Loading...
HomeMy WebLinkAbout46_N0570_INSP_20200514FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID Notified X YW Transfer Compost SLAS COUNTY: Hertford Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: N0570 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: May 14, 2020 Date of Last Inspection: February 29, 2016 FACILITY NAME AND ADDRESS: Rose Brothers Paving Co. 146 Rose Road Como, NC 27818 GPS COORDINATES: N: 36 °46442 E: - 77 °08559 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Tim Perry Telephone: 252-287-7829 Email address: tim.perry@rosebrotherspaving.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Tim Perry – Rose Brothers Paving John College – NCDEQ-DWM-SWS-FOB STATUS OF PERMIT: Notified Facility. No permit required. PURPOSE OF SITE VISIT: Routine Comprehensive Facility Compliance Inspection. STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS: 01 – This facility is secured by fencing and locking gate. 02 – Roads are made of all-weather material and maintained in good condition. 03 – This facility is located at the Rose Brothers Paving Plant. 04 – There is NO LCID material at this notified LCID facility. Concrete has been ground and used. 05 – Signage is present and is located at the LCID area. 06 – During this inspection, there was a small pile of construction and demolition waste noted the wasn’t generated on-site. This waste is in need of removal to a permitted facility. 07 – Mr. Perry is going to remove the waste and take it to The Bertie County Regional Landfill (0803-MSWLF) and keep landfill receipts. Please notify John College @919-268-1524 or john.college@ncdenr.gov when waste has been removed. 08 – A follow-up inspection will be conducted around 30 days of the issuance of this report to ensure compliance has been met. 09 – Digital pictures were taken during this inspection and some are attached to this report. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 919-268-1524 _ Email: john.college@ncdenr.gov Environmental Senior Specialist Regional Representative Sent on: May 19, 2020 X Email Hand delivery US Mail Certified No. [ _] Copies; * Andrew Hammonds, DWM Eastern District Supervisor – Solid Waste Section FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3