Loading...
HomeMy WebLinkAbout6708_INSP_20200513FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost SLAS COUNTY: Onslow Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 6708-MSWLF-1997 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Inspection: 13 May 2020 Date of Last Inspection: 31 October 2019 FACILITY NAME AND ADDRESS: MCB Camp Lejeune MSW Landfill Piney Greene Road Camp Lejeune, NC 28452 GPS COORDINATES: N: 34.69065 E: -077.32384 FACILITY CONTACT NAME AND PHONE NUMBER: Joe Powers 910.451.4998 FACILITY CONTACT ADDRESS: U. S. Marine Corps Camp Lejeune MSWLF C/o Commanding General AC/S Facilities (Maintenance/Utilities) CP Lejeune PSC Box 20004 Camp Lejeune, NC 28452 Attn: Joe Powers e-mail: joseph.powers@usmc.mil PARTICIPANTS: Lillian Malloy; Environmental Engineer/MCB Camp Lejeune EMD Steven Beckner; Landfill Operations Supervisor/MCB Camp Lejeune Gary J Denson; Recycling Coordinator/MCB Camp Lejeune Thomas Richard; Environmental Engineer/MCB Camp Lejeune EMD Pete Woodall; Landfill Services Director/MCB Camp Lejeune Ray Williams; NCDEQ/Solid Waste STATUS OF PERMIT: Active; Life-of-Site Permit to Operate (PTO) Phases I-IV issued 4 January 2019. In accordance with 130A-294 a (2), life-of-site ends when the facility reaches its final permitted elevations or by 30 December 2057, whichever occurs first. PURPOSE OF SITE VISIT: Partial Facility Compliance Inspection without records review. STATUS OF PAST NOTED VIOLATIONS: 1) 15A NCAC 13B .1604 (2) (A) states “Duty to Comply. The permittee shall comply with all conditions of the permit.” Resolved 2) 15A NCAC 13B .1604 (2) (I) states “Proper Operation and Maintenance. The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) which are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance includes effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20200513 Page 2 of 5 This provision requires the operation of back-up or auxiliary facilities or similar systems only when necessary to achieve compliance with the conditions of the permit.” Resolved OBSERVED VIOLATIONS: No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS section below ADDITIONAL COMMENTS: 1) This landfill is a lined Municipal Solid Waste Landfill. 2) This landfill is permitted to receive solid waste generated by and on Marine Corps Base Camp Lejeune, Marine Corps Air Station Cherry Point, and all related ancillary Marine Corps Facilities. 3) The landfill facility is secured by means of a locked gate at the facility entrance during non-operational hours. 4) Proper signage is posted at the entrance to the facility stating the permit number, contact information, and listing banned/excluded wastes. 5) Hours of operation for this Facility are Monday through Friday 7:30 AM to 3:30 PM, except the landfill is closed on ten holidays: New Year’s Day, Martin Luther King Jr Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day. 6) This Facility requires five-day advance notice for the receipt of asbestos containing materials. All received asbestos waste is disposed in an area adjacent to the working face, covered upon receipt, and mapped with a GPS unit. 7) Facility monitoring wells were reviewed during this Facility Compliance Inspection. All reviewed wells were readily accessible, properly labeled, and secured with functioning locks. 8) This facility manages landfill gas through a passive venting system. The gas vents appear well maintained, were clear of brush and other vegetation and are labeled for safety. 9) Overall, the closed areas of the landfill are well maintained with a well-established cover crop of native warm season grasses. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20200513 Page 3 of 5 10) Erosion of the landfill cap was observed on the eastern outside slope of Phase III. Cover and cap repair operations were underway during this Facility Compliance Inspection. *Please continue working to complete all repairs in a timely manner. All repairs should be completed to the specifications set forth in your approved Facility Construction Plans. 11) The facility access road is of all-weather construction and is being well maintained at this time. 12) Edge of liner markers have been installed throughout the landfill and are being maintained as required. 13) Construction of Landfill Phase IV has been completed. 14) This landfill is currently operating in Phase III. 15) Soil is stockpiled adjacent to the active working face for use as cover. 16) The working face is being maintained in a compact and manageable size. Operational compacting equipment was on-site and in use during this Facility Compliance Inspection. 17) The waste type in the landfill was reviewed; the waste type being disposed is MSW and no unpermitted wastes were observed during this Facility Compliance Inspection. 18) Attendants were present at the working face during this Facility Compliance Inspection. 19) Windblown debris is being well managed at this time. No windblown debris was observed outside the permitted disposal area during this Facility Compliance Inspection. 20) The damage observed to the perimeter berm of Cell #8 around the leachate pump station and noted in the previous FCIRs has been repaired. A portion of the liner system remains exposed pending completion of repairs. *Please continue working to complete all repairs in a timely manner. All repairs should be completed to the specifications set forth in your approved Facility Construction Plans. Upon completion of the repairs, construction quality assurance (CQA) documentation stamped by a licensed professional engineer shall be submitted to the Section. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20200513 Page 4 of 5 21) Liner system repair in the area of the Cell #8 leachate pump station is ongoing. *Please continue working to repair all damage that resulted from the washout in this area in a timely manner. Upon completion of the repairs, construction quality assurance (CQA) documentation stamped by a licensed professional engineer shall be submitted to the Section. 22) An area of ponding/standing water was observed along the eastern toe of Cell #8. An auxiliary pump is on order to pump this water to Phase IV for management by the leachate collection system. *Moving forward, this area should be maintained in such a way as to prevent the collection of surface waters. 23) The landfill stormwater management basins were reviewed. Overall, the ponds were clear of windblown litter and brush, and no areas of erosion were observed around the pond margins during this Facility Compliance Inspection. The stormwater management basin in the soil borrow area has been repaired and is being maintained as designed. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20200513 Page 5 of 5 24) The soil borrow area was reviewed. No areas of erosion were observed and no off-site erosion was noted during this Facility Compliance Inspection. 25) The on site Temporary Disaster Debris Site (TDDS) was reviewed during this Facility Compliance Inspection. The waste type being managed is vegetative only and adequate space is being maintained around the vegetative stockpile for maintenance and emergency equipment. 26) No off-site erosion was observed during this Facility Compliance Inspection. 27) *Corrective measures are required as a result of this Facility Compliance Inspection. Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report. Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative Delivered on 19 May 2020 by X Electronic delivery US Mail Certified No. [] cc: Andrew Hammonds, Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov Lillian Malloy; Environmental Engineer/MCB Camp Lejeune EMD: lillian.malloy@usmc.mil Steven Beckner; Landfill Operations Supervisor/MCB Camp Lejeune: steven.beckner@usmc.mil Gary J Denson; Recycling Coordinator/MCB Camp Lejeune: gary.j.denson@usmc.mil Thomas Richard; Environmental Engineer/MCB Camp Lejeune EMD: thomas.richard@usmc.mil Pete Woodall; Landfill Services Director/MCB Camp Lejeune: brian.d.woodall@usmc.mil C: \2020\Onslow\Facilities\67-08\Inspections\6708_INSP_20200513 NCDEQ DWM Laserfiche Online Document Management System: https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=235&dbid=0&repo=WasteManagement   Go Green! Thank you for helping NCDEQ be environmentally responsible.