Loading...
HomeMy WebLinkAbout18044_LRMF EMail meeting minutes 20200401From:Box, Gordon H To:Matt Bramblett (mbramblett@harthickman.com); David Graham (dgraham@harthickman.com); Newton, Craig M;Miller, Kevin B; Lavender III, Charles R; Buddy Riggs (Abner.RiggsJr@terracon.com); Stenger, Allison K; Minnich,Carolyn Cc:Pilipchuk, John L; Box, Gordon H; Youngblood, Cheryl A Subject:P-5719 LRMF 4/1/2020 meeting minutes Date:Wednesday, April 15, 2020 3:47:26 PM Attachments:Meeting_minutes_20200401.doc.pdfimage002.png Please find meeting minutes attached. Thank you, Gordon Gordon Box, LG GeoEnvironmental Project Manager North Carolina Department of Transportation 919 707 6859 office 919 451 4203 mobile ghbox@ncdot.gov 1020 Birch Ridge Drive Raleigh, NC 27610 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. _____________________________________________________________ Facebook Twitter YouTube Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION GEOTECHNICAL ENGINEERING UNIT 1589 MAIL SERVICE CENTER RALEIGH NC 27699-1589 Telephone: 919-707-6850 Fax: 919-250-4237 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: CENTURY CENTER COMPLEX ENTRANCE B-2 1020 BIRCH RIDGE DRIVE RALEIGH NC DATE: TO: Meeting Participants FROM: Gordon Box, PG, GeoEnvironmental Project Manager SUBJECT: Minutes for Scoping Meeting/Conference Call P-5719 Phase IB, second phase of the development of the Charlotte Yard, Locomotive and Railcar Maintenance Facility (LRMF) in Charlotte, NC Date: Wednesday April 1, 2020 Participants: Craig Newton, DOT Rail Division, Kevin Miller and Charles Lavender III, DOT Geotechnical Engineering Unit, Abner Buddy Riggs, Jr. and Allison Stenger, Terracon, Carolyn Minnich, Brownfields (BF) Project Manager, Matt Bramblett and David Graham, Hart & Hickman, and Gordon Box DOT GeoEnvironmental Section. Notes: - LRMF Phase IA work is complete. - Design work for Phase IB will begin in June 2020. - 25% plans are anticipated to be available early 2021. - No additional right of way is anticipated to be acquired. - Craig Newton would like to begin Geotechnical work, while Geoenvironmental work is anticipated to be conducted after design work. - The Design is anticipated to include a significant soil cut. Thus, a cut will be required during construction and for installation of proposed drainage features. Some of that cut is anticipated to be in the Brownfields property. After 25% plans are available, H&H are anticipated to be tasked with geoenvironmentally delineating (horizontally and vertically) the extent of RCRA Hazardous material (i.e. lead highly impacted soil) that requires removal and to be tasked with developing a work plan to excavate and dispose of that material. (On the Phase IA project, there was a benefit 4/15/2020 to treating the excavated material, thus, reducing the leachable lead content, so the material would no longer be classified as RCRA Hazardous material, and that operation was conducted and the soil was therefore disposed at a local landfill, rather than being shipped out of state to a landfill that could accept material classified as RCRA Hazardous material. Also, the side slope of the proposed grade was over-excavated approximately 2' and backfilled with clean material. It is anticipated similar scope of work could be performed for Phase 1B). Geoenvironmental work by H&H would also likely include culvert excavation testing to the invert (~20' below existing ground surface) along the entire project, some of which may lie within the Brownfields, and some of which may lie in known or unscreened but suspected areas along the project (previous investigations stressed detecting right of way acquisition contamination issues; with a proposed design, other sampling may be appropriate, upon review). - H&H will need 25 % plans to prepare a scope of work for additional Phase II activities for BF and non-BF properties. - No Geotechnical test borings are anticipated to be conducted on the Brownfields (BF) property. However, Geotechnical workers will notify H&H and the GeoEnvironmental Section if that plan changes. - Geotechnical workers reviewed and scoped geoenvironmental concerns and responsibilities with GeoEnvironmental workers. Action items include: - Terracon will establish an independent Health and Safety Plan for the Geotechnical work. - Terracon will conduct the Geotechnical work (having conducted the previous LRMF Geotechnical work). - Carolyn Minnich will confirm if the existing Environmental Management Plan (EMP) is sufficient and relevant for proposed geoenvironmental sampling and geotechnical test borings (relevant if geotechnical borings need to be added to the scope). - Craig Newton will confirm with Norfolk Southern Railroad (NSR) the applicability of the existing or if there is need for a new environmental access agreement(s) for the minor grading excavation proposed within NSR ROW. - For BF property sampling, H&H will need to prepare a work plan for the BF program. (A new EMP might be needed for sampling, and/or Geotechnical test borings (if any to be done in the Brownfields Property) pending review of the current EMP by Carolyn Minnich). - H&H will conduct Geoenvironmental work (having conducted the previous LRMF Geoenvironmental work). - H&H will need to prepare a new EMP for construction activities for BF property. - Carolyn Minnich emphasized that no soil cuttings from outside of the Brownfields property should be brought into the BF Property, and if soil is sampled on the BF property, then all cuttings must be contained and disposed properly offsite, and the cap must be maintained and repaired as needed; The cap is a significant Land Use Restriction issue. Therefore, if sampling or conducting Geotechnical work on the BF property, workers will need to patch borings with asphalt or concrete and drum cutting and dispose of soil and properly abandon test borings so the existing and proposed elevations are protected. - Geoenvironmental sampling/Geotech work (if any) disturbance and maintenance of the cap must be documented in the Brownfields Property annual Land Use Restriction Update (LURU). Miscellaneous Notes: - H&H has provided Parcel 31 PSA report to DOT for Terracon, other reports are available for Terracon on DEQ portals and NCDOT server. - Zoladz (construction contractor for Phase 1A) continues to lease office/yard off of Summit Ave. - A contractor is still using the BF Property for a laydown yard area and is scheduled to do so for another year (this required BF Program permission and updates in the annual Land Use Restriction Update). GHB