Loading...
HomeMy WebLinkAbout6002_Mecklenburg_HolbrooksRoad_MSWLF_WellAbandonReplace_FID1394961_20200327DocuSign Envelope ID: 7B9CDC77-4316-4697-9884-9FA9D178EAA6 SMITH GARDNER ABBRESS TEL WEB 14 N. Boylan Avenue, Raleigh NC 27603 919,828.0577 www.smithgardnerinc.com March 27, 2020 Ms. Jaclynne Drummond NCDENR Division of Waste Management Asheville Regional Office 2090 Hwy. 70 Swannanoa, NC 28778-7043 RE: Closed Holbrooks Road Landfill Well Installment and Abandonment Closed Holbrooks Road Landfill Permit No. 60-02 Dear Ms. Drummond: Smith Gardner, Inc., (S+G) is pleased to present this letter report regarding monitoring well Installation and abandonment at the Closed Holbrooks Road Landfill. Monitoring well HRW- 9 had previously been damaged during site mowing and maintenance. The well was broken and not able to be repaired from the surface, therefore it required replacement. This work was performed in accordance with 15A NCAC 02C .0113. Well Abandonment S+G personnel, Geologic Explorations, and Mecklenburg County representatives mobilized at the Closed Holbrooks Road facility on January 28, 2020. Well abandonment procedure included attempting to remove a still in place bladder pump, removing the PVC stick up, and filling the void with sodium bentonite chips. The bladder pump was unable to be removed due to a break in the PVC riser. Grout was not able to be injected due to wet conditions not allowing the truck mounted water tank to be moved to the well. In lieu of grout, Geologic Explorations filled the void with sodium bentonite chips until level with ground surface, sodium bentonite chips were then hydrated. Removed PVC was disposed of properly. Well Installment Well installation occurred the same day as the above -mentioned abandonment. HRW-9R was installed adjacent to HRW-9's original location. HRW-9R was installed at a depth of approximately 42 feet below ground surface (bgs) using a 4.25-inch hollow stem auger. The well was constructed with 10-feet of 10-slot screen and sand in the annular space up to 2- feet above the top of the screened interval. The remaining well depth was constructed with solid PVC pipe. A 2-foot thick bentonite layer was emplaced above the sand pack and the remaining annular space was filled with bentonite grout. The well was finished with an outer steel casing set to approximately three feet above grade, a well cap, and lock. Construction records and boring logs are presented in Attachment A. DocuSign Envelope ID: 7B9CDC77-4316-4697-9884-9FA9D178EAA6 Ms. Drummond March 27, 2020 Page 2of2 If you have any questions or require additional information, please contact us at (919) 828- 0577 or by email below. r., A NS�r4RO Sincerely, � SMITH GARDNER, INC. A69 3/ 7/ <DocuSigned by:: JCrA c. r,2,, -. 388305C978EA4E6... Seth C. Rickerts Staff Geologist seth(dsmithgardnerinc.com DocuSigned by: V ��0 L 0 G` D6 B9779EBA711F488... Joan A. Smyth, P.G. Senior Hydrogeologist 0oan@smithgardnerinc.com Attachments: Attachment A - Well construction and abandonment records CC: FE DocuSign Envelope ID: 7B9CDC77-4316-4697-9884-9FA9D178EAA6 WLiLL l,VIN�5 IKU%-IIVIN KLLI,V" This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: JEREMY RINGLER Well Contractor Name A - 4422 NC Well Contractor Certification Number GEOLOGIC EXPLORATION, INC Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. County, State, Variance, etc) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ hmdustrial/Commercial ❑ Irrigation Non -Water Supply Well: El Aquifer Recharge El Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling ❑Municipal/Public El Residential Water Supply (single) ❑Residential Water Supply (shared) El Groundwater Remediation ❑ Salinity Barrier ❑ Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 F 4. Date Well(s) Completed: 01/28/20 sell ID# H RW-9R 5a. Well Location: WAYMER FLYING FIELD Facility/Owner Name Facility ID# (if applicable) 15401 HOLBROOKS ROAD HUNTERSVILLE 28078 Physical Address, City, and Zip MECKLENBURG County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 350 24' 06.84" N 800 49' 01.06" W 6. Is (are) the well(s): ❑] Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ONo If this is a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the back of this form. 8. Number of wells constructed: 1 For multiple injection or non -water supply wells ONLY with the same construction, you can submit one form. 9. Total well depth below land surface: 42.0 For multiple wells list all depths if different (example- 3@200' and 2@100') 10. Static water level below top of casing: 9.0 If water level is above casing, use "+" 11. Borehole diameter: 8.0 12. Well construction method: _ (i.e. auger, rotary, cable, direct push, etc.) (in.) AUGER 14. WATER ZONES FROM TO DESCRIPTION rt. rt. ft. ft. 15. OUTER CASING for multi -cased wells OR LINER if applicable) DIAMETER THICKNESS MATERIAL �ft- ft. I in. 16. INNER CASING OR TUBING eother at closed -loop) FROM TO DIAMETER THICKNESS MATERIAL 0.0 tt• 32.0 tt• 2.0 "• SCH 40 PVC ft ft in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 32.0 ft' 42.0 ft' 2.0 in. .010 SCH 40 PVC ft. ft, in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 270 ft' PORTLANDBENTONFE SLURRY ft. ft. rt. rt. 19. SAND/GRAVEL PACK (if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 30.0 tt• 42.0 tt• 20-40 FINE SILICA SAND rt. rt. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soil/rock type, grain size, etc.) 0.0 rt. 8.0 rt. SILTY SAND 8.0 tt• 17.0 rt• SILT 17.0 h 42.0 tt PWR rt. rt. rt. et. ft. fit. rt. er. 21. REMARKS BENTONITE SEAL FROM 27.0 TO 30.0 FEET 22. Certification: 01 /29/20 Signature of Certified Well Contractor Date By signing this form, I hereby certify that the well(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: (ft.) Division of Water Quality, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well construction to the following: Division of Water Quality, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Iniection Wells: In addition to sending the form to the address(es) above, also submit one copy of this form within 30 days of 13b. Disinfection type: Amount: completion of well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources - Division of Water Quality Revised Jan. 2013 DocuSign Envelope ID: 7B9CDC77-4316-4697-9884-9FA9D178EAA6 SMITH-.-GARDNER nberg County Project Number. Mecklenberg-19-2 Logged By. SCR BORING ID: HRW-9R Site Location: 15300 Holbrooks Rd, Huntersville, NC 28078 Boring Location: Holbrooks Road Closed Landfill Sheet: 1 of 1 Drilling Method: Direct Push/Hollow Stem Augers Monitoring Well Installed: YES Sample Type(s): N/A Boring Diameter: 4.25 inches Screened Interval: 32'-42' Weather: Partly Cloudy, Cold Ground Elevation 668 Date Started: 01128120 Depth of Boring: 42' DnAing Contractor: Geologic Ex lorations TOC Elevation: N/A Date Finished: 01128/20 Water Level. —5' C � m n a n £ w MATERIALS: Color, size, range, MAIN COMPONENT, minor s n o E @ t to g o m U component(s), moisture content, structure, angularity, maximum Monitoring Well Construction o a o grain size, odor, and Geologic Unit (If Known) Details E m J m to fq J 4) 2 1 2 0-3' 1 op soil 3 4 0-5' no 3-b' Dark grey, silty medium to tine sand. 5time 6 f drillina 7 5-1 U' Dark grey, silty medium to tine sand. 8 9 10 5-10, no 10-15' no 1 U-15' Dark grey, silty medium to tine sand. 11 12 13 14 15 15-20' no 15-2U' Dark grey, silty medium to tine sand. 16 17 18 19 20 21 22 23 24 25 20-25' no 20-2b' Dark grey, silty medium to tine sand. 26 27 21-3U' Dark Grey, tat clay with ethic fragments 28 25-30' no 29 30 29' Increased driung chatter 31 32 33 30-35' no 3U-35' Dark Grey, tat clay with rithic tragments 34 35 36 37 38 35-40' no 35-4U' Dark Grey, tat clay with ethic tragments 39 40 41 42 43 44 45 40-45' no 40-4b' Dark Grey, tat Clay with rithic fragments NOTES: Date I Time Depth to groundwater while drilling Checked by Date: