will be done on site by our personnel. All major repairs will be done by a certified service technician. All equipment will have an inspection record and a maintenance record to ensure all required periodic inspections and preventive maintenance services are completed. These records will be reviewed on a monthly basis. The normal facility staffed operating hours are: Monday through Friday 8:OOA.M to 5:00 P.M Saturday 8:OOAM to Noon Sunday Closed 39 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA Preparations before opening include visually inspect facility and daily preventative maintenance of all equipment prior' to use. Closing procedures will include malting sure all windrow data has been properly recorded and any unblended ol• raw material is properly covered/stored to prevent any adverse environmental effects. Attached are Figures which show a partial view of the site plan and the location of the composting facility at the site. 40 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE NORTH CAROLINA SECTION 2 Composting Process 2.1 Introduction The windrow composting process was selected for the Carolina Composting facility. The reasons for selecting this process are: • It is one of the lowest cost systems for biosolids composting; • It is flexible and can use a wide variety Of bulking agents; • The process complies with the US Environmental Protection Agency (USEPA) and State of North Carolina regulations; The facility capacity, materials handling, and economics of the process are sensitive to the percent solids produced of the ferric sulfate residuals and biosolids received. The higher the solids content, the less amendment is needed which results in less material handling and lower operational costs. The higher solids content and lower amount of amendment that is needed results in a lesser overall volume of materials to be composted. Since a major aspect of composting is to ensure aerobic conditions within the composting mass, adequate porosity must be provided in the piles to allow for air movement. In order to achieve proper pore space, an amendment is blended with biosolids or other materials requiring stabilization. The amendment not only provides for pore space, but also adjusts the moisture content of the biosolids/amendment mixtureso that water does not block the pores and there is sufficient free pore space for oxygen transfer. In addition, the amendment adjusts the carbon/nitrogen ratio for more favorable decomposition and reduction in nitrogen (ammonia) losses. The following composting process parameters are discussed at length in the sections below: • Materials Balance • Solids Content • Process flow • Temperature • Oxygen Content • Aeration Rates • Carbon to Nitrogen Ratio III FACILITY APPLICATION FOR TYPE 4 SOLID WNA SECTION 3- MATERIALS HANDLING AND MIXING PROCEDURES 2.2 Material Balance The materials balance is necessary to define the equipment, space requirements, materials handling, and manpower needs Of the facility. The average mix calculations and the mass and volume balance is shown below in "fables 2-1 & 2-2. This materials balance is based on data showing that the facility could be expected to receive approximately 645 wet tons per week or 129 wet tons per operating day based on five operating days per week. The primary materials to be composted received regularly each week include biosolids cake (18 percent solids), shampoo/body wash (5 percent solids), and woody materials such as pallets, yard waste and sawdust ranging from 60 to 84 percent solids. Secondary materials generated seasonally include manure bedding, food wastes and carbon black at much smaller arnounts. From the mass balance, it can be seen that the facility is expected to produce 221 cubic yards or 110 tons of compost per day. 42 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION 2-- COMPOSTING PROCESS TABLE 2-1 Compost Mix Calculations Carolina Composting - Based on 5-Day-per-Week Average Moisture Bulk Organic Nitrogen C:N Ratio %°f Mixture Approx. %of Mixture Ingredient Content Density Carbon Weight volume Volume N (lblcy) (%dw) (%dw) (CY) Ammonium Chloride ------ 10% 4800 50% mixed with wood Flour 82 400 1 10.0 0.1 Shampoo/Body wasli 40% 40% mixed with wood Floor 85 700 10.0 0.1 0.1 8400 Biosolids 82 100 40.0 7.6 5.3 14% 1200 6% Wood waste (pallets) 16 200 47.0 0.4 123.7 7% 1200 13% }ardwaste 40 20 44.0 0.8 55.0 7% 240 9% Activated lime dust 0.0 200 50.0 0,0 0.0 1% 2400 5% Food wastes 80 1400 50.0 3,2 15.6 0% 120 0% Manure bedding 12 225 40.0 0.3 133.3 0% 120 1 Calculated Moisture Content of Mix Calculated GIN ratio of Mix 31.1 55 to 65 25 to 30 Calculated Bulk Density of Mix 629.5 Ibs/CY 600 to 800 Weight of materials 209 tons Pre -mix volume of materials 664.0 Ibs/CY Volume reduction during mixing 20% Post -mixing volume of materials 531.2 Ibs1CY Post -mixing bulk density 800-1000 Ibs/CY 43 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Carolina Composting — Based on 5 day per week average Characteristics Calculated moisture content of mix o.SS°i Calculated C/N ratio of mix 31.1% Calculated bulk density of mix 629 lb/CY Past -mixing bulk density 787 Ib/CY Ingredients Volume (tons/mo) Volume (CY) Ammonium Chloride mixed with wood flour 400 4900 Shampoo/Body wash mixed with wood flour 700 9400 Tank bottoms mixed with wood flour 640 7680 Non -Hazardous sludges mixed with wood flour 160 1920 Petroleum contact waters mixed 160 1920 Activated lime dust 200 2400 Biosolids 100 1200 Pallets 200 2400 Yard waste 20 240 Food waste 10 120 Secondary materials 60 720 44 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMP05TING PERMIT WIJITEVILLE NORTH CAROLINA SECTION 2- COMPOSTING PROCESS The materials balance is based On an average of the materials anticipated. Two (2) important issues should be remembered: • If the biosolids appear to be wetter than usual, the amount of wood chips or other bulking agents in the Inix will need to be increased. • The supervisor will determine (lie need for adding additional bulking agent to achieve a satisfactory mix (40-50 percent total solids), using the materials balance as a guideline. This material balance represents the daily average blend for the annual average blend. Carolina Composting adjusts based on feedstock availability. Regardless of the feedstocks input: • The pile temperature must be maintained at a minimum of 55°C (131°F) for 15 days to kill pathogenic organisms and qualify as a process to further reduce pathogens (PFRP). During the high temperature period the windrow shall be turned at least five times. The pile temperature must average of 45°C (1 137) or above, with no readings below 40°C (I04oF), for 14 days to reduce vector attraction. Refer to Section 3.5 for mixing procedures. 2.3 Solids Content The biosolids/bullring agent mixture must contain sufficient voids or air space to allow for air to flow through the entire mass of composting materials. The voids in the mixture will be filled with water or air. When voids are filled with water, airflow is restricted, and anaerobic zones develop in the mixture. Ithas been established through operational experience at other biosolids composting facilities that the solids content of the mix should be in the range of 40% to 45% to assure sufficient airflow. At solids content below 40%, aeration will be slowed, and this can lead to the development of odor problems (malodors). In addition, low temperatures could develop in the compost pile as a result of inadequate aeration. Solids contents above 65% will inhibit microbial action due to lacy of moisture. The quantity of bullring agent required to achieve a solids content in the mixture above 45% is excessive considering that little gain in process performance occurs. Bullring agents or amendments are added to the biosolids and other wet wastes prior to composting for four (4) main reasons: 1. To increase the solids content of the biosolids; 2. To increase the porosity of the biosolids; 3. To add structural stability for stacking the biosolids; and 4. To increase the Carbon to Nitrogen (C:N) ratio. 45 FACILITY APPLICATION FOR TYPE A SOLID WASTE COMPOSTING PERMIT WHIT£VILLE NORTH CAROLINA Typically, dewatered biosolids and sludges are a sticky, pasty, gelatin -like material with relatively little pore space. h1 order to prepare them for aerobic composting, a bulking agent of some type is added to create a mixture that will compost effectively. Many different materials such as wood chips, pine bark, leaves, shredded paper, and shredded rubber tires can be used as bulking agents. However, the effects of different bulking agents on the four (4) items listed above, on product quality, and on their relative costs must be taken into account when selecting a bulking agent. Wood waste and yard debris at the Carolina Composting site are used as the primary bulking agent. Waste hay, yard waste, or similar can also be used as a supplemental bulking agent in the process. 2.4 Process Flow Diagram Figure 2-2 shows the process flow diagram of the composting facility. This figure should be referenced as the process flow is described. The basic steps in the composting process are as follows: 1. Dewatered biosolids cake is generated at the City's WWTP and hauled to the Compost Facility in trailer trucks three (3) days per week. Normal operation is to mix biosolids as it arrives at the compost facility. Iowever, this asphalt active composting pad can be used to store at least one (1) days production of dewatered biosolids cake. 2. An operator using a front-end loader (FEL) will load the correct amount of amendment (determined by the solids content of the biosolids and amendments). The FEL is used to build approximately two rows each week depending on the volume of incoming material. The row should be turned 3 to 5 times with the Frontier Windrow Turner to help thoroughly blend the different feedstocks and initiate the compost process. 3. Windrow temperatures, moisture levels and weather conditions are monitored and recorded daily. These criteria help establish when subsequent turnings will occur. Detailed descriptions of procedures and recordkeeping can be found in Chapter 7. 4. After PFRP requirements as stated in 15 A North Carolina Administrative Code 13B Section 1408 are met (minimum temperature of 13 PF for 15 days, turned 5 times), windrows are turned periodically to help maintain temperatures. As space is needed rows are moved by FEL from the asphalt pad within the active composting area to the finished compost/maturation area for further curing. 5. Finished compost will be screened. Screened compost volumes will be determined by the end use demand. Agricultural land application will sometimes be done immediately after composting is completed without total screening. The screened ovens material is recycled and placed in the recycle storage area and used for re -use in mixing. The compost is transferred by a FEL to the finished product storage and maturation area. 46 FACILITY APPLICATION FOR TYPE 4 SOLID WASTL COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA SECTION 2-COMPOSTING PROCESS 31 Screening Inspection & _..., Contaminant 437 cylday 95 cylday 1 532 cylday 4Ad0372cy1day40A#4# Secondary Windrow Primary Windrow (30-90 days curing) Composting (28 days) ? 1 cylday .41 Finished Compost F[GURE2.2 Process Flow Diagram {Based on 5 Days per Week Daily Design Volumes} 221 cylday ° 7o Market 47 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE. NORTH CAROLINA SECTION 2- COMPOSTING PROCESS 2.5 Temperature The high temperatures generated during composting are the result of aerobic biological activity. As the microorganisms break down the organic matter in the compost pile, energy in the form of heat is released. This heat plays an important part in the composting process. The temperature of the composting mass is a very important parameter, and it affects the following aspects of the operation: O Temperature is important in killing disease causing organisms (pathogens); • Temperature affects the rate of decomposition of the feed materials; ® Temperature affects odor production; • Temperature promotes evaporation of water, and Temperature is important in killing weed seeds. Biosolids and some food wastes can contain human pathogens such as bacteria, parasites, worms, and viruses. These pathogens, however, are killed when exposed to high temperatures over a given period of time. Studies have shown that if the temperature in the composting pile reaches 55°C (131°F) for a period of three (3) consecutive days or more, pathogens are destroyed. This temperature target is easily achievable during the composting process. The following USEPA and requirements as stated in 15 A North Carolina Administrative Code 13B Section 1408 are met for the composting process and must be documented at the facility: • The pile temperature must be maintained at a minimum of 55°C (13loF) for 15 days to kill pathogenic organisms and qualify as a process to further reduce pathogens (PFRP). During the high temperature period the windrow shall be turned at least five times. The pile temperature must average of 45°C (113°F) or above, with no readings below 40°C 004°F), for 14 days to reduce vector attraction. Biosolids contain organic materials. These materials are broken down and stabilized by various microorganisms. Temperature plays an important part in the rate at which the organic matter is broken down or stabilized. Stabilization is important since unstable biosolids can produce malodors. The ideal temperature range for growth of these organisms is between 45°C (113°F) and 60°C (140°F). Temperatures higher than 65°C (150°F) can slow the composting process. The decomposition of organic material in the biosolids and other solids will produce odors, especially if the oxygen concentration drops below a critical level. Composting is aimed at destroying putrescent (odor causing) compounds. The rate of breakdown, therefore, is important and this rate is controlled by temperatures. Furthermore, at high temperatures, new compounds, which produce odors, are generated. 48 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA It has been shown that in some cases high temperatures (above 65°C) have been a cause of odor problems. The operator, therefore, should attempt to maintain pile temperatures as near to 55°C (1310F) as possible by turning each pile throughout the composting process. 2.6 Oxygen Content There are two (2) important terms in composting with regards to oxygen content: aerobic (presence of oxygen) and anaerobic (absence of oxygen). Composting of sludges or biosolids will be done under aerobic conditions. This is extremely important since aerobic conditions will make the rate of stabilization of organic matter in composting more rapid; thus, resulting in less odors. The amount of oxygen provided to the mix controls the amount of oxygen available to the microbes; and thus, their activity. An insufficient supply of oxygen will result in reduced microbial activity, which in turn will result in a reduction in temperature of the mass. The windrow systern used at this facility should be operated to provide oxygen in the range of 5% to 20%. If the oxygen level drops below 5%, anaerobic conditions (lack of oxygen) in the compost pile can be expected. This condition will slow the composting process, lower pile temperatures, and could also produce malodors if it is maintained for any length of time. Monitoring of oxygen content of the composting pile is not a routine need but may be undertaken in the event of problems with temperatures and odors. 49 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA 2.7 Carbon to Nitrogen Ratio (C:N) In practice, the carbon -to -nitrogen (C:N) ratio is not measured because effective and timely composting can occur over a wide range of C:N ratios. Also, the bullring agent (wood chip/recycled chips) biosolids mix will generally result in a satisfactory C:N ratio when mixed with biosolids to meet the moisture content required for the process. A C:N ratio in the range of 26:1 to 31:1 is optimal for rapid microbial activity. Higher C:N ratios tend to result in slower microbial activity and can cause lower temperatures in the compost pile. Lower C:N ratios can result in the accumulation of free nitrogenous compounds (ammonia) that may volatilize and be lost from the compost, thereby reducing the nitrogen content of the compost. While this is not detrimental to the process, the fertilizer value of the compost is reduced by loss of nitrogen. In addition, ammonia odors may develop during the composting process if the C:N ratio is too low. If bulking agents other than wood chips are used, the effect on the C:N ratio must be considered and accounted for. This may require an adjustment in the mix ratio of bullring agent to biosolids. At the Carolina Composting facility, the amount of wood chips and recycle chips added to the mixture should be ample enough to provide enough available carbon to adjust the C:N ratio to within the desirable range, The C:N ratio for the various feedstock materials and an average mix has been developed in Table 1 based on laboratory measurements of these materials or estimates based on data found in the literature. A calculated C/N ratio for the average quantities of materials to be composted at Carolina Composting is approximately 31 to 1 which is in the optimal range. 50 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT W HITEV€LLE NORTH CAROLINA Materials Handling and Mixing Procedures 3.1 Introduction Proper handling and blending of materials at the start of composting is vital to ensuring the success of the process. Inattention to proper receiving and storage of raw materials can lead to odor and product contamination issues Y Incoffect proportioning may cause process problems and render the product unsuitable for use. • Poor blending will reduce product quality and can increase odor production. As in any industrial process, it is vital to control the types, proportioning and blending of the raw materials to ensure a safe and high- quality end product. 3.2 Biosolids Receiving Dewatered biosolids cake is generated at local WWTPs and hauled to the compost facility. The facility nominally receives one or two truckloads per operating day. The facility w i 11 r e c e i v e approximately 20 tons per week. There is adequate storage capacity for biosolids at the facility. 3.3 Bulking Agent Storage An area at the compost site provides storage for pallets, yard waste, and similar bulking agents that are received. This storage area provides up to 340 days of storage capacity for bulking material. 51 FACILITY APPLICATION FOR TYPE 4 SOLId WASTE COMPOSTING PERMIT WHi7EVILLE NORTH CAROLINA SECTION 3- MATERIALS HANDLING AND MIXING PROCEDURES The following are the materials anticipated to be used as bulking agents: • Wood waste; Yard waste; Y Manure bedding waste • Recycled btilking agent 3.4 Mixing Proper mixing is essential to the functioning of the composting process. The operator has control over the mixing process and attention to detail is worth the effort. The function of mixing is to intimately combine the biosolids, food wastes and bullring agents to create a compostable mass. The ratio, as well as the method of combining the biosolids and bullring agent, will affect the physical properties of the mixture. The goal of mixing is to control the solids content of the mix and to create a mass that is sufficiently porous to allow air to flow through it. The mix must possess structural integrity sufficient to maintain porosity when built into the compost pile. In addition, mixing provides for the dispersal of the biosolids throughout the mass to expose maximum biosolids surface area to the decomposing organisms. 3.4.1 Mix Solids Content The composting mass is a mixture of biosolids, wood waste, mulch, and recycled bullring agent. Interspersed within the mixture are pores of varying sizes, shapes, and continuity. Depending upon the solids content of the mix, the pores will be filled with water and air in various relative amounts. The lower the solids content, the greater the percentage of pores filled with water. Lower solids contents will tend to result in restricted air movement compared to higher solids contents. To ensure aerobic conditions (the presence of adequate oxygen) and sufficient potential for airflow to aid in drying of the mass, mixing operations must be controlled to provide a mix solids content of between 40% Total Solids (TS) and 50% TS. Both the biosolids and bulking agent solids contents affect the solids content of the mix. A change in solids content of the biosolids will require a change in the amount of bulking agents to be used. Mix solids contents below 40% will restrict airflow and oxygen transport and increase the occurrence of anaerobic zones in the mass. This should be avoided. 52 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITFVILLE, NORTH CAROLINA 3.4.2 Mixing Process Description Before mixing, it is essential to estimate the amount of biosolids, sludge, food wastes and bulking agents to be used in the batch of mix to be produced. In all of the mixing methods to be discussed below, all or a portion of the bullring agent must be prepared first before adding the biosolids, sludge or food wastes. The reasons for this vary with the mixing method employed. This is discussed in greater detail below. As bulking agents used or the biosolids increase in moisture content, the ratio of bullring agent to solids will increase. Conversely, as moisture contents decrease, the Bulking agent to solids ratio will decrease, Variations in the solids content for any of the constituents of the mix will cause the above proportions to change. The mix ratio is determined by perforining periodic solids analyses on each batch of compost to ensure the initial mix is within the 40% to 50% TS range. A calculation should be used to determine the mix solids content when solids contents for the constituent parts of the mix vary from those shown in the materials balance provided in Chapter 2. 3.4.3 Mixing Methods- Manual Mixing with Front End loader and Excavator The general process is to place down layers of constituent materials according to the step- by -step procedures below, for construction of the pile, and once on the ground to turn over the materials several times with the FEL until a blend is created. Step -by -Step procedures for manual mixing with the FEL: 1. Determine the volume of biosolids, sludge and food wastes to be mixed. This is estimated from the volume of the FEL bucket and the number of buckets to be mixed at one time, typically one (1) to two (2). 2. Check and log solids content for the biosolids. This information should be provided by the staff of the dewatering operations at the WWTP. 3. Determine the volumetric mix ratio of each constituent using the solids contents and the bulk density of the constituents as estimated in the materials balance or measured in the field. 4. Using the FEL place a bed of one (1) of the bullring agents one (1) to two (2) feet high and approximately one (1) FEL bucket width wide. 5. Place biosolids, sludge and food wastes on top of the bullring agent bed with the FEL 6. Place the remainder of the needed bulking agent over the top of these wet materials. 7. Pick up and drop the constituents several times with the FEL bucket. 53 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA 8. Continue mixing with the FEL until a thorough blend is achieved. The row should be turned from 3 to 5 times to help thoroughly blend the different feedstock materials. 9. Visually inspect the niix for thorough blending. A good mix will be uniform in color, have all the bullring agent coated with biosolids and should have no balls or clumps larger than 4" in diameter. 10, Place the mixture into the compost pile and repeat the process. 54 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA SECTION 4 Composting 4.1 Introduction The biosolids composting unit process is the heart of the composting facility. Windrows are built at the site. Windrows are 600 feet long with a height of eight feet and a 15-foot base. Total volume per windrow is 1780 cubic yards. The mixture is composted for approximately 28 days during which time pathogen kill and vector attraction reduction temperature requirements are met. The biosolids and sludges are also stabilized and dried out during the process. 4,2 Compost Pile Building Incoming materials are deposited at designated areas and stockpiled within the compost yard until rows are built. Bulky materials such as yard debris, pallets, hay, and other feedstocks are constructed. A frontend loader is used to build approximately two rows each week depending on the volume of incoming material. The row is turned 3 to 5 times with the front-end loader to help thoroughly blend the different feedstocks in the row and initiate the compost process. 4.3 Turning Composting is a controlled aerobic process that results in the partial decomposition and stabilization of organic materials by the action of microbes. For composting to occur properly, the mass must be effectively aerated. In the windrow composting method, effective aeration is accomplished both by the addition of bulking material and by turning of the windrow. In order for the composting process to qualify as a PFRP, a temperature of 131°F or greater shall be maintained in the windrow for at least 15 days, during which time the pile is turned several times. After these requirements are met, windrows are turned periodically to help maintain temperatures. 4.4 Pile Monitoring & Data Recording Windrow temperatures, moisture levels and weather conditions are monitored and recorded daily. These process parameters help establish when subsequent turnings will occur. These records will ensure PF" or a minimum temperature of 131°F for at least 15 days and tuned 5 times is completed. As space is needed or when the active composting is finished, rows are moved from the asphalt pads to the clay pad for further curing. When a compost test fails to meet Federal pathogen and vector requirements (40 CFR), which imposes a potential threat to the public health and the environment, the facility shall report the failed testing result to the division within 72 hours after receiving the testing result(s). Distribution of the compost products must stop until a further test conf inns that the batch of re -composted products have met the federal safety standard. In addition to the regulatory requirements, monitoring the 55 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMl7 WHITEVILLE NORTH QROLINA compost pile temperature provides a means for checking on how the process is working. Temperatures are taken daily at 4 places along the windrow with a long stem thermometer. Moisture will be checked as needed by the squeegee test. Each row position is numbered one thru eleven. Subsequent rows built in a position will receive a letter footnote (1,1A, 1S, etc.) This identification will help with sampling and testing results. 4.5 Maturation and Storage Typically, windrow curing will continue for another 3 to 90 days after primary composting. Curing can be done before or after screening, although curing before screening will allow further breakdown of the materials into compost. During pile teardown, compost can be contaminated with pathogens from the front-end loader bucket. In the event the same front-end loader is used to handle the initial mix, the bucket should be cleaned of any visible biosolids before it is used to tear piles down or move compost to screening, curing, storage, or distribution. Repeatedly picking up and Dumping fresh bullring agent will scour out most of the residual biosolids. Shovels may also be used to remove visible traces of biosolids, leaving the bucket clean enough to handle compost. 56 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHIITEVILLEN_O,RTH CAROLINA SECTION 5 Screening Procedures There are currently no screening procedures in place. UFA FACILITY APPLICAT[ON FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WH[TEVILLE, NORTH CAROLINA SECTiON6 Maturation and Storage 6.1 Introduction The maturation process is an extension of the composting process, The purpose of maturation is to provide additional decomposition to achieve a mature and stable end product. During maturation, decomposition occurs at a slower rate than composting at mesophilic temperatures. 6.2 Maturation and Storage Pile Building After screening, front- end loaders are used to [hove the compost to the maturation and storage area, The buckets on the front-end loaders are cleaned between handling of feedstocks and immature compost. Maturation will take place for an additional period of between 30 and 90 days. 58 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SLCTION7 Sampling, Testing and Record Keeping for Quality Assurance 7.1 General Sampling and testing at the composting facility are necessary to: • Monitor the process efficiency; • Provide data for regulatory agencies; and • Provide data for troubleshooting when problems develop. It: is extremely important that all sampling and testing be done at representative points in the process in a consistent manner. The data that results from any sampling and testing program is only as good as the collected sample. Sampling should be done in a consistent manner, on a regular basis, and using specific techniques. This section outlines the sampling schedule to be used and the sampling and testing procedures required for a successful sampling and testing program. The operator should make every effort to perform sampling in a consistent routine, according to these guidelines. Deviation from these guidelines should only be made under unusual circumstances after obtaining the approval of the Facility Manager and in accordance with 15 A North Carolina Administrative Code 13B Section .1408. When a compost test fails to meet Federal pathogen and vector requirements (40 CFR), which imposes a potential threat to the public health and the environment, the facility shall report the failed testing result to the division within 72 hours after receiving the testing result(s). Distribution of the compost products must stop until a further test confirms that the batch of re -composted products have met the federal safety standard. 7.2 Sampling and Testing Schedule The sampling and testing performed at the Carolina Composting facility is in accordance with 15 A North Carolina Administrative Code 13B Section .1408. • A composite sample of the compost produced at each compost facility shall be analyzed at intervals of every 20,000 tons of compost produced or every six months, whichever comes first, for test parameters required. The parameters include foreign matter, arsenic, cadmium, chromium, copper, lead, mercury, nickel, selenium, zinc, pathogens and Total nitrogen (Total N required for products containing sludge subject to 40 CFR 503). fib FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA • Sample collection, preservation, and analysis shall assure valid and representative results pursuant to a Division -approved quality assurance plan. At least three individual samples (of equal volume) shall be taken from each batch produced in separate areas along the side of the batch. Each san-piing point shall be at a depth of two to six feet into the pile from the outside surface of the pile. Samples that have been analyzed for metals shall be composited and accumulated over a six-month period or at intervals of every 20,000 tons of product produced, whichever comes first. Any sample collected for testing for pathogens and nutrients shall be a representative composite sample of the compost and shall be processed within a period of time required by the testing procedure. • Compost containing sewage sludge shall be tested in accordance with 40 CFR 503, Subpart B. Foreign matter content shall be determined by passing a dried, weighed sample of the compost product through a one -quarter inch screen. EPA Method 160.3 shall be used to dry the sample. The material remaining on the screen shall be visually inspected, and the foreign matter that can be clearly identified shall be separated and weighed. The weight of the separated foreign matter divided by the weight of the total sample shall be determined and multiplied by 100. This shall be the percent dry weight of the foreign matter content. 7.3 Grab Sampling 7.3.1 Grab Sample Definition Grab samples are samples that are collected at one (1) particular time, in one (1) particular location of a certain process. Analysis from this type of sample will provide results from a random portion of the process stream (i.e. biosolids, mix, etc.) being sampled. hi order to achieve a more representative analysis of a given process stream, many grab samples can be collected at various times and analyzed individually, or these grab samples can be combined into one (1) large sample for an analysis known as a composite sample. 7.3.2 Grab Sampling Procedure Grab samples should be collected using a clean, dry sampling jar (one (1) pint glass or plastic) or sterile zip lock baggies. The sample should be collected at a point in the material to be sampled that is homogeneous (completely mixed) and representative of the batch of material that is being sampled. Each grab sample collected should be approximately the same volume as previous grab samples. 60 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA 7.4 Composite Sampling 7.4.1 Composite Sample Definition Composite samples are a mixture of grab samples that are collected individually at various times at the same location in a certain process or a mixture of samples that are collected individually at various locations in a certain process. Grab samples should be immediately transferred to a composite sample container for storage. These types of samples generally provide a more representative sample for analysis than does a grab type sample because it will reflect variations in the process. 7.4.2 Composite Sampling Procedure Composite samples should be stored in a clean, dry sampling jar (one (1) gallon or larger) with an air -tight, screw -on lid. The sampling container should be appropriately marked and stored in a cool, dry place, out of direct sunlight, preferably a refrigerator. At the end of the day, after the last grab sample is added to the composite jar, the composite sample should be well mixed and a representative portion placed in a smaller sampling jar (one (1) pint) or zip lock baggie for analysis. The sampling jar should be covered with an air -tight lid and stored in a refrigerator until it is delivered to the laboratory for analysis. Analysis should be performed as quickly as possible, preferably within 24 hours after collection. The sample jar should be adequately labeled with sample name, date of collection, and the operator Is name. 7.5 Sample Testing Procedures 7.5.1 Transfer of Samples After all compost samples have been collected as outlined in Sections 7.1 through 7.3, the sealed sample containers should be taken to the laboratory for analysis as quickly as possible. There, qualified, experienced technicians should perform the required analyses as outlined in Section 7.1. Soil Control Labs is the current laboratory used by Carolina Composting. 7.5.2 Total Solids Content Samples that must be analyzed for solids content (percent total solids) should be analyzed as follows: Measure tare weight of empty sample drying dish. Ensure sample container contents are homogeneous by mixing with a rod or paddle. Place approximately 20 grams or more of the sample in the sample -drying dish. When measuring initial mixes, unscreened compost or bulking agents, a larger sample of approximately 100 grams will be required for better accuracy. Record weight of sample drying dish with sample. Place sample dish in a controlled drying oven at 221 °F (105°C). Remove sample container after 24 hours and place in an enclosed desiccator to cool. Reweigh sample after it has cooled to room temperature. 2 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA Determine percent total solids of material using the following formula: %TS = 1- NYB-WA) x 100%TS � percent total solids WB = weight of sample before drying (minus tare weight) WA = weight of sample after drying (minus tare weight) 7-3SECTION 7- SAMPLING, TESTING, AND RECORD KEEPING FOR OLIALITY ASSURANCE 7.5.3 Volatile Solids Content The volatile solids content (percent volatile) of the biosolids or other materials can be determined using the following procedure: 1. After obtaining a weight of the dried material in 7.5.2, place material in a controlled muffler furnace at 1022°F (550°C). Note: Caution should be used if analyzing bullring agents for volatile solids content as the materials may ignite. 2. Remove sample container after 24 hours and place in an enclosed desiccator to cool. 3. Reweigh sample after it has cooled to room temperature. 4. Determine percent volatile content of material using the following formula: %Volatile= WB-WA) x 100%. 7.5.4 Coliform, Salmonella, and Metals All samples to be analyzed for coliforms, and metals should be analyzed according to the US Composting Council's Test Methods for the Examination of Composting and Compost (TMECC) procedures. 62 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA 7.6 Operational Record Keeping Procedures Keeping accurate records is an important part of the operation of any composting facility. Proper records are necessary for the Facility Manager to monitor the performance of the facility and to make operational decisions. Of great importance is the establishment of a reliable continuing record for proof of performance, thus justifying operational decisions, expenditures, and recommendations. Daily operational records also provide information useful in process adjustments required due to climatic or seasonal changes or other recurring problems of a specific nature. This information is useful to employees of the facility, as well as to operators of other facilities who may have related problems. Records and reports also provide valuable information for release in public relations efforts, as well as legal reference should a lawsuit or other action be threatened. Accurate records also provide the basis for planning future plant expansion, planning future modifications, establishing and adjusting operating budgets, and providing evidence of performance in compliance with regulatory agencies. State and Federal regulatory agencies require record keeping on a continuing basis, which allows them to determine the facility efficiency and the effectiveness of the treatment in achieving the desired standards. Personnel from North Carolina Division of Waste Management make periodic visits to treatment facilities and during these inspections a review of operational and other records may be requested. Records must be kept on hand for five years. Therefore, an accurate set of records is necessary and useful to the Facility Manager, operators, and others who are interested in the performance and operation of the composting facility. When a compost test fails to meet Federal pathogen and vector requirements (40 CFR), which imposes a potential threat to the public health and the environment, the facility shall report the failed testing result to the division within 72 hours after receiving the testing result(s). Distribution of the compost products must stop until a further test confirms that the batch of re -composted products have met the federal safety standard. 63 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION 7- SAMPLING, TESTING, AND RECORD KEEPING FOR QUALITY ASSURANCE 7.6.1 Types of Records Records can generally be divided into three (3) categories: O Administrative and physical plant records; Maintenance records; and • Operational records. Administrative and physical records include information such as cost and budget information, manpower and personnel records, safety records, as -built drawings, and specifications. Maintenance records include manufacturer's information and equipment maintenance records, maintenance costs, and parts inventories. Operational records include daily and monthly operating reports as well as analytical results. While the administrative and maintenance records are important and necessary, this section of the O&M Manual will only address the operational records used at the Carolina Composting facility. The minimum record requirements in accordance with 15 A NCAC 13B Section. 1408 (b) are as follows: 1. Daily operational records must be maintained, which include, at a minimum, temperature data (length of the composting period) and quantity of material processed; 2. Analytical results on compost testing; 3. The quantity, type and source of waste received; 4. The quantity and type of waste processed into compost; 5. The quantity and type of compost produeed by product classification; and 6. The quantity and type of compost removed for use or disposal, by product classification, and the market or permitted disposal facility. 64 FACILITY APPLICATION FOR TYPF 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE, NORTH CAROLINA 7.7 Annual Reporting Record Keeping Procedures An annual report for the period July I to June 30 shall be submitted by all facility owners or operators to the Division of Waste Management by August 1st and shall contain: 1. The facility name, address, and permit number; 2. The total quantity in tons, with sludge values expressed in wet and dry weight, and type of waste received at the facility during the year covered by the report, including tons of waste received from local governments of origin; 3. The total quantity in tons, with sludge values expressed in dry weight, and type of waste processed into compost during the year covered by the report; 4. The total quantity in tons and type of compost produced at the facility, by product classification, during the year covered by the report; 5. The total quantity in tons and type of compost removed for use or disposal from the facility, by product classification, along with a general description of the market if for use during the year covered by the report; 6. Monthly temperature monitoring to support Rule .1406 7. Results of tests required in by Rule .1408. Yearly totals of solid waste received and composted shall be reported back to the local government of origin for annual recycling reporting. 65 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE NORTH CAROUNA SECTION S Troubleshooting Procedures 8.1 General Table 8-1 below describes some common problems at composting facilities and corrective actions for these problems. TABLE 8.1 Common Problems and Corrective Actions PRQBI^laM G�OIiRECTIbE4CTION - Compost pile temperatures too 1. Mix more frequently. high (>70°C) 2. Poor air flow through pile. Poor mixing would most likely cause this. Check moisture content and add more bulking agent and remix, if needed. Compost pile temperatures too 1. Insufficient amount of new bulking agent; add more bulking agent to the low windrow andre-mix. Blinding/clogging of screen 1. Solids content too low; pile material in drying space and turn with windrow turner until solids content is >55 percent. Odors coming from paved area 1. Possible ponding of leachate around debris; clean paved surface. 2. Possible collection of debris in catch basins; remove and clean catch basin debris baskets. Rain run-off ponding around 1. Possible ponding may occur during periods of short -duration, heavy rain; catch basins however, if this remains, check catch basins for clogging debris. Blowing dust 1. Clean area around screen. 2. If coming from finished compost stockpiles, wet piles. Equipment Breakdown 1. All preventative maintenance, minor repair, and replacement of ware parts will be done on site by our personnel. 2. Rental equipment will be obtained if necessary. 3. All major repairs will be done by a certified service technician. Fire 1. Use fire extinguisher on -site. 2. Contact local fire department. Unusual traffic conditions 1. Modify schedule of operation to avoid. M. FACILITY APPLICATION FOR TYPE A SOLID WASTE COMPOSTING PERMtT WHITEVILLE NORTH CAROLINA SECTION 9 Health and Safety 9A General Municipal wastewater biosolids contain pathogens. Composting, if carried out properly, will destroy pathogens. The following are some general recommendations for the health and safety of workers at the Carolina Composting facility. 9.2 Personal Hygiene The following personal hygiene recommendations should be stressed as common practices to all compost facility employees. • Wash hands before eating, drinking, or smoking. - Food should not be eaten or stored near biosolids. Do not drink from plant hoses. • If heavily contacted with biosolids, immediately take a hot shower and put on clean clothing. The supervisor should be notified. • It is recommended that showers be taken each day and hair be washed prior to leaving the plant site. • All employees working at the compost facility trust wear protective clothing, i.e. uniforms and/or coveralls, and safety shoes. - Change from protective clothing to street clothing at the end of each day. Soiled, protective clothing should not leave the premises. • Goggles, dust masks, and hard hats must be available and should be worn by employees working in the mixing and screening areas. - Wash, disinfect, and bandage ANY cut, no matter how small. Any break in the skin can become a source of infection. Change bandages frequently and wear protective clothing over the wound. - Keep fingernails closely trimmed and clean (dirty nails can harbor pathogens). It is also recommended that tetanus, diphtheria, hepatitis, polio, and typhoid inoculations be given. Records of inoculations should be kept on file for each employee. Individuals who are highly debilitated or have severe allergies or asthma should not be employed to work around compost facilities. 67 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA 9.3 Personal Protective Equipment Personal Protective Equipment (PPE) must be evaluated as to the level of protection necessary for particular operating conditions and then made available to facility employees. The list below includes the PPE typically used and/or required in a compost facility workplace: • Uniforms and/or coveralls • Safety shoes with steel toes and non -slip shoe soles • Eye protective goggles and dust masks should be worn, particularly in the screening areas • Hard hats • Noise reduction protection should be used in areas where extended exposure to continuous high decibel levels are expected • Disposable rubber latex or chemical resistant gloves for handling and/or sampling of biosolids. • Dust filter masks Following use, PPE's should be disposed of or adequately cleaned, dried, and readied for reuse. 9.4 Electrical and Mechanical Equipment Hazard Prevention The materials handling equipment in the screening and mixing areas should be operated with care and caution. Only qualified electricians or instrumentation specialists should be allowed to service or troubleshoot these devices to prevent accidental injury by electrical shock. 9.5 Employee Health and Safety Training Carolina Composting personnel must recognize and understand the potential health and safety risks associated with routine job activities in the various process stages of composting. Facility personnel must be kept updated and aware of operational procedures through the use of periodic training sessions to remind them of the safety requirements specific to their job profiles in accordance with the facility -specific health and safety plan. Some general safety rules are: Make sure that you understand the job that has to be done. Review the facility equipment O&M Manual prior to attempting repairs/changes. Use common sense when attempting a job, Use the safest way to get the work done, including using the proper equipment and tools. 68 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT WHITEVILLE, NORTH CAROLINA • Use the buddy system in case of repair of electrical or mechanical equipment (have a co- worker stand guard and remember to properly lock and tag equipment at the main control panel to inform people that you are working on equipment remotely). Keep the right attitude towards safety. Lack of awareness or a careless attitude can lead to accidents. Make sure you know where the first aid kit and fire extinguishers are located. Understand how to use the first aid kit. 69 FACILITY APPLICATION FOR TYPE 4 SOLID WASTL COMPOSTING PERMIT WHITEVILLE NORTH CAROLINA SECTION 9- HEALTH AND SAFETY 9.5.1 First Aid In addition to general health and safety protocol, it is recommended that all facility employees receive both first aid and cardiopulmonary resuscitation (CPR) training. American Red Cross can provide this training in group settings or a representative can be appointed to receive teaching certification and offer the courses to the compost facility personnel. Standard first aid is required to be update every three (3) years, whereas CPR refresher training is conducted on an annual basis. At the composting facility, portable first aid kits and stations should be strategically located and accessible around the facility and all personnel should know immediately where the nearest station is located. 9.5.2 Fire Extinguisher Potential fire hazards at a compost facility are created from the build-up of fine dry dust particles on and around operational motors and control panels. The presence of these build- ups can cause overheating and potential fire if continuous site cleaning and maintenance are not practiced. Portable fire extinguishers should be maintained in a state of readiness at several locations throughout the compost area, particularly near the screening and mixing equipment. The annual inspection of facility fire extinguishers provides a good opportunity for fire extinguisher training and refresher practices. 9.5.3 Physical Exposure Facility personnel who may corne in contact with physical exposures on the job should be kept aware of the health aspects associated with the fluids, solids, and airborne constituents found at composting facilities. Training concerning safe work practices around these potential exposures should include recommended protective equipment and proper disposal procedures. 9.5.3.1 Biosolids Training in the handling, sampling, and processing of biosolids should be made available upon the initial assignment to an area where the potential exposure exists. Pathogens exist in wastewater treatment plant operations and composting, when performed correctly, is one (1) method used to destroy this potential exposure. Pathogens from biosolids are likely to enter the body through the nose, eyes, or mouth. For this reason, personal hygiene, PPE, first aid, and eyewashes are the most effective safety aspects necessary to reduce the potential exposure to pathogens through contact with biosolids. 70 FACILITY APPLICATION FOR TYPE 4 SOLID WASTE COMPOSTING PERMIT, WHITEVILLE, NORTH CAROLINA 9.5.3.2 Bioaerosols Like the procedures to be followed under contact with biosolids, bioaerosols are airborne microorganisms that can enter the body in the same locations. Bioaerosols can become airborne during mixing, aeration, and screening of composted materials. Once airborne, bioaerosols may be inhaled or contact the eyes, Dirty hands also may result in inadvertent transmission to the mouth or eyes. Facility employees should refer to Sections 9.2 Personal Hygiene; 9.3 Personal Protective Equipment; and 9.5.1 First Aid for reminder infort-nation on Health and Safety. 9.5.3.3 Dust Excessive dust can be a health hazard as a result of its irritating effect on eyes and mucous membranes if proper PPE, such as eye protective goggles and dust filter masks, are not worn by all personnel in the affected areas. During periods of extremely dry weather, excessive dust can be controlled by sprinkling screening areas, conveyors, and facility traffic areas. Goggles and dust masks should be worn in' dusty conditions. 71 N Information and responses as required by North Carolina regulations governing the permitting of a Compost Facility. All references below refer to the Compost Facility Permit Application Guidance Document (attached) Section 1— General Information (1-3) All information regarding names, addresses, and phone numbers are included in the application. (4) Location of the facility is shown on Attachment 1 Section 2 —Siting Requirements 1) Parcel information shown on Attachment 1. 2) Legal description and deed are included in Attachment 2. 3) No zoning is applicable for the proposed site. 4) FEMA Flood Insurance map is shown on Attachment 3. 5) No wetlands shown on the subject site. 6) The proposed facility is not located on a closed disposal area. 7) Soil evaluation included in Attachment 4. Section 3 — Design and Operations Plan (1-28) Covered under the attached Design and Operations Plan. (24) No construction is proposed. Section 4—Signature Pages Attachment 5 Section 5 —Stormwater Discharge and Sedimentation and Erosion Control Plan Stormwater Documents are being submitted separately. Section 6 — Drawings Attachment 6 Note that there are no residences, wells, perennial streams, rivers, water bodies, other similar features within the designated distances from the composting area. Areas for loading, storage, grinding, composting, curing, and final product will be designated upon start- up of the facility. The attached maps do not indicate these areas. C- � YKeIKf t La;Recor]dsPro praperry�DlDss9 VIEW Frnuertr Card COX JOHATHAIME 110 LAKEVDE DA TAOORMY NG 29463 iYrew Ctatrmanl AMOuni: 06-00739 Acreage:00.17 OWN: 0163.04-51-O97S.000 0aRn `i YmatRural Residanlial i ! Yt�S-mod Deed'. 11461390 i Flat I Hls16ry 4 1146139D, I IM30-T2,1301MULIFE, �1 WA.UZ005-E-121 , 2361225 �4 Parcels ;t Platinformation ago M F10001 S +4pvck✓.,eri I Book 1146 Page 390 �I1�IIf1ll���l��l�llllll 2016006800 COLUMBUS Co, He FEE $26,00 STATE OF Me REAL ESTATE EXTX $200.00 pPliH�l�lRv�d i2-30-2018 0Z12:50 PM xANeANCE H. aULLOCK AVIS -D"" or. REmRA WMCfLU„O wfly BK: RB 1146 PG: 390-392 Excise Tax $ 200. t and P e Tax Lot No./Property No.: 10550 Does not contain r ma dwelling of Grantor/Farm & Timber Ian Parcel Identifier No. TAX INFORMATION REECREEVEO Mail after recording to Jonathan Kyle Cox 102 KkiaM Lone. BY IZT��P'��q Tabor City, NC 28463 This lostrument was prepared by Wright. Worlev.Pone, Ekster & Mossx'.f..l.,,C. Altorneys at 4,aw P.O. Box 457. Tabor Cltv. N.C. 28463 (CCRI -4862) NORTH CAROLINA GENERAL WARRANTY DEED THIS D13131) made this 30'" day of Receutber . 2016, by and between GRANTOR I GRANTEE DIAN F. JOLLY, TRUSTEE OF THE DIAN F. JOLLY TRUST DATED THE 2" DAY OF NOVEMBER 2015 JONATHAN KYLE COX, a Free Trader; of the County of Columbus, State of North Carolina 102 Miriam Lane Tabor City, NC 28463 T1jo designation Grantor and Grantoe as used herein shall Include said parties, their heirs, successors, and assigns, and shall Include singular, plural, masculine, feminine or neuter as required by context. W1TNMSb.TH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in _ South Williams I Township, Columbus County, North Carolina and more particularly described as follows: All that certain tract of land containing eighty and six -tenths (80.6) acres, more or less, in South Williams Township, Columbus County, North Carolina, on the West side of the old Iron Hill Road, about 7 miles Southeast of the Town of Tabor City, North Carolinn, now in possession of Wilson H. Morris, bounded on the North by Eldra and Zeb Soles; on the East by lands of Eldra and Zeb Soles, Annie Norris, R.S. Fowler and Paul Norris; on the South by the lands of Paul Norris; and on the West by the lands of Arthur Norris, Eldra and Zeb Soles and being the lands surveyed and plotted by J.D. Long, Surveyor, on the 4th day of March, 1955, and more particularly described by plat as follows: Beginning at a stake In the old J.H. Soles corner and runs with the Eldra and Zeb Soles line North 30 degrees 30 minutes West 113.80 chains to a stake, formerly a ligbtwood pine at J.H. Soles' corner; thence continuing with said Soles' line South 66 degrees 15 minutes West 10.93 chains to an old stake formerly J.H. Soles and C.W. Joyner corner; theuce continuing NO T11ZEEXAMINATIONHASBEENMADE EW4M.Y CER TIFICA TION STA TING 0TIMERWME. The seller(s)fnrlher acknowledge the Information required jar IRS Form 1099 has been correctly slated to the Law Firm of Wright Worley, Pope, Ekster & Moss AL. L.C. Page I of 3 Book 1146 Page 391 with said Soles line South 16 degrees West 21.94 ebains to a stake, old C. W. Joyner and N.C. Norris corner; thence South 1.6 degrees West with Arthur Norris' line 31.66 chains to a pointer in the old N.C. Norris and .C.S. Fowler line; thence North 85 degrees East 3.12 chains to a stake in Paul Norris' line; thence with said Norris line North 85 degrees East 8.44 chains to a stain, old Calvin Soles and C.S. Fowler corner; thence with said Paul Norris line and beyond North 25 degrees 30 minutes East 10.79 chains to the old Calvin Soles' cornea; thence North 24 degrees 30 minutes East 10.18 chains to a stake on the West side of an old road; thence North 24 degrees 15 minutes East with Annie Norris line 26.56 chains to the beginning. LESS AND EXCEPT from the above -described tract, a tract in the Southwest corner of the above -described tract formerly known as the Wilson R. Morris tract which was conveyed to Nancy Faulk King and husband, Ottis L. King by Deed recorded In Deed Book 323, Page 494, CCR, and Deed Book 323, Page 491, CCR, with those Deeds being incorporated herewith by reference for further certainty of the description of the triangular lot carved from the Southwest corner of the above -described tract. TOGETHER WTM AND SUBJECT TO the right to use non-exclusive right-of-way easement as is described in Ingress, Egress, and Regress Easement recorded'. ­30. In RB 11.46, PG 3^ 86 , CCR, with that said Ingress, Egress, and Regress Easement being incorporated herewith by reference for further certainty of the location and description of the non-exclusive right-of-way easement. SUBJECT ,TO the limited rights of The Norris Revocable Trust dated June 12, 1996 and Its designated agents to use the existing cart way located on the above -described tract as a non- exclusive casement of right-of-way to harvest timher located on a tract of land owned by The Norris Revocable Trust Dated June 12, 1996 with the limited rights and conditions being more specifically set out in the Agreement As To Right o£-Way Easement recorded February 23, 2015 at 3:40 pm in RB 1103, PG 741, CCR, with that said Agreement being incorporated herewith by reference for further certainty of the terms set out therein. For chain of title see Deed recorded December 21, 2015 at 3:57 pm in RB 1122, PG 349, CCR, in favor of The Dian F. Jolly Trust Dated the 2ne Day of Novemb6r 2015. For tttrther chain of title see Certificate of post recorded In IM 1122, PG 348, CCR, Deed recorded In Deed Book 964, Page 180, CCR, and Deed recorded In Deed Book 238, Page 225, CCR. The Columbus County Tax Office identifies the above -described tract as property 10550 and as containing 80.17 acres. The property herelnabove described was acquired by Grantor by instrument recorded in., RD 1122, PG349, CCU A map showing the above -described property is recorded In Plat Book . page TO HAVE AND TO HOLD the eforeanid lot or parcct of land and all privlleges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants. with the Grantee, that Grantor is seized of the premises in The simple, has the right to convey live same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawfttl claims of all persons whomsoever except for the exceptions hereinafter stated. Title to the property hereinabove described is subject to the following exceptions: 1. Subject to property tax as assessed by the Columbus County Tax Administration. 2. Valid and enforceable easements as may appear in the chain of title. IN WITNESS WHEREOF, the Grantor has hereunto set his hand and seal, or If corporate, has caused this instrument to be signed in its corporate name by it-s duly uthorized officers and its seal to be hereunto affixed by authority of its Board of Directors, the day and year first above written. THE DIAN F. JOLLY TRUST DATED THE 2Nn DAY OF NOVEM 3ER 2015 BY: �QZ - {SEAT.,) DIAN F. JOL ,, TTr teetee Page 2 of 3 Hook 1146 Page 392 SEALrSTAMP NORTH CAROLINA, Columbus County. I, __ Suzette S. Leonard .allotaryPublic ofthe +� � Couniy and State aforesa€dd certify that Dian F. Jo1)y T=ep.,for The Dian e +� F. Jolly TEgst Dated the 2 Dan of November 2015 Grantor, personally appeared before me this day and acknowledged the execution of die foregoing ,,,.��� instrument. Witness my hand and official seal or stamp, this the 306 >> �aJ�����r day of - December 2016. LV►►'' (SEAL) �t��q My Commission Expires: 10-25-�2 17 NORTH CAROLINA COLUMBIA COUNTY The foregoing or annexed certificate of.%1�Zt Sl1- f IpQL.12� a Notary 'Public has been verified to have a Signature, seat or stamp and an expiration date. This instrument and this certificate are duly registered at the Date and time and in the book and page shown on the first page hereof. V's �`'k,l,w%A 9nCL=Register of Deeds for Columbus County Y' Deputy Register of Deeds Ret to:, U.JC"is Page 3 of 3 C "HERR" MULCH SITE boring 1 0-12 SL GR 12-20" SL GR 20-42 SL GR 42-48 CL 5 B K SOIL WETNESS 42" boring 2 0-12 5L GR 12-24" SL GR 24-48" SL GR SOIL WETNESS 24" boring 3 0-10 SL GR 10-24" SL GR 24-30 LS GR 30-42" LS GR 42-48" LS GR SOIL WETNESS 42" boring 4 0-6 SL GR 6-12" SL GR 12-36" CL SBK 36-48" LS GR SOIL WETNESS 12" boring 5 0-12 SL GR 12-30" SL GR 30-40 LS GR 40-48 LS GR SO L W FTN ESS 40" boring 6 0-10 SL GR 10-12" SL GR 12-48" CL SBK 48-50 CL SBK SOIL WETNESS 48" boring 7 0-12 SL GR 12-16" SL GR 16-28 SL GR VFR VFR VFR FI VFR VFR VFR VFR VFR VFR VFR VFR VFR VFR FI VFR VFR VFR VFR VFR VFR VFR FI FI VFR VFR VFR NEXP 2.5Y 4/3 NEXP 2.5Y 5/4 NEXP 10YR 5/6 SS,SP 10YR 5/6 2,5Y 6/1, 2,5Y 7/2 NEXP 2.5Y 4/3 NEXP 2.5Y 5/4 NEXP 10YR 5/6 2.5Y 6/1, 2,5Y 7/2 N EXP N EXP NEXP NEXP NEXP NEXP NEXP SS,SP NEXP NEXP NEXP NEXP NEXP 2.5Y 4/3 2,5Y 5/4 10YR 5/8 2.5Y 4/2 25Y 4/3 2.5Y 6/1 7.5YR 5/8 2.5Y 3/1. 2.5Y 7/3 25Y 6/1 10YR 5/8 2.5Y 6/1 2.5Y 4/3 10YR 5/8 10YR 518 2.5Y 6/4 10YR 5/8 7.5YR S/8 2.5Y 6/2 N EXP 2.5Y 4/3 N EXP 10YR 5/8 SS,SP 10YR 5/8 SS,SP 10YR 5/8 7.5YR 5/8 2,5Y 6/1 N EXP 2.5Y 4/3 N EXP 10YR 5/8 N EXP 10YR 5/8 28-48 SL GR VFR NEXT' 10YR 5/8 7.5YR 5/8 2.5Y 6/1 SOIL WETNESS 28" boring 8 0-6 SL GR VFR NEXP 2.5Y 4/3 6-14" SL GR VFR NEXP 10YR 5/8 14-49" SL GR VFR NEXP 10YR 5/8 2.5Y 6/1 7.5YR 5/8 48-48 SL GR VFR NEXP 10YR 5/8 7.5YR 5/8 2.5Y 6/1 SOIL WETNESS 14" boring 9 0-14 SL GR VFR NEXP 2.5Y 4/3 14-18 SL GR VFR NEXP 10YR 5/8 18-36 SCL SBK FI SS,SP 10YR 5/8 2.5Y 6/1 7.5YR 5/8 36-48 SL GR VFR NEXP 10YR 5/8 7.5YR 5/8 2.5Y 6/1 SOIL WETNESS 18" boring 10 0-10 SL GR VFR NEXP 2.5Y 4/3 10-24" SL GR VFR NEXP 10YR 5/4 24-30 SL GR VFR NEXP 10YR 5/8 30-42 SL GR VFR NEXP 10YR 5/4 42-48 SL GR VFR NEXP 10YR 5/4 2.5Y 6/1 SOIL WETNESS 42" boring 11 0-6 SL GR VFR NEXP 2.5Y 3/1 6-12" SL GR VFR NEXP 2.5Y 7/3 12-36" CL SBK FI SS,SP 2.5Y 6/1 10YR 5/8 36-48" LS GR VFR NEXP 2.5Y 6/1 SOIL WETNESS 12" boring 12 0-6 SL GR VFR NEXP 2.5Y 3/1 6-12" SL GR VFR NEXP 2.5Y 7/3 12-36" CL SBK FI SS,SP 2.5Y 6/1 10YR 5/8 36-48" LS GR VFR NEXP 2.5Y 6/1 SOIL WETNLSS 12" 1003 Gregor;} Fork Road Richlands, NC 28574 Phone (910)330-2784 pittiiiansoil@yahoo.com August 5, 2019 Ref: JONATHAN KYLE COX Site location; Shug Norris Road, Columbus County A soil evaluation was conducted on the proposed composting site listed above. The purpose of this evaluation was to classify the soils and land features within the proposed composting site. The evaluation was conducted with a hand auger and consisted of auger borings and soil profile descriptions utilizing the Munsell Soil Color Chart. A map and detailed soil descriptions have been prepared and are attached to this document. The soi1S within the composting area were found to be Echaw, Blanton sand, Leon, Foreston, Gritney, Lynchburg, Torhunta, Muckalee, and Aut>yviIle, The Torhunta and Muckalee areas showed soil wetness of less than 12" from the surface. The remainder of the soils present showed soil wetness of 12" to 50" below the surface with no restrictive horizons within 4 feet of the soil surface, The soils showed good structure and good internal drainage. The map also shows the location of a pond and ditches present on the property. If you have any questions please feel free to contact me at 910-330-2784. Thank You. Sincerely, Dlgitallysigned by R. R7 NAYWOOD PFTTMAN II R ' ON: m=R. HAYWOOD ti PITTMANIIo�PITTMAN HAYWOODSOII CONIITiNG, au, email=piltmansoll@yahoo. .o, . PITTMAN ! I Date 2 19.06.0521.46:15 -04'00' R, Haywood Pittman 11 NC Licensed Soil Scientist 4-T"kc14 A, "T- S Certification by Land Owner (if different from Applicant): hereby certify that I have read and understand the application submitted by for a permit to operate a compost facility on land owned by the undersigned located at (address) NC, in Page(s) (city) County, and described in Deed Book and I specifically grant permission for the proposed compost facility planned for operation within the confines of the land, as indicated in the permit application. I understand that any permit will be issued in the names of both the operator and the owner of the facility/property. I acknowledge that ownership of land on which a solid waste management facility is located may subject me to cleanup of said property in the event that the operator defaults as well as to liability under the federal Comprehensive Environmental Responsibility, Compensation and Liability Act ("CERCLA"). Without accepting any fault or liability, I recognize that ownership of land on which a solid waste management facility is located may subject me to claims from persons who may be harmed in their persons or property caused by the solid waste management facility. I am informed that North Carolina General Statute 130A-22 provides for administrative penalties of up to fifteen thousand dollars ($15,000) per day per each violation of the Solid Waste Management Rules. I understand that the Solid Waste Management Rules may be revised or amended in the future, and that the siting and operation of the facility will be required to comply with any such revisions or amendments. Signature Print name NORTH CAROLINA County Date Notary Public for said County and State, do hereby certify that personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the day of , 20_ (Official Seal) Notary Public My commission expires Signature page ofapplicant — Name of facility certify under penalty of law that this document and all attachments were prepared under my direction or supervision and that the information provided in this application is true, accurate, and complete to the best of my knowledge. I understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to fifteen thousand dollars ($15,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that the facility siting and operations of this solid waste management facility will be required to comply with all such revisions or amendments. Signature Print Name date Title Business or organization name TCPOGRAPHIC SURVEY FCR PRELIMINARY JONATHAN KYLE COX NOT FOR RECORDATION, "HERR" MULCH SITE CONVEYANCES OR 1AL61 CURRENT DYNERi JONATHAN KYLE COX SOUTH WILLIAMS TOWNSHIP COLUMBUS COUNTY, N.C. JUNE 28. 2019 SCALE: I" - 200' PRELIMINARY DOUNDARY ACREAGE 6f.33 ACRES +I- } I 4..k: !•. a 1H.1!' LOCH IRN ETCH f + + NOT l0 SCRALEi r Ham• + y + + + + + K + + 4 + } w + f + t �' r + .sE BENCHMARK "D" + } + + } } 1� NAIL SET GROUND COGRDWATES NA 32,815.88' AY + yf GROUND COOROWAIES E:2.D65.676.48' + Fp ELEVATOR 57.52' Er + 9 + TB + u' ll + + + Hr 6 + + } } + + + # p FT + �a + + + s + r + f t[ + + + + + + + + + 3• + k g � } FI ry + + Im i AY + + j + spin aY . Z + rtr + pp + + l--_— - %,I lrt ASAP t A M • E4 ey C, . B:rO' a fnl Ne • uf0• ND h `i + F F + E � � F r } r BENCHMARK "A° OLD HAIL IN HIGHWAY CENTER UNE + + GRID CITORDINATSS N:130448.2 4 Rub CRID COORDINATES E7.O 67,2943 LINATESE: 349E 29.E PRELIMINARY LDN&I DE:-7947'21304 COMBINED fACTCN: 1.00wAw EVVATION - 91.60° N07 FOR RECORDATION, CONVEYANCES OR SALES DATE PROJE T No, KOM vmlEYwc AND uwvWc 190667 a ELEVATIONS NERFM ARE NEAR SEA LEVEL, (PAR" NAV9 eel OIASED @I HDRrH EARWINA COITIMATISLY CFERArIN5 REFERCHM STATIONS, LL Ipa cawlrypVAE xWAlq JOU No. wTE%._M KC RBATT 190667T IEL/fAx 910.R'297R ORAYANG NO. • TIC$ RRPERTY IS SUBJECT TO ANY AND ALL EAEVEMTS ANDM RIGHT-9F-WAYS Or GLOOM UI3]ISE NM1 C-6/B6 TOPOGRAPHIC SURVEY FOR PRELIMINARY JONATHAN KYLE COX NOT FOR RECORDATION, "HERR" MULCH SITE CONVEYANCES OR SALES CURRENT OWNER! JONATHAN KYLE COX SN7uTH YIL#ANTS TOWNSHIP CCLUMOUS COUNTY, N.C. JUNE 28, 2019 SCALE: 1" = 200' FREUNINARY 8OUNDARY ACREAGE 81.33 ACRES +!- -1, -1 + rqp a Iralr + MW + fmi mrrJ + rs'try Awm h. a uSa' + + Sz. + \-�L + '1P' + +\ \iL\11} + Locar�oiv sK�rcH + + N' TO Sc + + + 3' + + + d + + } + + + + + ! +I� + + + + + + R + + + BENCHMARK "D" + + 3 + NAIL SET GROUND OD UINATES N:172.667M I9' + A., LiEd1Nd COOROINATES E: 2,065,878.48' + + eT 9 ELEVATION - 6MV + + ew+ F + !1 P 3 + J9 + 65' u + + + + + Fl + + + h, + + 7 F9 + + + + + + + IL + + + Aq T + k + + + + + ++ + Fr + + I6Ms + + n +Fl + + + + Ii1 !2.7m a TeWI Sa,N hi . 6[Ai' 4 + y, C it x O + +v.�" + ml $ 6 ' E o 9 0 qy + YnA + + �+ @. � rro o�rwrr ,� + rtx' + + rn o�rri 4 BENCHMARK "A" $ OHO NAIL IN HICJIWAY CENTER LINF + CHID COOROINATES N;ISg449.2 + Y h GRID DOORGHATES F:24 6 624 IAPNDE: 74T1829.62 PRELIMINARY LONCI DE:-78'4723.394 5 CUM BINED FACTOR: 1.00007098 EZEVATIOII = 91.80 NOT FOR RECORDATION, 1 CONVEYANCES OR SALES GATE SOLr a WALIIEB, P.A.. P.LS. PROJECT Na. 7roEss: 06�28�19 suRxWxc AHo wma 190667 a ELEVATIONS HIEWON A NEM SEA FEVEL. (BATOY NAVD DID 104 C ` WSC SCDABC JOBcNo. ((BASED DR MIRTH CA IL [Ofll) 6 Y I ERATRIG RFSEREHCE STATIONS. Mn uU:, N.G 29472 190667T CDDRDIHATES HEREON ARE NC CAILL TDATOI NAD9X2011_MpS> RTYH C SCALE: .� 200� 7a/lir: 9........ 2 DRAWING NO. r07H SD rRW ISA.SUBJi TG ANY NC]Y ALLREASLKEHTS ANOAR RIG"T-UF-VAYS OF RLCOI 1 = U FUSE N0.C-0490 d�� F?y �,��d• .� :� AuBAuB frf� "rts Wt�. S i :�'ryS t RE7IGF M �i Ec PG SmL EVALVA'RON SHUG NORRIS ROAD iRR E , Yx{ 777 GYB Po BnB LY BnB GyB EC E] EC—ECHAW LOAMY SAND —SOIL WETNESS CONDITION FOUND TO BE 36--48" BnB—BLANTON SAND —SOIL WETNESS CONDITION FOUND TO BE 42-50" Ln—LEON SAND —SOIL WETNESS CONDITION FOUND TO BE <12"-14" Fo—FORESTON—SOIL WETNESS CONDITION FOUND TO BE 24-40" GYB--•GRITNEY—SOIL WETNESS CONDITION FOUND TO BE 18-36" Ly—LYNCHBURG—SOIL WETNESS CONDITION FOUND TO BE 12-18" To— TORHUNTA— SOIL WETNESS CONDITION FOUND TO BE <12"-12" Mu—MUCKALEE—SOIL WETNESS CONDITION FOUND TO BE <12" 0 AU—AUTRYALLE—SOIL WETNESS CONDITION FOUND TO BE 36-48" POND IALUA7ioN DITCHES 9dl �ONRILANO nas rn,Wro Wo ,.c�rx was euvuro usw ra.a wr. un ��xn r+cs, rrw wrh w/a cauartu 6 w etc wa�,m "m pftmr nn itt�4a ids i�a mirw�s avian p L'c'�"y RsH I• 7ry� !II Ai�fn + + C+u r5'CAo + + + ,'zb rs - tAM' + ; ++ems + rboe + .(r. ,4r ++ +ice A + SY i + + Sr + + + s T V � fi + + + r + j + r + i + .p9 i' 29 .y 7� + u o- + + tr + + zt ' + + + h• l i. + + r d ra ti - . + + + a + 4 t + } + + �. + s + + r U— + i ++. + + xr + * , �+ + Irmr I + + ��r + + �J + + + + yt. ` ��. +Zk r2•FA� �• rk t+ iz - CdPP' + b + �r �' 'P7 r;'Aip + hi . A -i2 A3C+fik � EiIJ' ry. 6f Agfy )[.Ay (Lv COW.) FiLliCiiMARK "A" grrr�..�+wa DA NA' IN HI@TNAY LYNiEA LINE { } GRID CU.'.WTUATES it. 13D,A69.29 GRID CWPOWATE5 E:2,W C25,X, +�AhMIM 3R�3829.62tY rtaV Legend + • Initial Composting Area Rw •+ Proposed Retention Pond 25' P6,aty Barre, North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section waste Managemenr ERVIAO"NERFAL QUAUTT 9-25-17 COMPOST FACILITY LARGE TYPE 1 PERMIT APPLICATION GUIDANCE The N.C. Compost Rules are located in 15A NCAC 13B .1400 et seq., and can be viewed online on our compost webpage: http:l/deg.nc.govZabout/divisions/waste-management/solid-waste- section/composting. For Small Type 1 facilities (see Rule .1402 (f)) producing mulch or compost, a permit is not required but a notification form must be submitted annually, instead of an application: http://deg.nc.gov/about/divisions/waste-mana,gement/waste-management-permit-guidance/solid- waste-section/yard-waste. There are three types of permit actions: A "new permit" means an application for a permit for a facility that has not been previously permitted by the Department. A significant expansion, change in the boundaries of a permitted facility, or change in the facility type may be considered a new permit for permit fee purposes. A "permit amendment" means (1) an application for the five-year renewal of a permit for a permitted facility, or (2) an application that proposes a change in ownership or corporate structure of a permitted facility. A "permit modification" means an application for a change to the plans approved in a permit for a compost facility. A significant expansion or change in the boundaries of a permitted facility may be considered a new permit for permit fee purposes. A complete application for a compost facility permit shall consist of drawings and other required information submitted in report format in a binder. One paper copy and one electronic (pdf) copy of the application report should be submitted. The electronic copy can be sent by email, FTP, or on a CD. The drawings must be included in the electronic copy. An annual fee of $500 is required for large compost facilities. An application for a new permit is $50. For a new permit application or permit amendment/renewal application, a compliance history review will be required of the owner and operator of the facility, in accordance with State statutes. After the application is submitted, the owner and operator will be sent a letter requesting compliance history information, and parent, subsidiary, or other affiliate information, which is required in order to complete the application. The Solid Waste Section reserves the right to ask for additional information as determined necessary. This guidance is not a substitute for the applicant reviewing and understanding the applicable North Carolina Statutes and Administrative Code. Questions regarding an application should be directed to the Solid Waste Section, Phone 919-707- 8200. Applications should be sent or brought to the following address: By Mail or Delivery Service: In Person: NC DENR, Division of Waste Management NC DENR, Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, NC 27699-1646 Solid Waste Section 217 West Jones St. Raleigh, NC 27603 An application for a new permit should address all Sections as listed below. An application for a permit amendment (permit renewal) should address Sections 1, 3, 4, and 6 (site plan drawing only). An application for a permit modification should address Sections 1, 3, 4; and Sections 2 and 6, if the proposed site changes affect siting requirements. Compost Facility Application Report Format and Contents Letter of transmittal, which states desired Department action (including whether the request is for a new permit, permit amendment, or permit modification) Title page Table of Contents Section 1— General Information - Provide a narrative discussion, including the following: 1. The name of the facility or proposed facility. Street address of the facility. Include a statement that the facility is or will be Large Type 1. 2. Name, address, telephone number, and email address of the applicant/owner and contact person. 3. Name, address, telephone number, and email address of the landowner, if not the applicant. A landowner authorization form must be signed and notarized if the facility owner/operator is not the landowner (see attached form). 4. Location of the facility. Include the county location, and proximity to nearest town or city. If the property was previously used for solid waste management activities, provide a description of the operation including a history of permits or approvals issued, and a map with boundaries. Describe any other commercial or industrial use of the property. Section 2 — Siting Requirements — For new sites, or site expansions, provide a narrative discussion that includes the following items: 1. Provide a map showing the property parcel boundaries and parcel ID information (this can usually be obtained from the County's GIS website). 2. In an appendix, provide a legal description of the property and a complete copy of the current land deed. Also provide a copy of any available current plats or survey drawings of the property. Reference these items in the text of this section. 3. In an appendix, provide a letter from the appropriate City or County official confirming that the siting of the facility will be in conformance with all zoning and local laws, regulations, and ordinances, or that no such zoning, laws, regulations, or ordinances are applicable. Reference the letter in the text of this section. 4. Provide a copy of the FEMA Flood Insurance floodplains map for the area, with the site property marked on the map (appendix or within the section). Discuss compliance with Rule .1404 (a)(1), 5. For sites that potentially contain wetlands, provide a letter from the Army Corps of Engineers that addresses the wetlands determination for the property, and compliance with requirements, if applicable. Include letter in an appendix and reference the letter in the text of the section. 6. Address compliance with Rule .1404 (a)(7), concerning sites located over a closed out disposal area. 7. Address compliance with the soil texture requirements or pad requirements of Rule .1404 (a)(10)(B). Provide a soil evaluation of the site conducted by a soil scientist down to a depth of four feet, or to bedrock or evidence of a seasonal high water table, to evaluate all chemical and physical soil properties and depth of the seasonal high water table. Include the report in an appendix, and reference the report in the text of the Section. Section 3 - Design and Operation Plan -T- Provide a narrative discussion, broken into appropriate sections, that includes the following items: 1. Total acreage of the property and the size of the actual compost area. The compost area includes unloading areas, mixing/processing areas, composting and curing areas, and feedstock storage areas. 2. List the types of feedstocks to be accepted (for example, yard waste, land clearing debris, etc.). For each material, list the sources and indicate whether it will be accepted from the general public. 3. Provide an estimate of the total amount of materials to be received at the facility per day, week, or month, in tons or cubic yards. Provide an approximate amount for each type of feedstock to be received, per day, week, or month. Describe any seasonal variation for any of the materials. 4. Estimated design capacity of the facility. The site capacity is the incoming volume, or throughput, per year, and is based on the compost method, duration of the process, and the size of the facility. 5. Description of the compost method (turned windrow, static aerated pile, etc.). 6. Methods used for grinding, mixing, and proportioning materials, as applicable. Plan for balancing the carbon and nitrogen ratio ("browns" and "greens"). 7. Describe compliance with the requirement that temperatures of at least 131OF be maintained and measured in the compost piles for 3 consecutive days, and the piles aerated to maintain elevated temperatures. Describe location of monitoring points, probe depth (at least 24 to 36 inches), monitoring frequency, and recordkeeping. The thermometer should be a probe thermometer, and it should be stated that it will be calibrated at least once per year. Onsite calibration using ice water is an acceptable method. 8. The method of aeration provided, and frequency, for both composting and curing piles. 9. A narrative description of the compost process, from beginning to end, to include arrival of materials, unloading, storing, grinding, mixing, composting, curing, final product storage, and removal from site. Identify the location that each of the activities takes place. Provide the anticipated process duration for each stage of the process, including receiving, preparation, composting, curing, and distribution. Describe distribution and ultimate use of the finished compost. 10. If the site will have a separate mulching operation, provide a narrative description from beginning to end, to include unloading of materials, material storage, grinding, mulch storage, and removal from site. Identify the location that the activities take place. Provide the estimated length of time for storage onsite. Describe distribution and ultimate use of the mulch. 11. Pile sizes for feedstock, composting, curing, and final product storage (width and height). Length is unlimited within the permitted boundary of each area. Describe distance between rows, to provide vehicular access in the event of a fire. Storage of wood debris, mulch, and finished compost should be in rows no larger than 50 feet wide and 30 feet high. 12. A process flow diagram of the entire facility, including the type, size, and location of all major equipment, and feedstock flow streams. Also include plans and specifications for the facility, including manufacturer's performance data for all equipment selected. 13. Surface water control features, including run-on and run-off. Grading and sloping of site surface to prevent ponding of water. Surface water must be diverted from the operational, compost curing, and storage areas. 14. Method for screening loads for unacceptable waste. Describe plan for handling incoming loads that contain unacceptable waste. Describe storage of the unacceptable waste, the frequency of removal of the waste (at least weekly), and final disposition. 15. Site security and access control. The site must be secured by gates, chains, berms, fences, or other measures to prevent unauthorized entry. 16. List of personnel required and the responsibilities of each position. 17. Confirm that an operator will be on duty at the site at all times while the facility is open for public use to ensure compliance with operational requirements. 18. Confirm that access roads will be of all-weather construction and maintained in good condition. 19. A list and description of the equipment, scales, structures, and any other compost management devices. Also describe equipment maintenance. 20. Signs to be posted at the entrance. Signs must provide a description of the types of materials received, the types of waste prohibited, operating hours, permit number, and emergency contact phone numbers. The sign should state that no hazardous waste, asbestos containing waste, or medical waste can be received at the site. The application should state whether the site will receive materials from the general public. 21. Discuss compliance with the following buffer requirements: 50-foot buffer to the property line, 200-foot buffer to residences, 100-foot buffer to wells, 50-foot buffer to perennial streams/rivers, and a 25-foot buffer to ditches and berms (to allow vehicle access in the event of a fire). Buffer requirements apply to unloading areas, composting and curing areas, processing areas, and feedstock storage areas. Finished compost may be stored within the buffer. 22. Permanent boundary markers may be required, depending on the layout of the site, to maintain the operation's required setbacks to the property line or to other nearby residences, wells, floodplains, etc. If natural or existing benchmarks don't exist, include a description of the boundary markers, installed at intervals to allow for line of sight from one marker to the next. 23. Describe recordkeeping and annual reporting in accordance with Rule .1408 (b), (c), and (d). Plan should indicate that a copy of the permit, operations plan, and site drawings will be kept on site at all times. Provide a copy of the temperature log forms. 24. For new or modified sites in which construction will disturb natural soils, a copy of the sedimentation and erosion control plan and permit if required by local governments and/or the NC Division of land Resources. Include summary, maps, and informational pages, but do not include calculation pages. 25. Plan for fire prevention and actions to be taken in the event of an accidental fire. Describe equipment provided to control accidental fires and arrangements made with the local fire protection agency to provide services when needed. 26. Plan for maintaining facility property in a sanitary condition and actions to be taken to minimize noise, vectors, and dust. Describe procedures to prevent dust from leaving the property boundary. 27. Contingency plans for wind, heavy rain, snow, freezing weather, equipment breakdown, spills, and other adverse conditions. 28. Site safety procedures concerning onsite equipment (especially grinders), safety during unloading and loading of materials, and any other possible site hazards to workers or the public. Section 4 — Signature Pages Place signature page(s) at the end of the application text, before the appendices. 1. Applicant signature page (see attached). 2. If the landowner of the property is not the applicant, the attached certification form by the land owner is required. Section 5 — Stormwater Discharge and Sedimentation and Erosion Control Plan For new facilities or existing facilities with proposed construction modifications, provide: 1. A copy of the sedimentation and erosion control plan and permit as required by local governments and/or the NC Division of Land Resources, 2. A copy of the DEMLR stormwater/process discharge application and permit. Section 6„—Drawing s Drawings should be drawn to scale and include: 1. An aerial photograph, where one inch is less than or equal to 400 feet, accurately showing the area within one-fourth mile of the proposed site's boundaries. It may be included in the Siting Requirements Section, if it can be appropriately sized 11x17. The following should be drawn or labeled on the photograph: a. Boundaries of entire property owned or leased by the person proposing the facility; 6 b. Location of all homes, wells, industrial buildings, public or private utilities, roads, streams, water bodies, intermittent streams/ditches, and other applicable information regarding the general topography within 500 feet of the facility. 2. Site plan drawing where one inch is less than or equal to 100 feet that delineates the following: a. Buffers from the compost area to property lines, residences, wells, and perennial streams/rivers and water bodies. The compost area includes unloading, mixing, storage, composting, grinding, and curing areas. b. Gates/fences or other access control features. c. Existing and proposed contours, at intervals appropriate to the topography. d. Location and elevations of berms, ditches, basins, and other water control features for the diversion and management of surface water. e. Labeled areas for unloading, storage, grinding, composting, curing, and final product storage. Illustrate the location of all piles and windrows onsite, including storage, active compost, curing, and finished compost. Drawings should show that all sides of storage areas for flammable feedstocks and compost will be clear and drivable, to provide vehicular access in the event of a fire. Identify areas for mulch operations, if applicable. f. Utilities and structures/buildings, existing and proposed. g. Other physical characteristics of the site, as applicable. +TrkcJ4 tl� s,oT" S Certification by Land Owner (if different from Applicant): I hereby certify that I have read and understand the application submitted by for a permit to operate a compost facility on land owned by the undersigned located at (address) NC, in (city) County, and described in Deed Book and Page(s) I specifically grant permission for the proposed compost facility planned for operation within the confines of the land, as indicated in the permit application. I understand that any permit will be issued in the names of both the operator and the owner of the facility/property. I acknowledge that ownership of land on which a solid waste management facility is located may subject me to cleanup of said property in the event that the operator defaults as well as to liability under the federal Comprehensive Environmental Responsibility, Compensation and Liability Act ("CERCLA"). Without accepting any fault or liability, I recognize that ownership of land on which a solid waste management facility is located may subject me to claims from persons who may be harmed in their persons or property caused by the solid waste management facility. I am informed that North Carolina General Statute 130A-22 provides for administrative penalties of LIP to fifteen thousand dollars ($15,000) per day per each violation of the Solid Waste Management Rules. I understand that the Solid Waste Management Rules may be revised or amended in the future, and that the siting and operation of the facility will be required to comply with any such revisions or amendments. S ` ture Print name NORTH CAROLINA County 2 a Date I A ry Public for said County and State, do hereby certify that )0 pe onally appeared before me this day and acknowledged the due execution of��� ;going instrument. °�(� �AIN'U^�v��9,o Wit n s ttd°at��o�1`16Y seal, this the day o 2061-4 � o > Notary P lic �`,�� My commission expires Signature page of applicant — Name of facility I certify under penalty of law that this document and all attachments were prepared under my direction or supervision and that the information provided in this application is true, accurate, and complete to the best of my knowledge. I understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to fifteen thousand dollars ($15,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that the facility siting and operations of this solid waste management facility will be required to comply with all such revisions or amendments. 1) OnAe'M' 0,)(- -6 20 Print Name Date Title Business or organization name