HomeMy WebLinkAboutSDTF7819_INSP_20200320FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: Robeson
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: SDTF-78-19
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF X FILE TYPE: COMPLIANCE
Date of Site Inspection: 3/20/2020 Date of Last Inspection: 11/21/2019
FACILITY NAME AND ADDRESS:
Rachel Locklear
2161 Evergreen Church Road
Pembroke, NC 28372
GPS COORDINATES: N: 34.68549 E: -78.83622
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Rachel Locklear
Telephone: (910) 671-0563
Email address: r_and_d_waste@yahoo.com
Fax: (910) 521-9310
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Connie Wylie, Rachel Locklear
STATUS OF PERMIT:
Active – permit expires March 31, 2021
PURPOSE OF SITE VISIT:
Routine
STATUS OF PAST NOTED VIOLATIONS:
N/A
OBSERVED VIOLATIONS:
N/A
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 2
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
ADDITIONAL COMMENTS
1. The currently permitted tanks (one 4,000 gallons and two 8,000 gallons) appear structurally sound.
2. It appears that septage is being transferred to/from the facility in a safe and sanitary manner. No leaks or spills
noted. No vectors or odors noted.
3. The approved setbacks are being met. No change in the facility. No application was received to add or replace a
tank.
4. The required signs are posted and the access road was in fair condition at this time.
5. Maintain the required 5 foot cleared radius (free of excess vegetation or debris) around the three tanks during
the coming warm weather months.
Please contact me if you have any questions or concerns regarding this inspection report.
_ Phone: (910) 433-3352
Connie S. Wylie
Regional Representative
Sent on: Email Hand delivery X US Mail Certified No. [ _]