HomeMy WebLinkAbout5203_INSP_20200514FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Jones
Closed
MSWLF HHW White
goods Incin C&D
T&P FIRM PERMIT NO.: 5203-CDLF-2013
CDLF X Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 14 May 2020 Date of Last Inspection: 14 October 2019
FACILITY NAME AND ADDRESS:
Maysville Construction and Demolition Debris Landfill
11710 NC Highway 17
Maysville, NC 28555
GPS COORDINATES: N: 34.93213 E: -077.24436
FACILITY CONTACT NAME AND PHONE NUMBER:
James E Maides
910.938.5900
FACILITY CONTACT ADDRESS:
Green Recycling Solutions, LLC
166 Center Street
Jacksonville, NC 28546
E-mail: jamesmaides@csbenc.com
PARTICIPANTS:
Kevin Dail; Green Recycling Solutions
James Maides; Green Recycling Solutions
Dave Wasiela; Wasiela Consulting, LLC
Ray Williams; DEQ-Solid Waste
STATUS OF PERMIT:
Active: Permit to Construct (PTC) Construction and Demolition (C&D) Landfill, Phase 2; Life-of-site Permit to
Operate (PTO) issued 28 October 2019. In accordance with 130A-294 (a 2), life-of-site ends when the facility reaches
its final permitted elevations or by 6 April 2075, whichever occurs first. Any significant site changes may require
permit modification. The owner or operator must contact the North Carolina Department of Environmental Quality,
Division of Waste Management, Solid Waste Section for coordination of significant site changes, including, but not
limited to, pertinent Site, Operation, and Waste Screening plans.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review/pre-construction Facility Compliance Inspection of
Phase 2.
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a Construction and Demolition (C&D) waste Landfill and a Temporary Disaster Debris
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20200514
Page 2 of 3
Staging Site (TDDSS).
2) This Facility is permitted to receive Construction and Demolition (C&D) waste as defined in NCGS 130A-
290(a)(4) generated in Carteret, Craven, Duplin, Jones, and Onslow Counties.
3) This Facility is currently operating in Phase 1.
4) This Facility is currently receiving C&D waste from the Maysville C&D Recycling and Recovery Facility,
permit #52-02.
5) This Facility does not accept wastes containing asbestos.
6) The Facility is secured by means of a locked gate at the Facility entrance. The gate was open upon my arrival
and Green Recycling Solutions Personnel were on-site during this Facility Compliance Inspection.
7) The Facility access road is of all-weather construction and is being well-maintained at this time.
8) Facility monitoring wells were reviewed during this Facility Compliance Inspection. All reviewed wells, were
readily accessible, secured with functioning locks, and properly labeled.
9) Permanent, highly visible, edge-of-liner markers delineating the waste disposal limits are maintained as
required.
10) Soil is stockpiled in an area adjacent to the landfill for use as weekly cover.
11) Windblown debris is being well managed at this time. No windblown debris was observed leaving the Facility
during this Facility Compliance Inspection.
12) The waste type was reviewed; only Construction & Demolition waste was observed and no unpermitted waste
streams were noted in the active disposal area during this Facility Compliance Inspection.
13) The active areas of the landfill are in need of additional cover. *Please ensure that all waste is being covered
with a minimum of six inches of soil at least once per week or when the active disposal area reaches ½ acre in
size, whichever occurs first.
14) The operator is in the process of regrading the outside slopes of Phase 1. *Please continue working to ensure
all outside slopes are properly covered and graded. Upon completion, please seed and mulch all outside slopes
to establish a cover crop suitable to prevent erosion of your landfill cap system. Please monitor the cover crop
to ensure that it is established and maintained as required. Any areas where germination does not occur should
be re-seeded and mulched promptly.
15) The leachate collection system and storage tanks were reviewed. The system appears to be functioning
properly and is well maintained at this time.
16) Groundwater monitoring well #5 is located within the Phase 2 expansion area. *This well should be
abandoned in accordance with 15A NCAC 02C and all pertinent abandonment records submitted to the Solid
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20200514
Page 3 of 3
Waste Section before construction of Phase 2 begins.
17) No off site erosion was observed during this Facility Compliance Inspection.
18) *Corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 22 May 2020 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; FOB Eastern District Supervisor/SWS: andrew.hammonds@ncdenro.gov
Kevin Dail; Operations Supervisor/Green Recycling Solutions: kdail.gwr@gmail.com
Dave Wasiela; Wasiela Consulting, LLC: dwasiela@wasielallc.com
Franky J Howard; Jones County Manager: fhoward@co.jones.nc.us
C: \2020\Jones\Facilities\52-03\Inspections\5203_INSP_20200514
NCDEQ DWM Laserfiche Online Document Management System:
https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=411&dbid=0&repo=WasteManagement
Go Green! Thank you for helping NCDEQ be environmentally responsible.