Loading...
HomeMy WebLinkAboutNCS01333_INSP_20191205FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Wake Closed MSWLF HHW White goods Incin T&P FIRM X PERMIT NO.: NCS-01333 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 12/05/2019 Date of Last Inspection: . FACILITY NAME AND ADDRESS: Mr. Subal Das Progressive Service Company 110 Fortune Way Raleigh, NC 27617 GPS COORDINATES: N: NA E: NA FACILITY CONTACT INFORMATION: Name: Subal Das Address: Same as above Telephone: 919-325-0180 Email address: subaldas@callprogressive.com PARTICIPANTS: Chester Cobb (DWM) and Ryan Mills STATUS OF PERMIT: Active EXPIRES: 12/31/19 PURPOSE OF SITE VISIT: New Vehicle STATUS OF PAST NOTED VIOLATIONS: NA OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1) Pumper vehicle(s) inspected: TRUCK LICENSE PLATE # VIN # TANK CAPACITY (gal) Temp Tags 3HAEKTAT8LL809579 4,000 2) All required information was present on both sides of the vehicle. Each letter was at least 3 inches in height. 3) The tank was made of steel and appeared to be structurally sound. No signs of weakness noticed with the tank. 4) Tank bolted to the frame of the truck. 5) Access ports appeared to be in working order and properly sealed. 6) Valve appeared to be in working order. Caps present on hose ports. 7) No leaks noticed. 8) Truck passed inspection. Email copy of inspection report to Ryan also at rmills@callprogressive.com. Driver side of truck. Please contact me if you have any questions or concerns regarding this inspection report. ____________________________________________ Phone: (919) 707-8283 . Chester R. Cobb, Environmental Program Consultant Division of Waste Management, NCDEQ Regional Representative Sent on: X Email Hand delivery US Mail Certified No. [ _]